This work is licensed under the Creative Commons Attribution 4.0 International License.
Abisuga, O. A., Ogungbemi, A. O., Akinpelu, A. A., & Oshodi, O. S. (2017). Assessment of building maintenance projects success factors in developing countries. Journal of Construction Business and Management, 1(1), pp. 29-38.AbisugaO. A.OgungbemiA. O.AkinpeluA. A. & OshodiO. S.(2017).Assessment of building maintenance projects success factors in developing countries.,1(1), pp.29-38.Search in Google Scholar
Akasah, Z., & Alriwaimi, H. M. R. (2015). A Review of Factors Affecting the Success of Building Maintenance Projects. Universit Tun Hussein Onn Malaysia, pp. 1-10.AkasahZ. & AlriwaimiH. M. R.(2015)..Universit Tun Hussein Onn Malaysia, pp.1-10.Search in Google Scholar
Akasah, Z.A., & Alriwaimi, H.M. (2015), A review of factors affecting the success of building maintenance projects”, The 2nd International Conference on Construction and Building Engineering (ICONBUILD 2015), 11-13 August 2015. Grand Inn Muara, Padang, West Sumatera, Indonesia, pp. 1-10.AkasahZ.A. & AlriwaimiH.M.(2015),A review of factors affecting the success of building maintenance projects”,.Grand Inn Muara,Padang, West Sumatera, Indonesia, pp.1-10.Search in Google Scholar
Barrett, P. S., Hudson, J., & Stanley, C. (1996). Is briefing innovation? In: Langford, D. A., & Retik, A. (eds.), International Symposium for the Organisation and Management of Construction: Shaping Theory and Practice. E & F N Spon, London, pp. 87-95.BarrettP. S.HudsonJ. & StanleyC.(1996).Is briefing innovation?In:LangfordD. A. & RetikA.(eds.),.E & F N Spon,London, pp.87-95.Search in Google Scholar
Barrie, D. S., & Paulson, B. C. (1992). Professional Construction Management, 3rd edn. McGraw-Hill Publishing Company.BarrieD. S. & PaulsonB. C.(1992).,3rd edn.McGraw-Hill Publishing Company.Search in Google Scholar
Barrett, P., & Stanley, C. (1999), Better Construction Briefing, 1st ed., Blackwell Science, Oxford.BarrettP. & StanleyC.(1999),,1st ed.,Blackwell Science,Oxford.Search in Google Scholar
Basi, D. (2015). How does early supplier involvement (ESI) timing affect development costs. In: 5th International Business Administration (IBA) Bachelor Thesis Conference, University of Twente, The Faculty of Behavioural, Management and Social sciences, Enschede, The Netherlands, pp. 85-92.BasiD.(2015).How does early supplier involvement (ESI) timing affect development costs. In:,University of Twente, The Faculty of Behavioural, Management and Social sciences,Enschede, The Netherlands, pp.85-92.Search in Google Scholar
BSI. (2001). Maintenance terminology. BS EN 13306:2001 BSI.BSI. (2001).. BS EN 13306:2001BSI.Search in Google Scholar
Building and Construction Authority. (2014). Design for maintainability checklist. Available at https://www1.bca.gov.sg/docs/default-source/docs-corp-buildsg/dm_checklist_2016. pdf?sfvrsn=8c2da349_0 (Access Date: 8 July 2023).Building and Construction Authority. (2014).. Available at https://www1.bca.gov.sg/docs/default-source/docs-corp-buildsg/dm_checklist_2016.pdf?sfvrsn=8c2da349_0(Access Date: 8 July 2023).Search in Google Scholar
Chavhan, R., Mahajan, S. K., & Sarang, J. (2012). Supplier development: Theories and practices. IOSR Journal of Mechanical and Civil Engineering, 3(3), pp. 37-51.ChavhanR.MahajanS. K. & SarangJ.(2012).Supplier development: Theories and practices.,3(3), pp.37-51.Search in Google Scholar
Chen, Y. (2010). Evaluation of early supplier involvement in product development. M.Sc. thesis, Purdue University, West Lafayette, Indiana.ChenY.(2010)..M.Sc. thesis, Purdue University,West Lafayette, Indiana.Search in Google Scholar
Chew, M. Y. L., Asmone, A. S., & Conejos, S. (2018). Design for maintainability: Benchmarks for quality buildings. World Scientific Publishing Co. Pte. Ltd., Singapore.ChewM. Y. L.AsmoneA. S. & ConejosS.(2018)..World Scientific Publishing Co. Pte. Ltd.,Singapore.Search in Google Scholar
