Open Access

Assessment of interorganisational conflict in building refurbishment projects using EFA and PLS-SEM

   | Nov 25, 2023

Cite

Akintan, O. A., & Morledge, R. (2013). Improving the collaboration between main contractors and subcontractors within traditional construction procurement. Journal of Construction Engineering, 2013, pp. 1–11. doi: 10.1155/2013/281236. Akintan O. A. Morledge R. ( 2013 ). Improving the collaboration between main contractors and subcontractors within traditional construction procurement . Journal of Construction Engineering , 2013 , pp. 1 11 . doi: 10.1155/2013/281236 . Open DOISearch in Google Scholar

Ali, A. (2008). Integrative Mechanisms in the Design Process of Building Refurbishment Projects. Universiti Teknologi MARA, Shahalam, Selangor, Malaysia. Ali A. ( 2008 ). Integrative Mechanisms in the Design Process of Building Refurbishment Projects . Universiti Teknologi MARA , Shahalam, Selangor, Malaysia . Search in Google Scholar

Ali, A. (2010). Design information in managing refurbishment projects in Malaysia. The International Journal of Physical Sciences, 5, pp. 768–773. Ali A. ( 2010 ). Design information in managing refurbishment projects in Malaysia . The International Journal of Physical Sciences , 5 , pp. 768 773 . Search in Google Scholar

Ali, A. S. (2014). Complexity in managing refurbishment design process : Malaysian experience. Building Surveying, Facilities Management and Engineering, 15, pp. 1–5. doi: 10.1051/matecconf/20141501030. Ali A. S. ( 2014 ). Complexity in managing refurbishment design process : Malaysian experience . Building Surveying, Facilities Management and Engineering , 15 , pp. 1 5 . doi: 10.1051/matecconf/20141501030 . Open DOISearch in Google Scholar

Ali, A. S., & Au-Yong C. P. (2021). Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622–635. doi: 10.1108/IJBPA-01-2021-0005. Ali A. S. Au-Yong C. P. ( 2021 ). Risk factors in the refurbishment design process: The case of Malaysia . International Journal of Building Pathology and Adaptation , 40 ( 4 ), pp. 622 635 . doi: 10.1108/IJBPA-01-2021-0005 . Open DOISearch in Google Scholar

Ali, A. S., Peng, A. Y. C., & Ling, S. C. (2014). Managing refurbishment projects through selection of procurement system: The case of Malaysia. European Journal of Sustainable Development, 3(4), pp. 311–322. doi: 10.14207/ejsd.2014. v3n4p311. Ali A. S. Peng A. Y. C. Ling S. C. ( 2014 ). Managing refurbishment projects through selection of procurement system: The case of Malaysia . European Journal of Sustainable Development , 3 ( 4 ), pp. 311 322 . doi: 10.14207/ejsd.2014.v3n4p311 . Open DOISearch in Google Scholar

Ali, A., & Zakaria, R. (2012). Complexity of statutory requirements: Case study of refurbishment projects in Malaysia. Journal of Building Performance, 3(1), pp. 49–54. Ali A. Zakaria R. ( 2012 ). Complexity of statutory requirements: Case study of refurbishment projects in Malaysia . Journal of Building Performance , 3 ( 1 ), pp. 49 54 . Search in Google Scholar

Al-Sedairy, S. T. (1994). Management of conflict. International Journal of Project Management, 12(3), pp. 143–151. doi: 10.1016/0263-7863(94)90029-9. Al-Sedairy S. T. ( 1994 ). Management of conflict . International Journal of Project Management , 12 ( 3 ), pp. 143 151 . doi: 10.1016/0263-7863(94)90029-9 . Open DOISearch in Google Scholar

Ansari, R., Khalilzadeh, M., Taherkhani, R., Antucheviciene, J., Migilinskas, D., & Moradi, S. (2022). Performance prediction of construction projects based on the causes of claims: A system dynamics approach. Sustainability, 14(7), p. 4138. doi: 10.3390/su14074138. Ansari R. Khalilzadeh M. Taherkhani R. Antucheviciene J. Migilinskas D. Moradi S. ( 2022 ). Performance prediction of construction projects based on the causes of claims: A system dynamics approach . Sustainability , 14 ( 7 ), p. 4138 . doi: 10.3390/su14074138 . Open DOISearch in Google Scholar

Aziz, R. F., & Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), pp. 1515–1539. doi: 10.1016/j.aej.2016.03.006. Aziz R. F. Abdel-Hakam A. A. ( 2016 ). Exploring delay causes of road construction projects in Egypt . Alexandria Engineering Journal , 55 ( 2 ), pp. 1515 1539 . doi: 10.1016/j.aej.2016.03.006 . Open DOISearch in Google Scholar

Baudrit, C., Taillandier, F., Tran, T. T. P., & Breysse, D. (2019). Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models. Computer-Aided Civil and Infrastructure Engineering, 34(2), pp. 97–115. doi: 10.1111/mice.12391. Baudrit C. Taillandier F. Tran T. T. P. Breysse D. ( 2019 ). Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models . Computer-Aided Civil and Infrastructure Engineering , 34 ( 2 ), pp. 97 115 . doi: 10.1111/mice.12391 . Open DOISearch in Google Scholar

