Cite

Al-Agele, H. K. B., & Al-Kaabi, S. A. M. (2016). Identification of key factors affecting waste management in life cycle of the construction project by using Delphi technique. Journal of Engineering, 22 (7), pp. 19–34, Available at https://joe.uobaghdad.edu.iq/index.php/main/article/view/187 [accessed 23 November, 2021]. Al-Agele H. K. B. Al-Kaabi S. A. M. ( 2016 ). Identification of key factors affecting waste management in life cycle of the construction project by using Delphi technique . Journal of Engineering , 22 ( 7 ), pp. 19 34 , Available at https://joe.uobaghdad.edu.iq/index.php/main/article/view/187 [Accessed 23 November, 2021 ]. Search in Google Scholar

Al-farra, W. A. K. (2009). Analysis of Questionnaire Data by Using the Statistical Program SPSS. World Assembly of Muslim Youth, (Retrieved at: November, 2019). Al-farra W. A. K. ( 2009 ). Analysis of Questionnaire Data by Using the Statistical Program SPSS . World Assembly of Muslim Youth , (Retrieved at: November, 2019). Search in Google Scholar

Alkaabi, S. A. M., & Mahjoob, A. M. R. (2022). Identifying the selection criteria of design consultant for Iraqi construction projects. Journal of the Mechanical Behavior of Materials, 31, pp. 290–297. doi: 10.1515/jmbm-2022-0036. Alkaabi S. A. M. Mahjoob A. M. R. ( 2022 ). Identifying the selection criteria of design consultant for Iraqi construction projects . Journal of the Mechanical Behavior of Materials , 31 , pp. 290 297 . doi: 10.1515/jmbm-2022-0036 . Open DOISearch in Google Scholar

Alkaabi, S. A. M., & Mahjoob, A. M. R. (2023). Identification of key criteria of selecting the delivery system and type of contract in construction projects. In: Yang, X. S., Alkaabi, S. A. M., & Mahjoob, A. M. R. (eds.), Proceedings of Seventh International Congress on Information and Communication Technology, Lecture Notes in Networks and Systems 464. doi: 10.1007/978-981-19-2394-4_14. Alkaabi S. A. M. Mahjoob A. M. R. ( 2023 ). Identification of key criteria of selecting the delivery system and type of contract in construction projects . In: Yang X. S. Alkaabi S. A. M. Mahjoob A. M. R. (eds.), Proceedings of Seventh International Congress on Information and Communication Technology, Lecture Notes in Networks and Systems 464 . doi: 10.1007/978-981-19-2394-4_14 . Open DOISearch in Google Scholar

Ataei, Y., Mahmoudi, A., Feylizadeh, M. R., & Li, D. (2020). Ordinal priority approach (OPA) in multiple attribute decision-making. Applied Soft Computing Journal, 86, p. 105893. Ataei Y. Mahmoudi A. Feylizadeh M. R. Li D. ( 2020 ). Ordinal priority approach (OPA) in multiple attribute decision-making . AppliedSoft Computing Journal , 86 , p. 105893 . Search in Google Scholar

Brauers, W. K. M., Zavadskas, E. K., Zenonas Turskis, Z., & Vilutiene, T. (2008). Multi-objective contractor’s ranking by applying the MOORA method. Journal of Business Economics and Management, 9 (4), pp. 245–255. doi: 10.3846/1611-1699.2008.9.245-255. Brauers W. K. M. Zavadskas E. K. Zenonas Turskis Z. Vilutiene T. ( 2008 ). Multi-objective contractor’s ranking by applying the MOORA method . Journal of Business Economics and Management , 9 ( 4 ), pp. 245 255 . doi: 10.3846/16111699.2008.9.245-255 . Open DOISearch in Google Scholar

Cheng, E. W. L., & Li, H. (2004). Contractor selection using the analytic network process. Construction Management and Economics, 22 (10), pp. 1021–1032. doi: 10.1080/0144619042000202852. Cheng E. W. L. Li H. ( 2004 ). Contractor selection using the analytic network process . Construction Management and Economics , 22 ( 10 ), pp. 1021 1032 . doi: 10.1080/0144619042000202852 . Open DOISearch in Google Scholar