De Silva, N., Ranasinghe, M., & De Silva, C. R. (2012). Risk factors affecting building maintenance under tropical conditions. Journal of Financial Management of Property and Construction, 17(3), pp. 235-252.De SilvaN.RanasingheM. & De SilvaC. R.(2012).Risk factors affecting building maintenance under tropical conditions.,17(3), pp.235-252.Search in Google Scholar
EDMS. (2010). Framework. Engineering Data Management Service. Available at http://cedar.web.cern.ch/CEDAR/glossary.html#Framework [accessed 2 January, 2010].EDMS. (2010)..Engineering Data Management Service. Available at http://cedar.web.cern.ch/CEDAR/glossary.html#Framework[accessed 2 January, 2010].Search in Google Scholar
EES. (2019). Egyptian engineers syndicate, Available at http://eea.org.eg/ [accessed 6 February, 2022].EES. (2019)., Available at http://eea.org.eg/[accessed 6 February, 2022].Search in Google Scholar
El-Saeidy, Y. A. A., & Othman, A. A. E. (2021). Early supplier involvement: A novel approach for reducing construction waste generated during the architectural design process. In: Proceedings of the 3rd International Conference on Sustainable Construction and Project Management: Integrated Management for Smart Cities, ICSCPM 21, Housing and Building National Research Center, Dokki, 20-22 June 2021.El-SaeidyY. A. A. & OthmanA. A. E.(2021).Early supplier involvement: A novel approach for reducing construction waste generated during the architectural design process. In:,Housing and Building National Research Center,Dokki,20-22June2021.Search in Google Scholar
FluidSurveys Team. (2014). Calculating the right survey sample size, Available at http://fluidsurveys.com/university/calculating-right-survey-sample-size/ [accessed 2 February, 2022].FluidSurveys Team. (2014)., Available at http://fluidsurveys.com/university/calculating-right-survey-sample-size/[accessed 2 February, 2022].Search in Google Scholar
Freedman, D. A., Pisani, R., & Purves, R. A. (2007). Statistics. 4th edn. WW Norton, New York.FreedmanD. A.PisaniR. & PurvesR. A.(2007)..4th edn.WW Norton,New York.Search in Google Scholar
Hannagan, T. J. (1997). Mastering Statistics, 3rd edn. Palgrave Macmillan Education Ltd., London.HannaganT. J.(1997).,3rd edn.Palgrave Macmillan Education Ltd.,London.Search in Google Scholar
John, M., & Jeffrey, R. (2000). Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450.JohnM. & JeffreyR.(2000).Model process for implementing maintainability.,126(6), pp.440-450.Search in Google Scholar
Johnsen, T. E. (2009). Supplier involvement in new product development and innovation: Taking stock and looking to the future. Journal of Purchasing and Supply Management, 15(3), pp. 187-197.JohnsenT. E.(2009).Supplier involvement in new product development and innovation: Taking stock and looking to the future.,15(3), pp.187-197.Search in Google Scholar
Jones, R. B. (1995). Risk-Based Management: A Reliability Centered Approach. Gulf Publishing Company, Houston, Texas.JonesR. B.(1995)..Gulf Publishing Company,Houston, Texas.Search in Google Scholar
Kamal, A., Othman, A. A. E., & Refaat, M. (2019). Enhancing building maintainability through suppliers involvement in project design phase. In: Proceedings of the International Conference on Architecture and Urbanism: A Smart Outlook, Hilton Heliopolis Cairo, October 14-16, 2019, pp. 485-498.KamalA.OthmanA. A. E. & RefaatM.(2019).Enhancing building maintainability through suppliers involvement in project design phase. In:,Hilton HeliopolisCairo,October14-16, 2019,pp.485-498.Search in Google Scholar