Bekele, A. (2015). Alternative dispute resolution methods in construction industry : An assesment of ethiopian situation. PhD thesis, School of Graduate Studies Addis Ababa University Faculity of Technology, pp. 1–147. Bekele A. ( 2015 ). Alternative dispute resolution methods in construction industry : An assesment of ethiopian situation. PhD thesis , School of Graduate Studies Addis Ababa University Faculity of Technology , pp. 1 147 . Search in Google Scholar

Bernstein, H. M., Joneset, S. A., Russo, M. A., Laquidara, D., Taylor, W., Ramos, J., & Lorenz, A. (2014). Managing uncertainty and expectations in building design and construction. 1st edn. In: Bernstein, H. M., et al. (eds.), SmartMarket Report. Bedford, McGraw-Hill Construction. Bernstein H. M. Joneset S. A. Russo M. A. Laquidara D. Taylor W. Ramos J. Lorenz A. ( 2014 ). Managing uncertainty and expectations in building design and construction . 1st edn. In: Bernstein H. M. , (eds.), SmartMarket Report . Bedford , McGraw-Hill Construction . Search in Google Scholar

Bhattacherjee, A. (2012). Social Science Research: Principles, Methods, and Practices. Textbooks Collection, University of South Florida,Tampa, USA. Bhattacherjee A. ( 2012 ). Social Science Research: Principles, Methods, and Practices . Textbooks Collection, University of South Florida , Tampa, USA . Search in Google Scholar

Bulleit, W. M. (2008). Uncertainty in structural engineering. Practice Periodical on Structural Design and Construction, 13(1), pp. 24–30. doi: 10.1061/(ASCE)1084-0680(2008) 13:1(24). Bulleit W. M. ( 2008 ). Uncertainty in structural engineering . Practice Periodical on Structural Design and Construction , 13 ( 1 ), pp. 24 30 . doi: 10.1061/(ASCE)1084-0680(2008) 13:1(24) . Open DOISearch in Google Scholar

Camelo-Ordaz, C., García-Cruz, J., & Sousa-Ginel, E. (2014). Antecedents of relationship conflict in top management teams. International Journal of Conflict Management, 25(2), pp. 124–147. doi:10.1108/IJCMA-06-2012-0054. Camelo-Ordaz C. García-Cruz J. Sousa-Ginel E. ( 2014 ). Antecedents of relationship conflict in top management teams . International Journal of Conflict Management , 25 ( 2 ), pp. 124 147 . doi: 10.1108/IJCMA-06-2012-0054 . Open DOISearch in Google Scholar

Cao, J., Liu, C., Wu, G., Zhao, X., & Jiang, Z. (2020). Work–family conflict and job outcomes for construction professionals: The mediating role of affective organizational commitment. International Journal of Environmental Research and Public Health, 17(4), p. 1443. doi: 10.3390/ijerph17041443. Cao J. Liu C. Wu G. Zhao X. Jiang Z. ( 2020 ). Work–family conflict and job outcomes for construction professionals: The mediating role of affective organizational commitment . International Journal of Environmental Research and Public Health , 17 ( 4 ), p. 1443 . doi: 10.3390/ijerph17041443 . Open DOISearch in Google Scholar

Cerić, A. (2021). Reducing information asymmetry and building trust in projects using blockchain technology. Gradjevinar, 73(10), pp. 967–978. doi: 10.14256/JCE.3310.2021. Cerić A. ( 2021 ). Reducing information asymmetry and building trust in projects using blockchain technology . Gradjevinar , 73 ( 10 ), pp. 967 978 . doi: 10.14256/JCE.3310.2021 . Open DOISearch in Google Scholar

Charkhakan, M. H., & Heravi, G. (2022). Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(19), pp. 1932–1950. doi: 10.1108/ECAM-11-2019-0651. Charkhakan M. H. Heravi G. ( 2022 ). Quantifying the predictability and preventability of conflicts between construction project parties . Engineering, Construction and Architectural Management , 30 ( 19 ), pp. 1932 1950 . doi: 10.1108/ECAM-11-2019-0651 . Open DOISearch in Google Scholar

Cheung, S. O., & Pang, K. H. Y. (2013). Anatomy of construction disputes. Construction Engineering and Management, 139, pp. 15–23. doi: 10.1061/(ASCE)CO.1943-7862.0000532. Cheung S. O. Pang K. H. Y. ( 2013 ). Anatomy of construction disputes . Construction Engineering and Management , 139 , pp. 15 23 . doi: 10.1061/(ASCE)CO.1943-7862.0000532 . Open DOISearch in Google Scholar