CITB. (2015). Industry Guidance for Contractors. The Construction (Design and Management) Regulations. https://www.citb.co.uk/about-citb/partnerships-and-initiatives/construction-design-and-management-regulations-2015/cdm-regulations/ CITB . ( 2015 ). Industry Guidance for Contractors . The Construction (Design and Management) Regulations . https://www.citb.co.uk/about-citb/partnerships-and-initiatives/construction-design-and-management-regulations-2015/cdm-regulations/ Search in Google Scholar

Crane, D., Henderson, E. J., & Chadwick, D. R. (2017). Exploring the acceptability of a ‘limited patient consent procedure’ for a proposed blood-borne virus screening programme: A Delphi consensus building technique. BMJ Open, 7, p. e015373. doi: 10.1136/bmjopen-2016-015373. Crane D. Henderson E. J. Chadwick D. R. ( 2017 ). Exploring the acceptability of a ‘limited patient consent procedure’ for a proposed blood-borne virus screening programme: A Delphi consensus building technique . BMJ Open , 7 , p. e015373 . doi: 10.1136/bmjopen-2016-015373 . Open DOISearch in Google Scholar

Elazouni, A. M. (2006). Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132 (12), pp. 1242–1253. doi: 10.1061/(ASCE)07339364(2006)132:12(1242). Elazouni A. M. ( 2006 ). Classifying construction contractors using unsupervised-learning neural networks . Journal of Construction Engineering and Management , 132 ( 12 ), pp. 1242 1253 . doi: 10.1061/(ASCE)07339364(2006)132:12(1242) . Open DOISearch in Google Scholar

El-Sayeg, S. M. (2009). Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27 (4), pp. 385–398. doi: 10.1080/01446190902759009. El-Sayeg S. M. ( 2009 ). Multi-criteria decision support model for selecting the appropriate construction management at risk firm . Construction Management and Economics , 27 ( 4 ), pp. 385 398 . doi: 10.1080/01446190902759009 . Open DOISearch in Google Scholar

Fong, S. P., & Choi, S. K. (2000). Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18, pp. 547–557. Fong S. P. Choi S. K. ( 2000 ). Final contractor selection using the analytical hierarchy process . Construction Management and Economics , 18 , pp. 547 557 . Search in Google Scholar

Ginevičius, R., & Vaitkūnaitė, V. (2006). Analysis of organizational culture dimensions impacting performance. Journal of Business Economics and Management, 7 (4), pp. 201–211. Ginevičius R. Vaitkūnaitė V. ( 2006 ). Analysis of organizational culture dimensions impacting performance . Journal of Business Economics and Management , 7 ( 4 ), pp. 201 211 . Search in Google Scholar

Grisham, T. (2009). The Delphi technique: A method for testing complex and multifaceted topics. International Journal for Managing Projects in Business, 2, pp. 112–130. Grisham T. ( 2009 ). The Delphi technique: A method for testing complex and multifaceted topics . International Journal for Managing Proiects in Business , 2 , pp. 112 130 . Search in Google Scholar

Hasson, F., & Keeney, S. (2011). Enhancing rigour in the Delphi technique research. Technological Forecasting & Social Change, 78, pp. 1695–1704. doi: 10.1007/s12652-020-02395-z. Hasson F. Keeney S. ( 2011 ). Enhancing rigour in the Delphi technique research . Technological Forecasting & Social Change , 78 , pp. 1695 1704 . doi: 10.1007/s12652-020-02395-z . Open DOISearch in Google Scholar

Jahan, A., & Edwards, K. L. (2013). VIKOR method for material selection problems with interval numbers and target-based criteria. Materials & Design, 47, p. 759765. Jahan A. Edwards K. L. ( 2013 ). VIKOR method for material selection problems with interval numbers and target-based criteria . Materials & Design , 47 , p. 759765 . Search in Google Scholar

Javed, S. A., Mahmoudi, A., & Liu, S. (2020). Grey absolute decision analysis (GADA) method for multiple criteria group decision making under uncertainty. International Journal of Fuzzy System, 22, pp. 1073–1090. Javed S. A. Mahmoudi A. Liu S. ( 2020 ). Grey absolute decision analysis (GADA) method for multiple criteria group decision making under uncertainty . International Journal of Fuzzy System , 22 , pp. 1073 1090 . Search in Google Scholar

