Demographic table | No. of respondents | Percentage (%) |
---|---|---|
5 years | 44 | 60.3 |
6–10 years | 23 | 31.5 |
11–15 years | 5 | 6.8 |
≥16 years | 1 | 1.4 |
Undergraduate | 60 | 82.2 |
Master’s | 12 | 16.4 |
PhD | 1 | 1.4 |
Design consultants | 29 | 39.7 |
General contractors | 27 | 37 |
Client | 17 | 23.3 |
Project manager | 10 | 13.7 |
Architect | 12 | 16.4 |
Engineer | 20 | 27.4 |
Quantity surveyor | 9 | 12.3 |
Owner | 22 | 30.2 |
Residential construction | 29 | 39.7 |
Commercial construction | 18 | 24.7 |
Institutional construction | 24 | 32.9 |
2 | 2.7 | |
Industrial construction | ||
Small | 27 | 37 |
Medium | 43 | 58.9 |
Large | 3 | 4.1 |
ODF | 15 | 20.5 |
DBB | 24 | 32.9 |
DB | 12 | 16.4 |
Package deal | 2 | 2.7 |
Turnkey | 2 | 2.7 |
Develop and construct | 1 | 1.4 |
CM | 13 | 17.8 |
Management contracting | 2 | 2.7 |
Design and manage | 2 | 2.7 |
Total of questionnaires sent | 100 | |
Total of questionnaires received | 73 | |
Percentage of respondents | 73% |
Level of usage | ODF | DBB | DB | CM |
---|---|---|---|---|
4.03 | 4.36 | 3.22 | 1.49 |
Performance criteria and their indicators | Previous studies | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Abdul Rashid et al.(2016) | |||||||||||||||
A. Time | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||
B. Cost | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | |||
C. Quality | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ||||||
D. Scope | ✓ | ✓ | ✓ | ✓ | |||||||||||
1. Less compensable time of delays | ✓ | ✓ | |||||||||||||
2. Time overruns control during construction | ✓ | ✓ | |||||||||||||
3. Time saving | ✓ | ||||||||||||||
4. Rapid response to new order change | ✓ | ✓ | ✓ | ||||||||||||
5. Fast track construction | |||||||||||||||
6. Early start of construction | ✓ | ✓ | |||||||||||||
7. Meeting scheduled time | |||||||||||||||
1. Compensable costs | ✓ | ||||||||||||||
2. Contingency costs | ✓ | ||||||||||||||
3. Legal costs | ✓ | ||||||||||||||
4. Dispute and claim costs | ✓ | ||||||||||||||
5. Cost of insurance | |||||||||||||||
6. Cost of environmental issue | ✓ | ||||||||||||||
7. Managerial costs | ✓ | ✓ | |||||||||||||
8. Reworks costs | ✓ | ✓ | |||||||||||||
9. Maintenance costs | ✓ | ||||||||||||||
10. Change orders costs | ✓ | ||||||||||||||
11. Cost saving | ✓ | ✓ | ✓ | ||||||||||||
12. Reduction of financial risks | ✓ | ✓ | ✓ | ✓ | |||||||||||
1. Compliance with specification | ✓ | ✓ | |||||||||||||
2. Competence of project team | ✓ | ||||||||||||||
3. Change control | ✓ | ||||||||||||||
4. Material tests | ✓ | ||||||||||||||
5. Training and incentives for labour personnel | ✓ | ✓ | |||||||||||||
6. Supervision of work | ✓ | ||||||||||||||
7. Flexibility for innovation and new systems | ✓ | ||||||||||||||
8. Construction durability | ✓ | ✓ | |||||||||||||
9. Appearance of the building | ✓ | ✓ | ✓ | ||||||||||||
1. Meeting defined project scope | ✓ | ✓ | ✓ | ✓ | |||||||||||
2. Scope change control | ✓ | ✓ | |||||||||||||
3. Scope creep and gold-plating control | ✓ | ||||||||||||||
4. Set manageable requirement | ✓ | ||||||||||||||
5. Flexible scope of work | ✓ | ||||||||||||||
6. Fixed scope of work | ✓ | ||||||||||||||
7. Activities interference minimisation | ✓ |
Performance criteria | MS of project procurement systems’ influence level | Rank | ||||||
---|---|---|---|---|---|---|---|---|
ODF | DBB | DB | CM | ODF | GC | DB | CM | |
1. Compliance with specification | 3.63 | 3.60 | 4.26 | 4.34 | 2 | 2 | 5 | 5 |