Chong, H. Y., & Zin, R. M. (2010). A case study into the language structure of construction standard form in Malaysia. International Journal of Project Management, 28(6), pp. 601–608. doi: 10.1016/j.ijproman.2009.09.008. Chong H. Y. Zin R. M. ( 2010 ). A case study into the language structure of construction standard form in Malaysia . International Journal of Project Management , 28 ( 6 ), pp. 601 608 . doi: 10.1016/j.ijproman.2009.09.008 . Open DOISearch in Google Scholar

Dada, M. O. (2013). Conflicts in construction projects procured under traditional and integrated systems: A correlation analysis conflicts in construction projects procured under traditional and integrated methods: A correlation analysis. International Journal of Construction Supply Chain Management, 3(1), pp. 1–15. doi: 10.14424/ijcscm301013-01-15. Dada M. O. ( 2013 ). Conflicts in construction projects procured under traditional and integrated systems: A correlation analysis conflicts in construction projects procured under traditional and integrated methods: A correlation analysis . International Journal of Construction Supply Chain Management , 3 ( 1 ), pp. 1 15 . doi: 10.14424/ijcscm301013-01-15 . Open DOISearch in Google Scholar

Diab, M., Mehany, M. (2021). Contingency Use and Project Delivery Influence on Infrastructure Project Risk Assessment. In: Ahmed, S.M., Hampton, P., Azhar, S., D. Saul, A. (eds) Collaboration and Integration in Construction, Engineering, Management and Technology. Advances in Science, Technology & Innovation. Springer, Cham. pp. 589–592,https://doi.org/10.1007/978-3-030-48465-1_97. Diab M. Mehany M. ( 2021 ). Contingency Use and Project Delivery Influence on Infrastructure Project Risk Assessment . In: Ahmed S.M. Hampton P. Azhar S. D. Saul A. (eds) Collaboration and Integration in Construction, Engineering, Management and Technology. Advances in Science, Technology & Innovation . Springer , Cham . pp. 589 592 , https://doi.org/10.1007/978-3-030-48465-1_97 . Search in Google Scholar

Doran, D., et al. (2009). Refurbishment and Repair in Construction Whittles Publishing, Dunbeath, Scotland, UK, pp. 11–314, IBSN 9781904445555. Doran D. , ( 2009 ). Refurbishment and Repair in Construction Whittles Publishing , Dunbeath, Scotland, UK , pp. 11 314 , IBSN 9781904445555 . Search in Google Scholar

Egbu, C. (1994). Management education and training for construction work within the construction industry. A Ph.D thesis submitted to the department of civil engineering and construction,university of Salford, Salford, UK. Egbu C. ( 1994 ). Management education and training for construction work within the construction industry . A Ph.D thesis submitted to the department of civil engineering and construction , university of Salford , Salford, UK . Search in Google Scholar

Gref, L. G. (2010). The Rise and Fall of American Technology. Algora Pub, New York, USA. Gref L. G. ( 2010 ). The Rise and Fall of American Technology . Algora Pub , New York, USA . Search in Google Scholar

Hair, Jr, J. F, Sarstedt, M., Hopkins, L., & Kuppelwieser, V. G. (2014). A primer on partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research. European Business Review, 26(2), pp. 106–121.doi: 10.1108/EBR-10-2013-0128. Hair J. F. Jr Sarstedt M. Hopkins L. Kuppelwieser V. G. ( 2014 ). A primer on partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research . European Business Review , 26 ( 2 ), pp. 106 121 . doi: 10.1108/EBR-10-2013-0128 . Open DOISearch in Google Scholar

Harmon, K. M. J. (2003a). Conflicts between owner and contractors: Proposed intervention process. Journal of Management in Engineering, 19(3), pp. 121–125. doi: 10.1061/(ASCE)0742-597X(2003)19:3(121). Harmon K. M. J. ( 2003a ). Conflicts between owner and contractors: Proposed intervention process . Journal of Management in Engineering , 19 ( 3 ), pp. 121 125 . doi: 10.1061/(ASCE)0742-597X(2003)19:3(121) . Open DOISearch in Google Scholar

Harmon, K. M. J. (2003b). Resolution of construction disputes: A review of current methodologies. Leadership & Management in Engineering, 3(4), pp. 187–201. doi: 10.1061/(ASCE)1532-6748(2003)3:4(187). Harmon K. M. J. ( 2003b ). Resolution of construction disputes: A review of current methodologies . Leadership & Management in Engineering , 3 ( 4 ), pp. 187 201 . doi: 10.1061/(ASCE)1532-6748(2003)3:4(187) . Open DOISearch in Google Scholar

Harter, H., Singh, M. M., Schneider-Marin, P., Lang, W., & Geyer, P. (2020). Uncertainty analysis of life cycle energy assessment in early stages of design. Energy and Buildings, 208, p. 109635. doi: 10.1016/j.enbuild.2019.109635. Harter H. Singh M. M. Schneider-Marin P. Lang W. Geyer P. ( 2020 ). Uncertainty analysis of life cycle energy assessment in early stages of design . Energy and Buildings , 208 , p. 109635 . doi: 10.1016/j.enbuild.2019.109635 . Open DOISearch in Google Scholar