Jeleva, A., Pacalo, V., & Dodu-Gugea, L. (2017). The features of decision-making process in international companies. Are companies in control of their own decisions? CSEI Working Paper Series, Issue 5. Jeleva A. Pacalo V. Dodu-Gugea L. ( 2017 ). The features of decision-making process in international companies. Are companies in control of their own decisions? CSEI Working Paper Series, Issue 5 . Search in Google Scholar

Kaiser, H. F. (1974). An index of factorial simplicity. Psychometrika, 39(1), pp. 31–36. Kaiser H. F. ( 1974 ). An index of factorial simplicity . Psychometrika , 39 ( 1 ), pp. 31 36 . Search in Google Scholar

Kashiwagi, D., & Byfield, R. (2002). Selecting the best contractor to get performance: On time, on budget, meeting quality expectations. Journal of Facilities Management, 1. doi: 10.1108/14725960310807872. Kashiwagi D. Byfield R. ( 2002 ). Selecting the best contractor to get performance: On time, on budget, meeting quality expectations . Journal of Facilities Management , 1 . doi: 10.1108/14725960310807872 . Open DOISearch in Google Scholar

Lam, K. C., Hu, T. S., & Ng, S. T. (2005). Using the principal component analysis method as a tool in contractor prequalification. Construction Management and Economics, 23 (7), pp. 673–684. doi: 10.1080/01446190500041263. Lam K. C. Hu T. S. Ng S. T. ( 2005 ). Using the principal component analysis method as a tool in contractor prequalification . Construction Management and Economics , 23 ( 7 ), pp. 673 684 . doi: 10.1080/01446190500041263 . Open DOISearch in Google Scholar

Lam, K. C., Hu, T. S., Ng, S. T., Skitmore, M., & Cheung, S. O. (2010). A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19 (2), pp. 175–188. doi: 10.1080/01446190150505108. Lam K. C. Hu T. S. Ng S. T. Skitmore M. Cheung S. O. ( 2010 ). A fuzzy neural network approach for contractor prequalification . Construction Management and Economics , 19 ( 2 ), pp. 175 188 . doi: 10.1080/01446190150505108 . Open DOISearch in Google Scholar

Lever, J., Krzywinski, M., & Altman, N. (2017). Points of significance: Principal component analysis. Nature Methods, 14 (7), pp. 641–642. Lever J. Krzywinski M. Altman N. ( 2017 ). Points of significance: Principal component analysis . Nature Methods , 14 ( 7 ), pp. 641 642 . Search in Google Scholar

Mahmoudi, A., Deng, X., Javed, S. A., & Yuan, J. (2020). Large-scale multiple criteria decision-making with missing values: Project selection through TOPSIS.OPA. Journal of Ambient Intelligence and Humanized Computing. doi: 10.1007/s12652-020-02649-w. Mahmoudi A. Deng X. Javed S. A. Yuan J. ( 2020 ). Large-scale multiple criteria decision-making with missing values: Project selection through TOPSIS.OPA . Journal of Ambient Intelligence and Humanized Computing . doi: 10.1007/s12652-020-02649-w . Open DOISearch in Google Scholar

Mahmoudi, A., & Javed, S. A. (2021). Performance evaluation of construction sub-contractors using ordinal priority approach. Evaluation and Program Planning. doi: 10.1016/j. evalprogplan.2021.102022. Mahmoudi A. Javed S. A. ( 2021 ). Performance evaluation of construction sub-contractors using ordinal priority approach . Evaluation and Program Planning . doi: 10.1016/j. evalprogplan.2021.102022 . Open DOISearch in Google Scholar

Mahmoudi, A., Javed, S. A., & Mardani, A. (2021a). Gresilient supplier selection through fuzzy ordinal priority approach: Decision-making in post-COVID era. Operations Management Research. doi: 10.1007/s12063-021-00178-z. Mahmoudi A. Javed S. A. Mardani A. ( 2021a ). Gresilient supplier selection through fuzzy ordinal priority approach: Decision-making in post-COVID era . Operations Management Research . doi: 10.1007/s12063-021-00178-z . Open DOISearch in Google Scholar