Kamara, J. M., Anumba, C. J. & Hobbs, B. (1999), “From briefing to client requirements processing”, Proceedings of the 15th Annual Conference, Association of Research in Construction Management (ARCOM), Liverpool John Moores University, Liverpool, 15-17 September 1999, Vol. 1, pp. 317-326.KamaraJ. M.AnumbaC. J. & HobbsB.(1999), “”,Proceedings of the 15th Annual Conference, Association of Research in Construction Management (ARCOM), Liverpool John Moores University,Liverpool,15-17 September 1999, Vol.1, pp.317-326.Search in Google Scholar
Kannan, V. R., & Tan, K. C. (2002), Supplier selection and assessment: their impact on business performance. The Journal of Supply Chain Management, 38, pp. 11-21.KannanV. R. & TanK. C.(2002),Supplier selection and assessment: their impact on business performance.,38, pp.11-21.Search in Google Scholar
Kanniyapana, G., Mohammad, I.S., Nesanc, L. J., Mohammed, A. H., Abdullah, M. N. M, Asmonib, M. & Ganisena, S. (2015), “Implementing maintainability in building material selection: a preliminary survey”, Jurnal Teknologi (Sciences & Engineering), 77 (30), pp. 145-154.KanniyapanaG.MohammadI.S.NesancL. J.MohammedA. H.AbdullahM. N. MAsmonibM. & GanisenaS.(2015), “Implementing maintainability in building material selection: a preliminary survey”,,77(30), pp.145-154.Search in Google Scholar
Katunzi, T. M. (2011). Obstacles to process integration along the supply chain: Manufacturing firms perspective international. Journal of Business and Management, 6(5), pp. 105-113.KatunziT. M.(2011).Obstacles to process integration along the supply chain: Manufacturing firms perspective international.,6(5), pp.105-113.Search in Google Scholar
Khan, S. (2013). Designing buildings for minimum maintenance to achieve sustainability. Journal of Architecture, 3(4), pp. 74-78. doi: 10.5923/j.arch.20130304.04.KhanS.(2013).Designing buildings for minimum maintenance to achieve sustainability.,3(4), pp.74-78. doi:10.5923/j.arch.20130304.04.Open DOISearch in Google Scholar
Koufteros, X. A., Edwin Cheng, T. C., & Lai, K.-H. (2007). “Black-box” and “gray-box” supplier integration in product development: Antecedents, consequences and the moderating role of firm size. Journal of Operations Management, 25(4), pp. 847-870. doi: 10.1016/j.jom.2006.10.009.KoufterosX. A.Edwin ChengT. C. & LaiK.-H.(2007).“Black-box” and “gray-box” supplier integration in product development: Antecedents, consequences and the moderating role of firm size.,25(4), pp.847-870. doi:10.1016/j.jom.2006.10.009.Open DOISearch in Google Scholar
Lau, W. K., & Ho, D. C. W. (2010). Facilities Management for Building Maintainability: A Research Framework. CIB W70 International Conference on Facilities Management, Sao Paulo, Brazil, pp. 655-670.LauW. K. & HoD. C. W.(2010)..CIB W70 International Conference on Facilities Management,Sao Paulo, Brazil, pp.655-670.Search in Google Scholar
Levitt, J. D. (2013). Facilities Management: Managing Maintenance for Buildings and Facilities. Momentum Press LLC. New York.LevittJ. D.(2013)..Momentum Press LLC.New York.Search in Google Scholar
Mann, D. (2005). Creating a Lean Culture: Tools to Sustain Lean Conversations. Productivity Press, a division of The Kraus Organization, New York.MannD.(2005)..Productivity Press, a division of The Kraus Organization,New York.Search in Google Scholar
Martensson, M. (2000). A critical review of knowledge management as a management Tool. Journal of Knowledge Management, 4(3), pp. 204-216.MartenssonM.(2000).A critical review of knowledge management as a management Tool.,4(3), pp.204-216.Search in Google Scholar
McIvor, R. (2004). Early supplier involvement in the design process: Lessons from the electronics industry. Omega, 32(3), pp. 179-199.McIvorR.(2004).Early supplier involvement in the design process: Lessons from the electronics industry.,32(3), pp.179-199.Search in Google Scholar