Harvett, C. M. (2013). A study of uncertainty and risk management practice relative to perceived project complexity. Doctoral Dissertations, p. 265. Harvett C. M. ( 2013 ). A study of uncertainty and risk management practice relative to perceived project complexity . Doctoral Dissertations , p. 265 . Search in Google Scholar

Holm, M. G. (2000). Service management in housing refurbishment: A theoretical approach. Construction Management and Economics, 18(5), pp. 525–533. doi: 10.1080/014461900407338. Holm M. G. ( 2000 ). Service management in housing refurbishment: A theoretical approach . Construction Management and Economics , 18 ( 5 ), pp. 525 533 . doi: 10.1080/014461900407338 . Open DOISearch in Google Scholar

Juan, Y.-K., Perng, Y.-H., Castro-Lacouture, D., & Lu, K.-S. (2009). Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach. Automation in Construction, 18(2), pp. 139–144. doi: 10.1016/j.autcon.2008.06.001. Juan Y.-K. Perng Y.-H. Castro-Lacouture D. Lu K.-S. ( 2009 ). Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach . Automation in Construction , 18 ( 2 ), pp. 139 144 . doi: 10.1016/j.autcon.2008.06.001 . Open DOISearch in Google Scholar

Kamari, A., Jensen, S. R., Corrao, R., & Kirkegaard, P. H. (2019). A holistic multi-methodology for sustainable renovation. International Journal of Strategic Property Management, 23(1), pp. 50–64. doi: 10.3846/ijspm.2019.6375. Kamari A. Jensen S. R. Corrao R. Kirkegaard P. H. ( 2019 ). A holistic multi-methodology for sustainable renovation . International Journal of Strategic Property Management , 23 ( 1 ), pp. 50 64 . doi: 10.3846/ijspm.2019.6375 . Open DOISearch in Google Scholar

Kang, B, Price, A D F, Thorpe, A., & Edum-Fotwe, F T (2004) Developing a systems approach for managing ethics in construction project environments. ARCOM Conference, Heriot Watt University. Association of Researchers in Construction Management, (2), 367–75. Kang B Price A D F Thorpe A. Edum-Fotwe F T ( 2004 ) Developing a systems approach for managing ethics in construction project environments . ARCOM Conference, Heriot Watt University. Association of Researchers in Construction Management , ( 2 ), 367 75 . Search in Google Scholar

Kerzner, H. H. R. (2013). Project management: A systems approach to planning, scheduling, and controlling. John Wiley & Sons, Inc.Hoboken, New Jersey Published simultaneously in Canada. doi: 10.1016/0377-2217(82)90164-3. Kerzner H. H. R. ( 2013 ). Project management: A systems approach to planning, scheduling, and controlling . John Wiley & Sons, Inc . Hoboken, New Jersey Published simultaneously in Canada . doi: 10.1016/0377-2217(82)90164-3 . Open DOISearch in Google Scholar

Khahro, S. H., & Ali, T. H. (2014). Causes leading to conflicts in construction projects : A viewpoint of Pakistani construction industry. International Conference on challenges in IT, Engineering and Technology (ICCIET’2014) July 17-18, 2014, Phuket (Thailand), pp. 116–121. Khahro S. H. Ali T. H. ( 2014 ). Causes leading to conflicts in construction projects : A viewpoint of Pakistani construction industry . International Conference on challenges in IT, Engineering and Technology (ICCIET’2014) July 17-18, 2014 , Phuket (Thailand) , pp. 116 121 . Search in Google Scholar

Kim, J. J., Miller, J. A., & Kim, S. (2020). Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8), p. 04020094. doi: 10.1061/(asce) co.1943-7862.0001888. Kim J. J. Miller J. A. Kim S. ( 2020 ). Cost impacts of change orders due to unforeseen existing conditions in building renovation projects . Journal of Construction Engineering and Management , 146 ( 8 ), p. 04020094 . doi: 10.1061/(asce)co.1943-7862.0001888 . Open DOISearch in Google Scholar

Korytárová, J., Hanák, T., & Lukele, P. E. (2017). Economic efficiency of brownfield regeneration: Study of South Moravian projects. Scientific Review Engineering and Environmental Sciences, 26(2), pp. 151–158. doi: 10.22630/PNIKS.2017.26.2.13. Korytárová J. Hanák T. Lukele P. E. ( 2017 ). Economic efficiency of brownfield regeneration: Study of South Moravian projects . Scientific Review Engineering and Environmental Sciences , 26 ( 2 ), pp. 151 158 . doi: 10.22630/PNIKS.2017.26.2.13 . Open DOISearch in Google Scholar

Kromidha, E., Spence, L. J., Anastasiadis, S., & Dore, D. (2019). A longitudinal perspective on sustainability and innovation governmentality: The case of the olympic games as a mega-event. Journal of Management Inquiry, 28(1), pp. 77–93. doi: 10.1177/1056492617711585. Kromidha E. Spence L. J. Anastasiadis S. Dore D. ( 2019 ). A longitudinal perspective on sustainability and innovation governmentality: The case of the olympic games as a mega-event . Journal of Management Inquiry , 28 ( 1 ), pp. 77 93 . doi: 10.1177/1056492617711585 . Open DOISearch in Google Scholar

