Cite

Abdelsalam, H. M., & Gad, M. M. (2009). Cost of quality in Dubai: An analytical case study of residential construction projects. International Journal of Project Management, 27(5), pp. 501–511. AbdelsalamH. M. GadM. M. 2009 Cost of quality in Dubai: An analytical case study of residential construction projects International Journal of Project Management 27 5 501 511 10.1016/j.ijproman.2008.07.006 Search in Google Scholar

Abdul-Rahman, H. (1993). Capturing the cost of quality failures in civil engineering. International Journal of Quality & Reliability Management, 10(3), pp. 20–32. Abdul-RahmanH. 1993 Capturing the cost of quality failures in civil engineering International Journal of Quality & Reliability Management 10 3 20 32 10.1108/02656719310037956 Search in Google Scholar

Abdul-Rahman, H. (1995). The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23–32. Abdul-RahmanH. 1995 The cost of non-conformance during a highway project: A case study Construction Management and Economics 13 1 23 32 10.1080/01446199500000004 Search in Google Scholar

Abdul-Rahman, H., Thompson, P. A., & Whyte, I. L. (1996). Capturing the cost of non-conformance on construction sites: An application of the quality cost matrix. International Journal of Quality & Reliability Management, 13(1), pp. 48–60. Abdul-RahmanH. ThompsonP. A. WhyteI. L. 1996 Capturing the cost of non-conformance on construction sites: An application of the quality cost matrix International Journal of Quality & Reliability Management 13 1 48 60 10.1108/02656719610108314 Search in Google Scholar

Ahzahar, N., Karim, N. A., Hassan, S. H., & Eman, J. (2011). A study of contribution factors to building failures and defects in construction industry. Procedia Engineering, 20, pp. 249–255. AhzaharN. KarimN. A. HassanS. H. EmanJ. 2011 A study of contribution factors to building failures and defects in construction industry Procedia Engineering 20 249 255 10.1016/j.proeng.2011.11.162 Search in Google Scholar

Aljailawi, H. R., & Shariatmadar, H. (2017). The reasons for rework occurrence in construction projects and prioritizing them by using AHP Method. 2nd. International Conference on Civil Engineering, Architecture and Urban Design. AljailawiH. R. ShariatmadarH. 2017 The reasons for rework occurrence in construction projects and prioritizing them by using AHP Method 2nd. International Conference on Civil Engineering, Architecture and Urban Design Search in Google Scholar

Ali, A.S., & Wen, K. H. (2011). Building defects: Possible solution for poor construction workmanship. Journal of Building Performance, 2(1). AliA.S. WenK. H. 2011 Building defects: Possible solution for poor construction workmanship Journal of Building Performance 2 1 Search in Google Scholar

Ali, M. C., Zin, R. M., Abd Hamid, Z., & Ayub, A. R. (2010). Quality cost in the construction industry–preliminary findings in Malaysia. Journal of Design and Built Environment, 6(1). AliM. C. ZinR. M. Abd HamidZ. AyubA. R. 2010 Quality cost in the construction industry–preliminary findings in Malaysia Journal of Design and Built Environment 6 1 Search in Google Scholar

Al-Tmeemy, S. M., Abdul-Rahman, H., & Harun, Z. (2012). Contractors’ perception of the use of costs of quality system in Malaysian building construction projects. International Journal of Project Management, 30(7), pp. 827–838. Al-TmeemyS. M. Abdul-RahmanH. HarunZ. 2012 Contractors’ perception of the use of costs of quality system in Malaysian building construction projects International Journal of Project Management 30 7 827 838 10.1016/j.ijproman.2011.12.001 Search in Google Scholar

Arditi, D., & Gunaydin, H. M. (1998). Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194–203. ArditiD. GunaydinH. M. 1998 Factors that affect process quality in the life cycle of building projects Journal of Construction Engineering and Management 124 3 194 203 10.1061/(ASCE)0733-9364(1998)124:3(194) Search in Google Scholar

Ashworth, A., & Perera, S. (2012). Contractual Procedures in the Construction Industry, sixth edition. Routledge, New York. AshworthA. PereraS. 2012 Contractual Procedures in the Construction Industry sixth edition Routledge New York Search in Google Scholar