Northey, G. (2018). An Introduction to Early Supplier Involvement in the Construction Industry. CRH Americas, Inc. Available at https://www.buildingsolutions.com/industry-insights/introduction-to-earlier-supplier-involvement-in-the-construction-industry [Accessed 20 November, 2019].NortheyG.(2018)..CRH Americas, Inc. Available at https://www.buildingsolutions.com/industry-insights/introduction-to-earlier-supplier-involvement-in-the-construction-industry[Accessed 20 November, 2019].Search in Google Scholar
Oberlo. (2021). What is a supplier in a business? What Is a Supplier and What Is Their Role in a Business? Available at oberlo.com.Oberlo. (2021).Available at oberlo.com.Search in Google Scholar
Ofori, I., Duodu, P. M., & Bonney, S. O. (2015). Establishing factors influencing building maintenance practices: Ghanaian perspective. Journal of Economics and Sustainable development, 6, pp. 184-193.OforiI.DuoduP. M. & BonneyS. O.(2015).Establishing factors influencing building maintenance practices: Ghanaian perspective.,6, pp.184-193.Search in Google Scholar
Ogunmakinde, O. E., Akinola, A. A., & Siyanbola, A. B. (2013). Analysis of the factors affecting building maintenance in government residential estates in Akure. Journal of Environmental Sciences and Resources Management, 5(2), pp. 89-103.OgunmakindeO. E.AkinolaA. A. & SiyanbolaA. B.(2013).Analysis of the factors affecting building maintenance in government residential estates in Akure.,5(2), pp.89-103.Search in Google Scholar
Othman, A. A. E. (2007). Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in Abu Dhabi, United Arab Emirates. Architectural Engineering and Design Management, 3(3), pp. 145-159.OthmanA. A. E.(2007).Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in Abu Dhabi, United Arab Emirates.,3(3), pp.145-159.Search in Google Scholar
Othman, A. A. E., & El-Saeidy, Y. A. (2022). Early supplier involvement framework for reducing construction waste during the design process. Journal of Engineering, Design and Technology. doi: 10.1108/JEDT-10-2021-0566.OthmanA. A. E. & El-SaeidyY. A.(2022).Early supplier involvement framework for reducing construction waste during the design process.. doi:10.1108/JEDT-10-2021-0566.Open DOISearch in Google Scholar
Othman, A. A. E., Hassan, T. M., & Pasquire, C. L. (2004). Drivers for dynamic brief development in construction. Engineering, Construction and Architectural Management, 11(4), pp. 248-258.OthmanA. A. E.HassanT. M. & PasquireC. L.(2004).Drivers for dynamic brief development in construction.,11(4), pp.248-258.Search in Google Scholar
Othman, A. A. E., & Youssef, L. Y. W. (2020). A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(3), pp. 721-757. doi: 10.1108/JEDT-02-2020-0047.OthmanA. A. E. & YoussefL. Y. W.(2020).A framework for implementing integrated project delivery in architecture design firms in Egypt.,19(3), pp.721-757. doi:10.1108/JEDT-02-2020-0047.Open DOISearch in Google Scholar
PAS 1192-2. (2019). Specification for information management for the capital/delivery phase of construction projects using building information modelling, Publicly Available Specifications. Available at PAS 1192-2: PAS 1192-2 Delivery Phase of Construction Project – Operam.PAS 1192-2. (2019).. Available at PAS 1192-2: PAS 1192-2 Delivery Phase of Construction Project – Operam.Search in Google Scholar
PMBok. (2021). A Guide to the Project Management Body of Knowledge, 7th edn. Project Management Institute, Inc. Pennsylvania.PMBok. (2021).,7th edn.Project Management Institute, Inc.Pennsylvania.Search in Google Scholar
Petersen, K., Handfield, R., & Ragatz, G. (2003), A model of supplier integration into new product development. Journal of Product Innovation Management, 20(4), pp. 284-299.PetersenK.HandfieldR. & RagatzG.(2003),A model of supplier integration into new product development.,20(4), pp.284-299.Search in Google Scholar
Rached, F., Hraoui, Y., Karam, A., & Hamzeh, F. (2014). Implementation of IPD in the Middle East and its challenges. In: Proceedings International Group for Lean Construction, Oslo, Norway, Proceedings IGLC-22, pp. 293-304.RachedF.HraouiY.KaramA. & HamzehF.(2014).. In:Proceedings International Group for Lean Construction,Oslo, Norway, Proceedings IGLC-22, pp.293-304.Search in Google Scholar