Lee, C. Won, J. W., Jang, W., Jung, W., Han, S. H., & Kwak, Y. H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. International Journal of Project Management, 35(8), pp. 1683–1696. doi: 10.1016/j.ijproman.2017.07.011. Lee C. Won J. W. Jang W. Jung W. Han S. H. Kwak Y. H. ( 2017 ). Social conflict management framework for project viability: Case studies from Korean megaprojects . International Journal of Project Management , 35 ( 8 ), pp. 1683 1696 . doi: 10.1016/j.ijproman.2017.07.011 . Open DOISearch in Google Scholar

Lee, L. A., Jr., & Polkinghorn. B. (2008). Managing conflict in construction megaprojects: Leadership and third-party principles. Conflict Resolution Quarterly, 26(2), pp. 167–198. doi: 10.1002/crq.229. Lee L. A. Jr. Polkinghorn B. ( 2008 ). Managing conflict in construction megaprojects: Leadership and third-party principles . Conflict Resolution Quarterly , 26 ( 2 ), pp. 167 198 . doi: 10.1002/crq.229 . Open DOISearch in Google Scholar

Liu, T. (2014). Conflicting Objectives in Interfaces of Construction Project. Norwegian University of Science and Technology, Trondheim, Norway. Liu T. ( 2014 ). Conflicting Objectives in Interfaces of Construction Project . Norwegian University of Science and Technology , Trondheim, Norway . Search in Google Scholar

Lumineau, F., Eckerd, V., & Handley, S. (2015) Inter-organizational conflicts. Journal of Strategic Contracting and Negotiation, 1(1), pp. 42–64. doi: 10.1177/2055563614568493. Lumineau F. Eckerd V. Handley S. ( 2015 ) Inter-organizational conflicts . Journal of Strategic Contracting and Negotiation , 1 ( 1 ), pp. 42 64 . doi: 10.1177/2055563614568493 . Open DOISearch in Google Scholar

Mahamid, I. (2016). Micro and macro level of dispute causes in residential building projects: Studies of Saudi Arabia. Journal of King Saud University - Engineering Sciences, 28(1), pp. 12–20. doi: 10.1016/J.JKSUES.2014.03.002. Mahamid I. ( 2016 ). Micro and macro level of dispute causes in residential building projects: Studies of Saudi Arabia . Journal of King Saud University - Engineering Sciences , 28 ( 1 ), pp. 12 20 . doi: 10.1016/J.JKSUES.2014.03.002 . Open DOISearch in Google Scholar

Teixeira, J. M. C., Minasowicz, A., Zavadskas, E. K., Ustinovichius, L., Migilinskas, D., Armiñana, E. P., Nowak, P. O., & Grabiec, M. (2006). Training needs in construction project management : A survey of 4 countries of the EU. Journal of Civil Engineering and Management, 12(3), pp. 237–245. https://doi.org/10.3846/13923730.2006.9636398. Teixeira J. M. C. Minasowicz A. Zavadskas E. K. Ustinovichius L. Migilinskas D. Armiñana E. P. Nowak P. O. Grabiec M. ( 2006 ). Training needs in construction project management : A survey of 4 countries of the EU . Journal of Civil Engineering and Management , 12 ( 3 ), pp. 237 245 . https://doi.org/10.3846/13923730.2006.9636398 . Search in Google Scholar

Manuel, J. et al. (2016). Training needs in construction project management: A survey of 4 countries of the EU. Journal of Civil Engineering and Management, 3730(May), pp. 237–245. doi:10.1080/13923730.2006.9636398. Manuel J. ( 2016 ). Training needs in construction project management: A survey of 4 countries of the EU . Journal of Civil Engineering and Management , 3730 ( May ), pp. 237 245 . doi: 10.1080/13923730.2006.9636398 . Open DOISearch in Google Scholar

Mokariantabari, M., Adnan, H., Hussin, M. A. J., Abidin, Z. Z., Baharuddin, H. E. A., & Ismail, W. N. W. (2019). Assessment of complexity factors in briefing stage of refurbishment projects in Malaysia. IOP Conference Series: Earth and Environmental Science, 385(1), p. 012052. doi: 10.1088/1755-1315/385/1/012052. Mokariantabari M. Adnan H. Hussin M. A. J. Abidin Z. Z. Baharuddin H. E. A. Ismail W. N. W. ( 2019 ). Assessment of complexity factors in briefing stage of refurbishment projects in Malaysia . IOP Conference Series: Earth and Environmental Science , 385 ( 1 ), p. 012052 . doi: 10.1088/1755-1315/385/1/012052 . Open DOISearch in Google Scholar

