This work is licensed under the Creative Commons Attribution 4.0 International License.
AbouRizk, S. M., Knowles, P., & Hermann, U. A. (2001). Estimating labor production rates for industrial construction activities. Journal of Construction Engineering and Management, 127(6), pp. 502–511.AbouRizkS. M.KnowlesP. & HermannU. A.(2001).Estimating labor production rates for industrial construction activities.,127(6), pp.502–511.Search in Google Scholar
Bai, S., Li, M., Kong, R., Han, S., Li, H., & Qin, L. (2019). Data mining approach to construction productivity prediction for cutter suction dredgers. Automation in Construction, 105, p. 102833.BaiS.LiM.KongR.HanS.LiH. & QinL.(2019).Data mining approach to construction productivity prediction for cutter suction dredgers.,105, p.102833.Search in Google Scholar
Bauer, H. (2007). Baubetrieb, 3rd edn. Springer, Germany.BauerH.(2007).,3rd edn.Springer,Germany.Search in Google Scholar
BML. (1983). Handbuch BML: Daten fur die Berechnung von Baumaschinen-Leistungen. Zeittechnik Verlag, Germany.BML. (1983)..Zeittechnik Verlag,Germany.Search in Google Scholar
Carmichael, D. G., Bartlett, B. J., & Kaboli, A. S. (2014). Surface mining operations: Coincident unit cost and emissions. International Journal of Mining, Reclamation and Environment, 28(1), pp. 47–65.CarmichaelD. G.BartlettB. J. & KaboliA. S.(2014).Surface mining operations: Coincident unit cost and emissions.,28(1), pp.47–65.Search in Google Scholar
Carmichael, D. G., & Mustaffa, N. K. (2018). Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(2), https://doi.org/10.1108/CI-05-2017-0047.CarmichaelD. G. & MustaffaN. K.(2018).Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies.,18(2), https://doi.org/10.1108/CI-05-2017-0047.Open DOISearch in Google Scholar
Caterpillar. (2016). Caterpillar Performance Handbook, 46th edn. Caterpillar Inc., USA.Caterpillar. (2016).,46th edn.Caterpillar Inc.,USA.Search in Google Scholar
CECE. (1973). Section VI: Hydraulic excavators, Committee for European Construction Equipment, Internal Report, Brussels.CECE. (1973).,Committee for European Construction Equipment, Internal Report,Brussels.Search in Google Scholar
Chaudari, R. S., Sarode, G. C., Bhangale, P. P., & Mali, S. T. (2022). Analysis of factors affecting construction labour productivity for Pune city. YMER, 21(11), pp. 2020–2028.ChaudariR. S.SarodeG. C.BhangaleP. P. & MaliS. T.(2022).Analysis of factors affecting construction labour productivity for Pune city.,21(11), pp.2020–2028.Search in Google Scholar
Chen, C., Zhu, Z., Hammad, A., & Akbarzadeh, M. (2021). Automatic identification of idling reasons in excavation operations based on excavator – Truck relationships. Journal of Computing in Civil Engineering, 35(5), p. 04021015.ChenC.ZhuZ.HammadA. & AkbarzadehM.(2021).Automatic identification of idling reasons in excavation operations based on excavator – Truck relationships.,35(5), p.04021015.Search in Google Scholar
Cottrell, D. S. (2006). Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189–196.CottrellD. S.(2006).Contractor process improvement for enhancing construction productivity.,132(2), pp.189–196.Search in Google Scholar
DIN 18300. (2012). German Construction Contract Procedures (VOB) – Part C: General Technical Specifications in Construction Contracts (ATV) – Earthworks. Beuth Verlag, Germany.DIN 18300. (2012)..Beuth Verlag,Germany.Search in Google Scholar
Edwards, D. J., & Holt, G. D. (2000). ESTIVATE: A model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(1), pp. 52–62.EdwardsD. J. & HoltG. D.(2000).ESTIVATE: A model for calculating excavator productivity and output costs.,7(1), pp.52–62.Search in Google Scholar
Garbotz, G. (1966). Die Leistungen von Baumaschinen, Koln-Braunsfeld Muller.GarbotzG.(1966)..Search in Google Scholar
Girmscheidt, G. (2010). Leistungsermittlungshandbuch fur Baumaschinen und Bauprozesse, 4th edn. Springer, Germany.GirmscheidtG.(2010).,4th edn.Springer,Germany.Search in Google Scholar
Hoffmann, M. (2006). Zahlentafeln fur den Baubetrieb, 7th edn. Teubner, Germany.HoffmannM.(2006).,7th edn.Teubner,Germany.Search in Google Scholar
Hüster, F. (2005). Leistungsberechnung der Baumaschinen. Shaker Verlag, Germany.HüsterF.(2005)..Shaker Verlag,Germany.Search in Google Scholar
Kassem, M., Mahamedi, E., Rogage, K., Duffy, K., & Huntingdon, J. (2021). Measuring and benchmarking the productivity of excavators in infrastructure projects: A deep neural network approach. Automation in Construction, 124, p. 103532.KassemM.MahamediE.RogageK.DuffyK. & HuntingdonJ.(2021).Measuring and benchmarking the productivity of excavators in infrastructure projects: A deep neural network approach.,124, p.103532.Search in Google Scholar
Komatsu. (2013). Specifications and Application Handbook, 31st edn. Komatsu, Japan.Komatsu. (2013).,31st edn.Komatsu,Japan.Search in Google Scholar