Mahmoudi, A., Deng, X., Javed, S. A., & Zhang, N. (2021b). Sustainable supplier selection in megaprojects: Grey ordinal priority approach. Business Strategy and the Environment, 30(1), pp. 318–339. Mahmoudi A. Deng X. Javed S. A. Zhang N. ( 2021b ). Sustainable supplier selection in megaprojects: Grey ordinal priority approach . Business Strategy and the Environment , 30 ( 1 ), pp. 318 339 . Search in Google Scholar

Malone, D. C., Abarca, J., Hansten, P. D., Grizzle, A. J., Armstrong, E. P., & Van Bergen, R. C, et al. (2005). Identification of serious drug-drug interactions: Results of the partnership to prevent drug-drug interactions. The American Journal of Geriatric Pharmacotherapy, 3(2), pp. 65–76. Malone D. C. Abarca J. Hansten P. D. Grizzle A. J. Armstrong E. P. Van Bergen R. C. , ( 2005 ). Identification of serious drug-drug interactions: Results of the partnership to prevent drug-drug interactions . The American Journal of Geriatric Pharmacotherapy , 3 ( 2 ), pp. 65 76 . Search in Google Scholar

Mitkus, S., & Trinkūnienė, E. (2008). Reasoned decisions in construction contracts evaluation. Technological and Economic Development of Economy, 14(3), pp. 402–416. Mitkus S. Trinkūnienė E. ( 2008 ). Reasoned decisions in construction contracts evaluation . Technological and Economic Development of Economy , 14 ( 3 ), pp. 402 416 . Search in Google Scholar

Mohammed, S. R., & Jasim, A. J. (2018). Examining the values and principles of agile construction management in Iraqi construction projects. Journal of Engineering, 24(7), pp. 114–133. doi: 10.31026/j.eng.2018.07.08. Mohammed S. R. Jasim A. J. ( 2018 ). Examining the values and principles of agile construction management in Iraqi construction projects . Journal of Engineering , 24 ( 7 ), pp. 114 133 . doi: 10.31026/j.eng.2018.07.08 . Open DOISearch in Google Scholar

Mohamed, S. R., & Majeed, R. A. (2016). Pre-qualification of contractors in Iraq. Applied Research Journal, 2 (2), pp. 77–87. Mohamed S. R. Majeed R. A. ( 2016 ). Pre-qualification of contractors in Iraq . Applied Research Journal , 2 ( 2 ), pp. 77 87 . Search in Google Scholar

Naghizadeh Vardin, A., Ansari, R., Khalilzadeh, M., Antucheviciene, J., & Bausys, R. (2021). An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects. Sustainability, 13, p. 6933. doi: 10.3390/su13126933. Naghizadeh Vardin A. Ansari R. Khalilzadeh M. Antucheviciene J. Bausys R. ( 2021 ). An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects . Sustainability , 13 , p. 6933 . doi: 10.3390/su13126933 . Open DOISearch in Google Scholar

Ogbeifun, E., Agwa-Ejon, J., Mbohwa, C., & Pretorius, J. H. C. (2016). The Delphi technique: A credible research methodology. In: Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, March 8-10. Ogbeifun E. Agwa-Ejon J. Mbohwa C. Pretorius J. H. C. ( 2016 ). The Delphi technique: A credible research methodology . In: Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management Kuala Lumpur , Malaysia , March 8-10 . Search in Google Scholar

Othoman, E., Gupta, N., Zhang, B., & Wamuziri, S. (2013). Contractor selection using an integrated AHP and TOPSIS Model. International Journal of Civil and Environmental Engineering, 3 (1), pp. 1116–1126. Othoman E. Gupta N. Zhang B. Wamuziri S. ( 2013 ). Contractor selection using an integrated AHP and TOPSIS Model . International Journal of Civil and Environmental Engineering , 3 ( 1 ), pp. 1116 1126 . Search in Google Scholar

Plebankiewicz, E. (2014). Modelling decision-making processes in bidding procedures with the use of the fuzzy sets theory. International Journal of Strategic Property Management, 18(3), pp. 307–316. doi: 10.3846/1648715X.2014.943332. Plebankiewicz E. ( 2014 ). Modelling decision-making processes in bidding procedures with the use of the fuzzy sets theory . International Journal of Strategic Property Management , 18 ( 3 ), pp. 307 316 . doi: 10.3846/1648715X.2014.943332 . Open DOISearch in Google Scholar