Moura, H., & Teixeira, J. (2010). Managing stakeholders conflicts. Construction Stakeholder Management, pp. 286–316. https://api.semanticscholar.org/CorpusID:167140539 Moura H. Teixeira J. ( 2010 ). Managing stakeholders conflicts . Construction Stakeholder Management , pp. 286 316 . https://api.semanticscholar.org/CorpusID:167140539 Search in Google Scholar

Mustafa, N. K. F. (2007). Building Refurbishment Project in Malaysia. Universiti Teknologi Malaysia,Skudai, Johor, Malaysia. Mustafa N. K. F. ( 2007 ). Building Refurbishment Project in Malaysia . Universiti Teknologi Malaysia , Skudai, Johor, Malaysia . Search in Google Scholar

Narh, O. C., Owusu, E., Oduro-Apeatu, K., & Narh, J T.-W. (2015). An exploratory study of professional conflicts and disputes within the construction industry. International Journal of Managerial Studies and Research, 3(12), pp. 44–65. Narh O. C. Owusu E. Oduro-Apeatu K. Narh J. T.-W. ( 2015 ). An exploratory study of professional conflicts and disputes within the construction industry . International Journal of Managerial Studies and Research , 3 ( 12 ), pp. 44 65 . Search in Google Scholar

Noori, A., & Mokariantabari, M. (2019a). Inter-organizational integration (IOI) in building refurbishment projects; An exploratory factor analysis (EFA) approach. International Journal of Scientific & Engineering Research, 10(11), p. 1361. Noori A. Mokariantabari M. ( 2019a ). Inter-organizational integration (IOI) in building refurbishment projects; An exploratory factor analysis (EFA) approach . International Journal of Scientific & Engineering Research , 10 ( 11 ), p. 1361 . Search in Google Scholar

Noori, A., & Mokariantabari, M. (2019b). Uncertainties in building refurbishment projects; an exploratory factor analysis (EFA) approach. International Journal of Scientific & Engineering Research, 10(11), pp. 1065–1068. Noori A. Mokariantabari M. ( 2019b ). Uncertainties in building refurbishment projects; an exploratory factor analysis (EFA) approach . International Journal of Scientific & Engineering Research , 10 ( 11 ), pp. 1065 1068 . Search in Google Scholar

Noori, A., Nafisi, N., & Mokariantabari, M. (2021). Inter-organizational conflict (IOC) in building refurbishment projects; an exploratory factor analysis (EFA) approach. Journal of Construction Research, 2(1), pp. 29–36. doi: 10.30564/jcr.v2i1.2732. Noori A. Nafisi N. Mokariantabari M. ( 2021 ). Inter-organizational conflict (IOC) in building refurbishment projects; an exploratory factor analysis (EFA) approach . Journal of Construction Research , 2 ( 1 ), pp. 29 36 . doi: 10.30564/jcr.v2i1.2732 . Open DOISearch in Google Scholar

Noori, A., Saruwono, M., Adnan, H., & Rahmat, I. (2016). Conflict, complexity, and uncertainty in building refurbishment projects. In: InCIEC 2015. Springer, Singapore, pp. 251–258. doi: 10.1007/978-981-10-0155-0_24. Noori A. Saruwono M. Adnan H. Rahmat I. ( 2016 ). Conflict, complexity, and uncertainty in building refurbishment projects . In: InCIEC 2015 . Springer , Singapore , pp. 251 258 . doi: 10.1007/978-981-10-0155-0_24 . Open DOISearch in Google Scholar

Ntiyakunze, S. K. (2011). Conflicts in Building Projects in Tanzania : Analysis of Causes and Management Approaches. Royal Institute of Technology (KTH), Stockholm, Sweden. Ntiyakunze S. K. ( 2011 ). Conflicts in Building Projects in Tanzania : Analysis of Causes and Management Approaches . Royal Institute of Technology (KTH) , Stockholm, Sweden . Search in Google Scholar

Nutt, B., McLennan, P., & Walters, R. (1998). Refurbishing Occupied Buildings: The Management of Risk Under the CDM Regulations. Thomas Telford, Leeds, UK. Nutt B. McLennan P. Walters R. ( 1998 ). Refurbishing Occupied Buildings: The Management of Risk Under the CDM Regulations . Thomas Telford , Leeds, UK . Search in Google Scholar

Ofori, G. (2013). Conflict in construction. Construction Management and Economics, 31(5), pp. 497–501. doi: 10.1080/01446193.2013.767465. Ofori G. ( 2013 ). Conflict in construction . Construction Management and Economics , 31 ( 5 ), pp. 497 501 . doi: 10.1080/01446193.2013.767465 . Open DOISearch in Google Scholar

Okeil, A. M., et al. (2013). Enforce ability of limitation of liability clauses in engineering contracts. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, pp. 128–135. 5(3), https://doi.org/10.1061/(ASCE)LA. 1943-4170.0000125. Okeil A. M. , ( 2013 ). Enforce ability of limitation of liability clauses in engineering contracts . Journal of Legal Affairs and Dispute Resolution in Engineering and Construction , pp. 128 135 . 5 ( 3 ), https://doi.org/10.1061/(ASCE)LA. 1943-4170.0000125 . Search in Google Scholar