RIBA. (2020). RIBA Plan of Work 2020. The Royal Institute of British Architects, London.RIBA. (2020)..The Royal Institute of British Architects,London.Search in Google Scholar
Rocha, P. F., & Rodrigues, R. C. (2017). How to maintain buildings: Intervention strategies for the operationalization process of building maintenance regarding the design stages. Available at LV2017Howtomaintain.pdf.RochaP. F. & RodriguesR. C.(2017).. Available at LV2017Howtomaintain.pdf.Search in Google Scholar
Saghatforoush, E. (2014). Extension of constructability to include operation and maintenance for infrastructure projects. PhD thesis, Science and Engineering Faculty Queensland University of Technology.SaghatforoushE.(2014)..PhD thesis, Science and Engineering Faculty Queensland University of Technology.Search in Google Scholar
Sofi, M., Zou, Z., Lumantarna, E., Mendis, P., & Aye, L. (2016). Maintenance of building structural systems. In: 7th International Conference on Sustainable Built Environment (ICSBE), Kandy, Sri Lanka, pp. 53-61.SofiM.ZouZ.LumantarnaE.MendisP. & AyeL.(2016).. In:7th International Conference on Sustainable Built Environment (ICSBE),Kandy, Sri Lanka, pp.53-61.Search in Google Scholar
Son, L., & Yuen, G. (1993). Building Maintenance Technology. Macmillan Press Ltd, London.SonL. & YuenG.(1993)..Macmillan Press Ltd,London.Search in Google Scholar
Storey, J., & Barnett, E. (2000). Knowledge management initiatives: Learning from Failure. Journal of Knowledge Management, 4(2), pp. 145-156.StoreyJ. & BarnettE.(2000).Knowledge management initiatives: Learning from Failure.,4(2), pp.145-156.Search in Google Scholar
Sturman, A. (1997). Case study methods. In: Keeves, J. P. (ed.), Educational Research, Methodology and Measurement: An International Handbook, 2nd edn. Pergamon, Oxford, pp. 61-66.SturmanA.(1997).Case study methods. In:KeevesJ. P.(ed.),,2nd edn.Pergamon, Oxford, pp.61-66.Search in Google Scholar
Talib, R., Ahmad, G., Zakaria, N., & Sulieman, M. (2014). Assessment of factors affecting building maintenance and defects of public buildings in Penang, Malaysia. Architecture Research, 4(2), pp. 48-53.TalibR.AhmadG.ZakariaN. & SuliemanM.(2014).Assessment of factors affecting building maintenance and defects of public buildings in Penang, Malaysia.,4(2), pp.48-53.Search in Google Scholar
Watson, P., & Asher, H. (1999). Implementation of value management in construction. Construction Information Quarterly, 1(2), pp. 1-9.WatsonP. & AsherH.(1999).Implementation of value management in construction.,1(2), pp.1-9.Search in Google Scholar
Williamson, A., Williams, C., & Gameson, R. (2010). The consideration of maintenance issues during the design process in the UK public sector. In: Egbu, C. (ed.), Proceedings of the 26th Annual ARCOM Conference, 6-8 September 2010, Association of Researchers in Construction Management, Leeds, UK, pp. 1091-1100.WilliamsonA.WilliamsC. & GamesonR.(2010).The consideration of maintenance issues during the design process in the UK public sector. In:EgbuC.(ed.),,6-8September2010,Association of Researchers in Construction Management,Leeds, UK, pp.1091-1100.Search in Google Scholar
Wynstra, F. (1998). Purchasing involvement in product development. Doctoral thesis, Eindhoven University of Technology.WynstraF.(1998)..Doctoral thesis, Eindhoven University of Technology.Search in Google Scholar
Zhao, Y., Cavusgil, E., & Cavusgil, S. T. (2014). An investigation of the black-box supplier integration in new product development. Journal of Business Research, 67(6), pp. 1058-1064.ZhaoY.CavusgilE. & CavusgilS. T.(2014).An investigation of the black-box supplier integration in new product development.,67(6), pp.1058-1064.Search in Google Scholar