Preetha, R., & Vinila, J. S. (2020). Early diagnose breast cancer with PCA-LDA based FER and neuro-fuzzy classification system. Journal of Ambient Intelligence and Humanized Computing, 12, pp. 7195–7204. doi: 10.1007/s12652-020-02395-z. Preetha R. Vinila J. S. ( 2020 ). Early diagnose breast cancer with PCA-LDA based FER and neuro-fuzzy classification system . Journal of Ambient Intelligence and Humanized Computing , 12 , pp. 7195 7204 . doi: 10.1007/s12652-020-02395-z . Open DOISearch in Google Scholar

Quartey-Papafio, T. K., Shajedul, I., & Dehaghani, A. R. (2021). Evaluating suppliers for healthcare centre using ordinal priority approach. Management Science and Business Decisions, 1 (1), pp. 5–11. doi: 10.52812/msbd.12. Quartey-Papafio T. K. Shajedul I. Dehaghani A. R. ( 2021 ). Evaluating suppliers for healthcare centre using ordinal priority approach . Management Science and Business Decisions , 1 ( 1 ), pp. 5 11 . doi: 10.52812/msbd.12 . Open DOISearch in Google Scholar

Ralitsa, B., Tolson, H., & Cole, B. R. (2005). Stability of response characteristics of a Delphi panel: Application of bootstrap data expansion. BMC Medical Research Methodology, 5(37). doi: 10.1186/1471-2288-5-37. Ralitsa B. Tolson H. Cole B. R. ( 2005 ). Stability of response characteristics of a Delphi panel: Application of bootstrap data expansion . BMC Medical Research Methodology , 5 ( 37 ). doi: 10.1186/1471-2288-5-37 . Open DOISearch in Google Scholar

Razi, P. Z., Ramli, N. I., Ali, M. I., & Ramadhansyah, P. J. (2019). Selection of contractor by using analytical hierarchy process (AHP). IOP Conference Series: Materials Science and Engineering, 712(2020), p. 012014. IOP Publishing. doi: 10.1088/1757-899X/712/1/012014, (NCWE & ISSCE). Razi P. Z. Ramli N. I. Ali M. I. Ramadhansyah P. J. ( 2019 ). Selection of contractor by using analytical hierarchy process (AHP) . IOP Conference Series: Materials Science and Engineering , 712 ( 2020 ), p. 012014 . IOP Publishing . doi: 10.1088/1757-899X/712/1/012014, (NCWE & ISSCE) . Open DOISearch in Google Scholar

Ringnér, M. (2008). What is principal component analysis. Nature Biotechnology, 26 (3), pp. 303–304. Ringnér M. ( 2008 ). What is principal component analysis . Nature Biotechnology , 26 ( 3 ), pp. 303 304 . Search in Google Scholar

Sadeghi, M., Mahmoudi, A., & Deng, X. (2021). Adopting distributed ledger technology for the sustainable construction industry: Evaluating the barriers using ordinal priority approach. Environmental Science and Pollution Research. doi: 10.1007/s11356-021-16376-y. Sadeghi M. Mahmoudi A. Deng X. ( 2021 ). Adopting distributed ledger technology for the sustainable construction industry: Evaluating the barriers using ordinal priority approach . Environmental Science and Pollution Research . doi: 10.1007/s11356-021-16376-y . Open DOISearch in Google Scholar

Shajedul, I. (2021). Evaluation of low-carbon sustainable technologies in agriculture sector through grey ordinal priority approach. International Journal of Grey Systems, 1(1), pp. 5–26. doi: 10.52812/ijgs.3. Shajedul I. ( 2021 ). Evaluation of low-carbon sustainable technologies in agriculture sector through grey ordinal priority approach . International Journal of Grey Systems , 1 ( 1 ), pp. 5 26 . doi: 10.52812/ijgs.3 . Open DOISearch in Google Scholar