Osei-Kyei, R., Chan, A. P. C., Yu, Y., Chen, C., & Dansoh, A. (2019). Root causes of conflict and conflict resolution mechanisms in public-private partnerships: Comparative study between Ghana and China. Cities, 87, pp. 185–195. doi: 10.1016/j.cities.2018.10.001. Osei-Kyei R. Chan A. P. C. Yu Y. Chen C. Dansoh A. ( 2019 ). Root causes of conflict and conflict resolution mechanisms in public-private partnerships: Comparative study between Ghana and China . Cities , 87 , pp. 185 195 . doi: 10.1016/j.cities.2018.10.001 . Open DOISearch in Google Scholar

Pallant, J. (2020). SPSS Survival Manual: A step by step guide to data analysis using IBM SPSS (7th ed.). McGraw-Hill, Open University Press, London, UK. https://doi.org/10.4324/9781003117452 Pallant J. ( 2020 ). SPSS Survival Manual: A step by step guide to data analysis using IBM SPSS ( 7th ed.). McGraw-Hill, Open University Press , London, UK . https://doi.org/10.4324/9781003117452 Search in Google Scholar

Rahmat, I. (1997). The Planning and Control Process of Refurbishment Projects. University College London, London, UK. Rahmat I. ( 1997 ). The Planning and Control Process of Refurbishment Projects . University College London , London, UK . Search in Google Scholar

Rahmat, I. (2008). Managing Refurbishment Projects. Pusat Penerbitan Universiti, Universiti Teknologi MARA, Shah Alam, Malaysia. Rahmat I. ( 2008 ). Managing Refurbishment Projects . Pusat Penerbitan Universiti, Universiti Teknologi MARA , Shah Alam, Malaysia . Search in Google Scholar

Ranasinghe, U., Jefferies, M., Davis, P., & Pillay, M. (2021). Conceptualizing project uncertainty in the context of building refurbishment safety: A systematic review. Buildings, 11(3), pp. 1–15. doi: 10.3390/buildings11030089. Ranasinghe U. Jefferies M. Davis P. Pillay M. ( 2021 ). Conceptualizing project uncertainty in the context of building refurbishment safety: A systematic review . Buildings , 11 ( 3 ), pp. 1 15 . doi: 10.3390/buildings11030089 . Open DOISearch in Google Scholar

Sekaran, U. (2019). Research methods for business: A skill building approach. In: McFadden, P. (ed.), John Wiley & Sons, Inc., New York. Sekaran U. ( 2019 ). Research methods for business: A skill building approach . In: McFadden P. (ed.), John Wiley & Sons, Inc ., New York . Search in Google Scholar

Sezer, A. A. (2017). Factors influencing building refurbishment site managers’ waste management efforts. Journal of Facilities Management, 15(4), pp. 318–334. doi: 10.1108/JFM-10-2016-0041. Sezer A. A. ( 2017 ). Factors influencing building refurbishment site managers’ waste management efforts . Journal of Facilities Management , 15 ( 4 ), pp. 318 334 . doi: 10.1108/JFM-10-2016-0041 . Open DOISearch in Google Scholar

Sheth, A. Z., et al. (2010). A framework for refurbishment of health facilities. HaCIRIC International Conference 2010, Edinburgh, UK.https://api.semanticscholar.org/CorpusID:55463651. Sheth A. Z. , ( 2010 ). A framework for refurbishment of health facilities . HaCIRIC International Conference 2010, Edinburgh, UK . https://api.semanticscholar.org/CorpusID:55463651 . Search in Google Scholar

Tonder, C. V., Havenga, W., & Visagie, J. (2008). The causes of conflict in public and private Sector’, Managing Global Transitions, 6(4), pp. 373–401. Tonder C. V. Havenga W. Visagie J. ( 2008 ). The causes of conflict in public and private Sector’ , Managing Global Transitions , 6 ( 4 ), pp. 373 401 . Search in Google Scholar

Tzortzopoulos, P., Kagioglou, M., & Koskela, L. (2020). Lean Construction: Core Concepts and New Frontiers. CRC Press, New York. Available at: https://books.google.com.au/books?id=eTj3DwAAQBAJ. Tzortzopoulos P. Kagioglou M. Koskela L. ( 2020 ). Lean Construction: Core Concepts and New Frontiers . CRC Press , New York . Available at: https://books.google.com.au/books?id=eTj3DwAAQBAJ . Search in Google Scholar

Vaux, J. S., & Kirk, W. M. (2014). Relationship conflict in construction management and how it affects performance and profit. Journal of Construction Engineering and Management, 144(6) pp.6. https://doi.org/10.1002/crq.21286 Vaux J. S. Kirk W. M. ( 2014 ). Relationship conflict in construction management and how it affects performance and profit . Journal of Construction Engineering and Management , 144 ( 6 ) pp. 6 . https://doi.org/10.1002/crq.21286 Search in Google Scholar