2. Competence of project team | 2.16 | 3.63 | 4.30 | 4.95 | 8 | 1 | 4 | 1 |
3. Change control | 2.68 | 3.00 | 3.55 | 3.38 | 5 | 5 | 9 | 9 |
4. Material tests | 4.26 | 3.03 | 4.32 | 4.37 | 1 | 4 | 3 | 4 |
5. Training and incentives to labours | 2.97 | 2.40 | 3.93 | 3.39 | 4 | 8 | 6 | 8 |
6. Supervision of wok | 2.42 | 3.55 | 4.53 | 4.63 | 7 | 3 | 2 | 2 |
7. Flexibility for innovation and new systems | 2.00 | 2.37 | 4.59 | 4.63 | 9 | 9 | 1 | 3 |
8. Construction durability | 2.59 | 2.63 | 3.95 | 4.25 | 6 | 7 | 7 | 6 |
9. Appearance of the building | 3.00 | 3.00 | 3.36 | 3.41 | 3 | 6 | 8 | 7 |
Performance criteria | MS of project procurement systems’ influence level | Rank | ||||||
---|---|---|---|---|---|---|---|---|
ODF | DBB | DB | CM | ODF | GC | DB | CM | |
1. Less compensable time of delays | 3.14 | 3.00 | 4.63 | 4.45 | 1 | 4 | 1 | 1 |
2. Time overruns control during construction | 3.04 | 3.08 | 3.34 | 3.93 | 3 | 3 | 7 | 3 |
3. Time saving | 2.45 | 2.37 | 3.63 | 3.63 | 5 | 7 | 5 | 4 |
4. Rapid response to new order or change | 2.99 | 2.82 | 3.41 | 3.38 | 4 | 6 | 6 | 7 |
5. Fast track construction | 1.97 | 2.90 | 4.18 | 4.01 | 7 | 5 | 3 | 2 |
6. Early start of construction | 3.08 | 3.08 | 4.04 | 3.38 | 2 | 2 | 4 | 6 |
7. Meeting scheduled time | 2.37 | 3.41 | 4.22 | 3.49 | 6 | 1 | 2 | 5 |
Performance criteria | MS of project procurement systems’ influence level | Rank | ||||||
---|---|---|---|---|---|---|---|---|
ODF | DBB | DB | CM | ODF | GC | DB | CM | |
1. Meeting-defined project scope | 2.42 | 3.05 | 4.19 | 4.47 | 5 | 3 | 3 | 1 |
2. Scope change control | 3.15 | 3.49 | 4.25 | 4.33 | 3 | 2 | 1 | 2 |
3. Scope creep and gold plating (adding or altering features) control | 2.42 | 2.00 | 3.92 | 4.04 | 6 | 7 | 4 | 5 |
4. Set manageable requirements | 2.63 | 2.52 | 4.00 | 4.21 | 4 | 4 | 5 | 3 |
5. Flexible scope of work | 3.45 | 2.00 | 3.70 | 3.79 | 1 | 6 | 6 | 6 |
6. Fixed scope of work | 2.18 | 3.63 | 4.19 | 4.15 | 7 | 1 | 2 | 4 |
7. Activities interference minimisation | 3.26 | 2.37 | 3.52 | 3.60 | 2 | 5 | 7 | 7 |
Characteristic | Cronbach’s α | Reliability |
---|---|---|
(1) Level of usage of four most-utilised procurement systems in Rwanda | 0.880 | Good |
(2) Effect of ODF on performance indicators | 0.928 | Excellent |
(3) Effect of DBB on performance indicators. | 0.910 | Excellent |
(4) Effect of DB on performance indicators | 0.968 | Excellent |
(5) Effect of CM on performance indicators | 0.960 | Excellent |
Performance criteria | MS of project procurement systems’ influence level | Rank | ||||||
---|---|---|---|---|---|---|---|---|
ODF | DBB | DB | CM | ODF | GC | DB | CM | |
1. Compensable costs | 3.92 | 3.54 | 3.51 | 3.53 | 11 | 11 | 5 | 11 |
2. Contingency costs | 4.15 | 3.82 | 3.11 | 4.63 | 6 | 9 | 8 | 2 |
3. Legal costs | 4.41 | 4.00 | 3.00 | 4.04 | 4 | 6 | 9 | 7 |
4. Dispute and claims costs | 4.04 | 4.00 | 2.86 | 4.04 | 8 | 7 | 11 | 6 |
5. Costs of insurance | 3.37 | 3.33 | 3.37 | 3.37 | 12 | 12 | 7 | 12 |
6. Cost of environmental issues | 4.00 | 4.51 | 2.44 | 4.59 | 9 | 3 | 12 | 3 |
7. Managerial costs (consultancies) | 4.59 | 3.88 | 3.00 | 4.00 | 3 | 10 | 10 | 9 |
8. Reworks costs | 4.65 | 4.59 | 4.01 | 4.64 | 2 | 2 | 1 | 1 |
9. Maintenance costs | 4.10 | 4.29 | 3.41 | 4.41 | 7 | 5 | 6 | 4 |
10. Change orders costs | 4.37 | 4.37 | 3.58 | 4.37 | 5 | 4 | 4 | 5 |
11. Cost saving | 4.63 | 4.55 | 3.86 | 3.78 | 1 | 1 | 2 | 10 |
12. Reduction of financial risk | 4.00 | 3.96 | 3.67 | 4.00 | 10 | 8 | 3 | 8 |