Sönmez, M., Yang, J. B., & Holt, G. D. (2001). Addressing the contractor selection problem using an evidential reasoning approach. Engineering. Construction and Architectural Management, 8 (3), pp. 198–210. Sönmez M. Yang J. B. Holt G. D. ( 2001 ). Addressing the contractor selection problem using an evidential reasoning approach . Engineering. Construction and Architectural Management , 8 ( 3 ), pp. 198 210 . Search in Google Scholar

Wainwright, P., Gallagher, A., Tompsett, H., & Atkins, C. (2010). The use of vignettes within a Delphi exercise: A useful approach in empirical ethics? Journal of Medical Ethics, 36, pp. 656–660. Wainwright P. Gallagher A. Tompsett H. Atkins C. ( 2010 ). The use of vignettes within a Delphi exercise: A useful approach in empirical ethics? Journal of Medical Ethics , 36 , pp. 656 660 . Search in Google Scholar

Welding, A. K. (2013). Project evaluation: Lessons learned vs. Delphi method. Thesis of 6 ECTS credits submitted to the School of Science and Engineering at Reykjavík University in partial fulfillment of the requirements for the degree of Master of Project Management in MPM. Welding A. K. ( 2013 ). Project evaluation: Lessons learned vs. Delphi method . Thesis of 6 ECTS credits submitted to the School of Science and Engineering at Reykjavík University in partial fulfillment of the requirements for the degree of Master of Project Management in MPM . Search in Google Scholar

Yongtao, T. (2008). Contractor’s competitiveness and competitive strategy in Hong Kong. The Hong Kong Polytechnic University Department of Building and Real Estate. Yongtao T. ( 2008 ). Contractor’s competitiveness and competitive strategy in Hong Kong . The Hong Kong Polytechnic University Department of Building and Real Estate . Search in Google Scholar

Zagorskas, J., & Turskis, Z. (2006). Multi-attribute model for estimation of retail centres influence on the city structure. Kaunas city case study. Technological and Economic Development of Economy, 12(4), pp. 347–352. Zagorskas J. Turskis Z. ( 2006 ). Multi-attribute model for estimation of retail centres influence on the city structure. Kaunas city case study . Technological and Economic Development of Economy , 12 ( 4 ), pp. 347 352 . Search in Google Scholar

Zavadskas, E. K., & Kaklauskas, A. (1996). Determination of an efficient contractor by using the new method of multicriteria assessment. In: Langford, D. A., & Retik, A., CIB W 65, (eds.), International Symposium for the Organisation and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. London, Weinheim, New York, Tokyo, Melbourne, Madras. E and FN SPON 2, London, pp. 94–104. Zavadskas E. K. Kaklauskas A. ( 1996 ). Determination of an efficient contractor by using the new method of multicriteria assessment . In: Langford D. A. Retik A. CIB W 65 , (eds.), International Symposium for the Organisation and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk . London, Weinheim, New York, Tokyo, Melbourne, Madras. E and FN SPON 2, London , pp. 94 104 . Search in Google Scholar

Zavadskas, E. K., Kaklauskas, A., Turskis, Z., & Tamošaitienÿe, J. (2009). Multi-attribute decision-making model by applying grey numbers. Informatica, 20 (2), pp. 305–320. Zavadskas E. K. Kaklauskas A. Turskis Z. Tamošaitienÿe J. ( 2009 ). Multi-attribute decision-making model by applying grey numbers . Informatica , 20 ( 2 ), pp. 305 320 . Search in Google Scholar

Zavadskas, E. K., & Vilutiene, T. (2006). A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria. Building and Environment, 41(5), pp. 621–632. Zavadskas E. K. Vilutiene T. ( 2006 ). A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria . Building and Environment , 41 ( 5 ), pp. 621 632 . Search in Google Scholar

Zavadskas, E. K., Vilutiene, T., Turskis, Z., & Tamosaitiene, J. (2010). Contractor selection for construction works by applying SAW-G and TOPSIS Grey techniques. Journal of Business Economics and Management, 11 (1), pp. 34–55. Zavadskas E. K. Vilutiene T. Turskis Z. Tamosaitiene J. ( 2010 ). Contractor selection for construction works by applying SAW-G and TOPSIS Grey techniques . Journal of Business Economics and Management , 11 ( 1 ), pp. 34 55 . Search in Google Scholar

eISSN:
1847-6228
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Engineering, Introductions and Overviews, other