Vaysburd, A. M., Bissonnette, B., & von Fay. K. F. (2014). Compatibility Issues in Design and Implementation of Concrete Repairs and Overlays. Denver, Colorado. Vaysburd A. M. Bissonnette B. von Fay K. F. ( 2014 ). Compatibility Issues in Design and Implementation of Concrete Repairs and Overlays . Denver, Colorado . Search in Google Scholar

Volk, R., Stengel, J., & Schultmann, F. (2014). Building information modeling (BIM) for existing buildings – Literature review and future needs. Automation in Construction, 38, pp. 109–127. doi: 10.1016/j.autcon.2013.10.023. Volk R. Stengel J. Schultmann F. ( 2014 ). Building information modeling (BIM) for existing buildings – Literature review and future needs . Automation in Construction , 38 , pp. 109 127 . doi: 10.1016/j.autcon.2013.10.023 . Open DOISearch in Google Scholar

Waldron, D. B. (2006) A Survey of Pressure Points in Australian Construction and Infrastructure Projects. Blake Dawson Waldron. North Sydney, Australia. Waldron D. B. ( 2006 ) A Survey of Pressure Points in Australian Construction and Infrastructure Projects . Blake Dawson Waldron . North Sydney, Australia . Search in Google Scholar

Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017). Investigating the relationship between communication-conflict interaction and project success among construction project teams. International Journal of Project Management, 35(8), pp. 1466–1482. doi: 10.1016/j.ijproman.2017.08.006. Wu G. Liu C. Zhao X. Zuo J. ( 2017 ). Investigating the relationship between communication-conflict interaction and project success among construction project teams . International Journal of Project Management , 35 ( 8 ), pp. 1466 1482 . doi: 10.1016/j.ijproman.2017.08.006 . Open DOISearch in Google Scholar

Xu, C. (2011). Uncertainty and construction projects: A new institutional economics perspective. 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, pp. 286–290. doi:10.1109/ICIEEM.2011.6035159. Xu C. ( 2011 ). Uncertainty and construction projects: A new institutional economics perspective . 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management , pp. 286 290 . doi: 10.1109/ICIEEM.2011.6035159 . Open DOISearch in Google Scholar

Yang, Z. Nguyen, V. T., & Le, P. B. (2018). Knowledge sharing serves as a mediator between collaborative culture and innovation capability: An empirical research. Journal of Business and Industrial Marketing, 33(7), pp. 958–969. doi: 10.1108/JBIM-10-2017-0245. Yang Z. Nguyen V. T. Le P. B. ( 2018 ). Knowledge sharing serves as a mediator between collaborative culture and innovation capability: An empirical research . Journal of Business and Industrial Marketing , 33 ( 7 ), pp. 958 969 . doi: 10.1108/JBIM-10-2017-0245 . Open DOISearch in Google Scholar

Yap, J. B. H., Abdul-Rahman, H., & Chen, W. (2017). Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication. International Journal of Project Management, 35(7), pp. 1253–1271. doi: 10.1016/J.IJPROMAN.2017.04.010. Yap J. B. H. Abdul-Rahman H. Chen W. ( 2017 ). Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication . International Journal of Project Management , 35 ( 7 ), pp. 1253 1271 . doi: 10.1016/J.IJPROMAN.2017.04.010 . Open DOISearch in Google Scholar

Yee, P., Fischer, M., & Haymaker, J. (2013) Automated identification of occupant interactions in renovations of occupied buildings. Journal of Information Technology in Construction, 18, pp. 182–213. Yee P. Fischer M. Haymaker J. ( 2013 ) Automated identification of occupant interactions in renovations of occupied buildings . Journal of Information Technology in Construction , 18 , pp. 182 213 . Search in Google Scholar

You, J. Chen, Y., Wang, W., & Shi, C. (2018). Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts. International Journal of Project Management, 36(5), pp. 795–807. doi: 10.1016/j. ijproman.2018.03.002. You J. Chen Y. Wang W. Shi C. ( 2018 ). Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts . International Journal of Project Management , 36 ( 5 ), pp. 795 807 . doi: 10.1016/j.ijproman.2018.03.002 . Open DOISearch in Google Scholar

Zainudin, H. A. (2010). Research Methodology for Business & Social Scince. 1st edn. UiTM Publication Centre (UPENA), Shah Alam, Malaysia. Zainudin H. A. ( 2010 ). Research Methodology for Business & Social Scince . 1st edn. UiTM Publication Centre (UPENA) , Shah Alam, Malaysia . Search in Google Scholar

Zolkafli, U., Zakaria, N., Yahya, Z., Ali, A. S., Akashah, F. W., & Othman, M. (2012). Risks in conservation projects. Journal of Design + Built, 5, pp. 1–11. Zolkafli U. Zakaria N. Yahya Z. Ali A. S. Akashah F. W. Othman M. ( 2012 ). Risks in conservation projects . Journal of Design + Built , 5 , pp. 1 11 . Search in Google Scholar

eISSN:
1847-6228
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Engineering, Introductions and Overviews, other