Beswick, J., Rogers, K., Corbett, E., Binch, S., & Jackson, K. (2007). An analysis of the prevalence and distribution of stress in the construction industry. Health and Safety Executive, RR518 Research Report, Derbyshire, pp. 1–81. BeswickJ. RogersK. CorbettE. BinchS. JacksonK. 2007 An analysis of the prevalence and distribution of stress in the construction industry Health and Safety Executive RR518 Research Report Derbyshire 1 81 Search in Google Scholar

BSI (2015) BSI Standards Publication: BS EN ISO 9000:2015Quality management systems Fundamentals and vocabulary. ISBN 978 0 580 78878 9. BSI 2015 BSI Standards Publication: BS EN ISO 9000:2015Quality management systems Fundamentals and vocabulary ISBN 978 0 580 78878 9. Search in Google Scholar

Building Research Establishment (BRE). (1981). “Quality control on building sites.” Current paper 7/81, HMSO, London. Building Research Establishment (BRE) 1981 “Quality control on building sites.” Current paper 7/81 HMSO London Search in Google Scholar

Burati Jr, James L., Farrington, J. J. & Ledbetter, W. B. (1992). Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34–49. BuratiJames L.Jr FarringtonJ. J. LedbetterW. B. 1992 Causes of quality deviations in design and construction Journal of Construction Engineering and Management 118 1 34 49 10.1061/(ASCE)0733-9364(1992)118:1(34) Search in Google Scholar

Bureau of Economic Analysis (BEA). (2006). “Gross domestic product by industry in current dollars.” Available at http://bea.gov/bea/dn2/gdpbyind_data.htm [Accessed on 2006 October 20]. Bureau of Economic Analysis (BEA) 2006 “Gross domestic product by industry in current dollars.” Available at http://bea.gov/bea/dn2/gdpbyind_data.htm [Accessed on 2006 October 20]. Search in Google Scholar

Chan, A. P., & Tam, C. M. (2000). Factors affecting the quality of building projects in Hong Kong. International Journal of Quality & Reliability Management, 17(4/5), pp. 423–442. ChanA. P. TamC. M. 2000 Factors affecting the quality of building projects in Hong Kong International Journal of Quality & Reliability Management 17 4/5 423 442 10.1108/02656710010298445 Search in Google Scholar

Chung, H. W. (2002). Understanding quality assurance in construction: A practical guide to ISO 9000 for contractors. Routledge. ChungH. W. 2002 Understanding quality assurance in construction: A practical guide to ISO 9000 for contractors Routledge 10.4324/9780203015834 Search in Google Scholar

CIOB (Chartered Institute of Building, 2006) Occupational Stress in the Construction Industry Survey 2006. Carey C. 2010. Avoiding project rework: measure twice and cut once [Internet]. Blueprint Software Systems Inc. Available from http://www.blueprintsys.com/blog [Accessed on 2019 December 12]. CIOB (Chartered Institute of Building) 2006 Occupational Stress in the Construction Industry Survey 2006 Carey C. 2010. Avoiding project rework: measure twice and cut once [Internet]. Blueprint Software Systems Inc. Available from http://www.blueprintsys.com/blog [Accessed on 2019 December 12]. Search in Google Scholar

CIOB (Chartered Institute of Building 2019a) Code of Quality Management: Guide to Best Practice Construction Quality Management. www.ciob.org. ISBN 978-1-9162063-1-1. CIOB (Chartered Institute of Building) 2019a Code of Quality Management: Guide to Best Practice Construction Quality Management www.ciob.org. ISBN 978-1-9162063-1-1. Search in Google Scholar

CIOB (19 July 2019b) Safety crackdown: Malaysia to hold developers and designers accountable for accidents. Available at http://www.globalconstructionreview.com/news/safety-crackdown-malaysia-hold-developers-and-desi/ [Accessed on 2019 December 13]. CIOB 19 July 2019b Safety crackdown: Malaysia to hold developers and designers accountable for accidents Available at http://www.globalconstructionreview.com/news/safety-crackdown-malaysia-hold-developers-and-desi/ [Accessed on 2019 December 13]. Search in Google Scholar