Kotte, G. (1997). Ermittlung der Nutzforderleistung von Hydraulikbaggern, TIS Tiefbau Ingenieurbau Strassenbau, Bertelsmann Fachzeitschriften.KotteG.(1997).,TIS Tiefbau Ingenieurbau Strassenbau, Bertelsmann Fachzeitschriften.Search in Google Scholar
Kühn, G. (1984). Der maschinelle Erdbau. Teubner Verlag, Germany.KühnG.(1984)..Teubner Verlag,Germany.Search in Google Scholar
Liebherr. (2003). Technical Handbook – Earthmoving. Liebherr, Germany.Liebherr. (2003)..Liebherr,Germany.Search in Google Scholar
Naskoudakis, I., & Petroutsatou, K. (2016). A thematic review of main researches on construction equipment over the recent years. Procedia Engineering, 164, pp. 206–213.NaskoudakisI. & PetroutsatouK.(2016).A thematic review of main researches on construction equipment over the recent years.,164, pp.206–213.Search in Google Scholar
Ng, F., Harding, J. A., & Glass, J. (2016). An eco-approach to optimise efficiency and productivity of a hydraulic excavator. Journal of Cleaner Production, 112, pp. 3966–3976.NgF.HardingJ. A. & GlassJ.(2016).An eco-approach to optimise efficiency and productivity of a hydraulic excavator.,112, pp.3966–3976.Search in Google Scholar
Nunnally, S. (2007). Construction Methods and Management, 7th edn. Prentice Hall, USA.NunnallyS.(2007).,7th edn.Prentice Hall,USA.Search in Google Scholar
Panas, A., & Pantouvakis, J. P. (2010a). Evaluating research methodology in construction productivity studies. The Built and Human Environment Review, 3(1), pp. 63–85.PanasA. & PantouvakisJ. P.(2010a).Evaluating research methodology in construction productivity studies.,3(1), pp.63–85.Search in Google Scholar
Panas, A., & Pantouvakis, J. P. (2010b). Comparative analysis of operational coefficients’ impact on earthmoving operations. Engineering Construction and Architectural Management, 17(5), pp. 461–475.PanasA. & PantouvakisJ. P.(2010b).Comparative analysis of operational coefficients’ impact on earthmoving operations.,17(5), pp.461–475.Search in Google Scholar
Panas, A., & Pantouvakis, J. P. (2015). Efficiency multipliers for construction productivity: A comparative evaluation. Organisation, Technology and Management in Construction: An International Journal, 7(1), pp. 1186–1196.PanasA. & PantouvakisJ. P.(2015).Efficiency multipliers for construction productivity: A comparative evaluation.,7(1), pp.1186–1196.Search in Google Scholar
Pantouvakis, J. P., & Panas, A. (2013). Computer simulation and analysis framework for floating caisson construction operations. Automation in Construction, 36, pp. 196–207.PantouvakisJ. P. & PanasA.(2013).Computer simulation and analysis framework for floating caisson construction operations.,36, pp.196–207.Search in Google Scholar
Park, H., Thomas, S. R., & Tucker, R. L. (2005). Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7), pp. 772–778.ParkH.ThomasS. R. & TuckerR. L.(2005).Benchmarking of construction productivity.,131(7), pp.772–778.Search in Google Scholar
Peurifoy, R., & Schexnayder, C. (2002). Construction Planning, Equipment and Methods, 6th edn. McGraw-Hill, USA.PeurifoyR. & SchexnayderC.(2002).,6th edn.McGraw-Hill,USA.Search in Google Scholar
SAE. (1993). Standard J296 – Excavator hoe bucket rating. In: SAE Handbook 1999: On-Highway Vehicles and Off-Highway Machinery. Society of Automotive Engineers Inc., Warrendale, USA.SAE. (1993).Standard J296 – Excavator hoe bucket rating. In:.Society of Automotive Engineers Inc.,Warrendale, USA.Search in Google Scholar
Schexnayder, C. J. (1997). Analysis of earth moving systems using discrete-event simulation – Discussion. Journal of Construction Engineering and Management, 123(2), p. 199.SchexnayderC. J.(1997).Analysis of earth moving systems using discrete-event simulation – Discussion.,123(2), p.199.Search in Google Scholar
Sheikh, A., Lakshmipathy, M., & Prakash, A. (2016). Application of queuing theory for effective equipment utilization and maximization of productivity in construction management. International Journal of Applied Engineering Research, 11(8), pp. 5664–5672.SheikhA.LakshmipathyM. & PrakashA.(2016).Application of queuing theory for effective equipment utilization and maximization of productivity in construction management.,11(8), pp.5664–5672.Search in Google Scholar
Thomas, H. R., & Yiakoumis, I. (1987). Factor model of construction productivity. Journal of Construction Engineering and Management, 113(4), pp. 623–639.ThomasH. R. & YiakoumisI.(1987).Factor model of construction productivity.,113(4), pp.623–639.Search in Google Scholar
Volvo. (2015). Volvo Performance Manual, Ref. No. 21, Volvo Construction Equipment.Volvo. (2015).,Volvo Construction Equipment.Search in Google Scholar
Zayed, T. M., & Halpin D. W. (2004). Process versus data oriented techniques in pile construction productivity assessment. Journal of Construction Engineering and Management, 130(4), pp. 490–499.ZayedT. M. & HalpinD. W.(2004).Process versus data oriented techniques in pile construction productivity assessment.,130(4), pp.490–499.Search in Google Scholar