CIDB (28 June, 2019) Media Statement: Batu Ferringhi, Wangsa Maju and Gombak Construction Site Incidents Investigated Under CIDB ACT. Available at https://www.cidb.gov.my/sites/default/files/2020-04/CONSTRUCTION-SITE-INCIDENTS-INVESTIGATED-UNDER-CIDB-ACT--.pdf. CIDB 28 June 2019 Media Statement: Batu Ferringhi, Wangsa Maju and Gombak Construction Site Incidents Investigated Under CIDB ACT Available at https://www.cidb.gov.my/sites/default/files/2020-04/CONSTRUCTION-SITE-INCIDENTS-INVESTIGATED-UNDER-CIDB-ACT--.pdf. Search in Google Scholar

dos Reis Almeida, R. A. S. (2011). Evaluation and modelling of the costs of non-quality in the Portuguese construction industry. Available at https://fenix.tecnico.ulisboa.pt/downloadFile/395143180796/abstract.pdf [Accessed on 12 June 2020] dos Reis AlmeidaR. A. S. 2011 Evaluation and modelling of the costs of non-quality in the Portuguese construction industry Available at https://fenix.tecnico.ulisboa.pt/downloadFile/395143180796/abstract.pdf [Accessed on 12 June 2020] Search in Google Scholar

Egan, J. (1998). Rethinking Construction, Department of the Environment Transport and Regions, HMSO, London. EganJ. 1998 Rethinking Construction, Department of the Environment Transport and Regions HMSO London Search in Google Scholar

Fayek, A. R., Dissanayake, M., & Campero, O. (2003). Measuring and classifying construction field rework: A pilot study. Research Rep. (May), Construction Owners Association of Alberta _COAA_, The University of Alberta, Edmonton, Al., Canada. FayekA. R. DissanayakeM. CamperoO. 2003 Measuring and classifying construction field rework: A pilot study Research Rep May Construction Owners Association of Alberta _COAA_, The University of Alberta Edmonton, Al., Canada Search in Google Scholar

Fisk, E. R. (2003). Construction project management, 7th ed. Upper Saddle River, New York, Prentice-Hall. FiskE. R. 2003 Construction project management 7th ed. Upper Saddle River, New York Prentice-Hall Search in Google Scholar

Fisk, E. R., & Rapp, R. R. (2004). Introduction to engineering construction inspection. Hoboken, New Jersey: John Wiley and Sons Inc. FiskE. R. RappR. R. 2004 Introduction to engineering construction inspection Hoboken, New Jersey John Wiley and Sons Inc. Search in Google Scholar

Hall, M., & Tomkins, C. (2001). A cost of quality analysis of a building project: towards a complete methodology for design and build. Construction Management and Economics, 19(7), pp. 727–740. HallM. TomkinsC. 2001 A cost of quality analysis of a building project: towards a complete methodology for design and build Construction Management and Economics 19 7 727 740 10.1080/01446190110066146 Search in Google Scholar

Hammarlund, Y., Jacobsson, S., & Josephson, P. (1990a). Quality failure costs in building construction. Proc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation, Sydney, Australia, pp. 77–89. HammarlundY. JacobssonS. JosephsonP. 1990a Quality failure costs in building construction Proc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation Sydney, Australia 77 89 Search in Google Scholar

Hammarlund, Y., Jacobsson, S., & Josephson, P. (1990b). Quality observer—a new role at the construction site? Proc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation, Sydney, Australia, pp. 90–102. HammarlundY. JacobssonS. JosephsonP. 1990b Quality observer—a new role at the construction site? Proc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation Sydney, Australia 90 102 Search in Google Scholar

Hammarlund, Y., & Josephson, P. E. (1991). Sources of quality failures in building. Proc., European Symposium on Management, Quality and Economics in Housing and Other Building Sectors, 671, pp. 679. HammarlundY. JosephsonP. E. 1991 Sources of quality failures in building Proc., European Symposium on Management, Quality and Economics in Housing and Other Building Sectors 671 679 Search in Google Scholar

Heravi, G., & Jafari, A. (2014). Cost of quality evaluation in mass-housing projects in developing countries. Journal of Construction Engineering and Management, 140(5), pp. 04014004. HeraviG. JafariA. 2014 Cost of quality evaluation in mass-housing projects in developing countries Journal of Construction Engineering and Management 140 5 04014004 10.1061/(ASCE)CO.1943-7862.0000837 Search in Google Scholar

Hong, C. H. (2016). Investigation of Defects in New Buildings in Malaysia. Unpublished BSc. UTAR. HongC. H. 2016 Investigation of Defects in New Buildings in Malaysia Unpublished BSc. UTAR Search in Google Scholar

Hoonakker, P., Carayon, P., & Loushine, T. (2010). Barriers and benefits of quality management in the construction industry: An empirical study. Total quality management, 21(9), pp. 953–969. HoonakkerP. CarayonP. LoushineT. 2010 Barriers and benefits of quality management in the construction industry: An empirical study Total quality management 21 9 953 969 10.1080/14783363.2010.487673 Search in Google Scholar

Hoonakker, P. (2006). Quality management in construction industry. Proceedings: ASQ World Conference on Quality and Improvement, Milwaukee, WI, 1–3 May, pp. 1–9. HoonakkerP. 2006 Quality management in construction industry Proceedings: ASQ World Conference on Quality and Improvement Milwaukee, WI 1–3 May 1 9 Search in Google Scholar

Husin, H. N., Adnan, H., & Jusoff, K. (2008). Management of safety for quality construction. Journal of Sustainable Development, 1(3), pp. 41–47. HusinH. N. AdnanH. JusoffK. 2008 Management of safety for quality construction Journal of Sustainable Development 1 3 41 47 10.5539/jsd.v1n3p41 Search in Google Scholar

Hwang, B. G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187–198. HwangB. G. ThomasS. R. HaasC. T. CaldasC. H. 2009 Measuring the impact of rework on construction cost performance Journal of Construction Engineering and Management 135 3 187 198 10.1061/(ASCE)0733-9364(2009)135:3(187) Search in Google Scholar

Hwang, B. G., & Yang, S. (2014). Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190–205. HwangB. G. YangS. 2014 Rework and schedule performance: A profile of incidence, impact, causes and solutions Engineering, Construction and Architectural Management 21 2 190 205 10.1108/ECAM-10-2012-0101 Search in Google Scholar

Jaafari, A., Chan, M. A., & Cassab, R. (1994). Quality management in the Australian construction industry. In Wakefield, R. R., & Carmichael, D. G. (Eds), Construction and Management, Recent Advances, Balkema, Rotterdam, pp. 89–112. JaafariA. ChanM. A. CassabR. 1994 Quality management in the Australian construction industry In WakefieldR. R. CarmichaelD. G. (Eds), Construction and Management, Recent Advances Balkema Rotterdam 89 112 Search in Google Scholar

Janipha, N. A. I. & Ismail, F. (2013). Conceptualisation of quality issues in Malaysian construction environment. Procedia-Social and Behavioral Sciences, 101, pp. 53–61. JaniphaN. A. I. IsmailF. 2013 Conceptualisation of quality issues in Malaysian construction environment Procedia-Social and Behavioral Sciences 101 53 61 10.1016/j.sbspro.2013.07.178 Search in Google Scholar

Jonsson, A. Z., & Gunnelin, R. H. (2019). Defects in newly constructed residential buildings: owners’ perspective. International Journal of Building Pathology and Adaptation, 37(2), pp. 163–185. https://doi.org/10.1108/IJBPA-09-2018-0077. JonssonA. Z. GunnelinR. H. 2019 Defects in newly constructed residential buildings: owners’ perspective International Journal of Building Pathology and Adaptation 37 2 163 185 https://doi.org/10.1108/IJBPA-09-2018-0077. 10.1108/IJBPA-09-2018-0077 Search in Google Scholar

Josephson, P. E., & Hammarlund, Y. (1999). The causes and costs of defects in construction: A study of seven building projects. Automation in Construction, 8(6), pp. 681–687. JosephsonP. E. HammarlundY. 1999 The causes and costs of defects in construction: A study of seven building projects Automation in Construction 8 6 681 687 10.1016/S0926-5805(98)00114-9 Search in Google Scholar

Josephson, P. E., Larsson, B., & Li, H. (2002). Illustrative benchmarking rework and rework costs in Swedish construction industry. Journal of Management in Engineering, 18(2), pp. 76–83. JosephsonP. E. LarssonB. LiH. 2002 Illustrative benchmarking rework and rework costs in Swedish construction industry Journal of Management in Engineering 18 2 76 83 10.1061/(ASCE)0742-597X(2002)18:2(76) Search in Google Scholar

Josephson, P. E., & Hammarlund, Y. (1996). The cost of defects in construction. Proc., CIB-W65 Int. Symposium for the Organization and Management of Construction: Shaping Theory and Practice, 2, pp. 519–528. JosephsonP. E. HammarlundY. 1996 The cost of defects in construction Proc., CIB-W65 Int. Symposium for the Organization and Management of Construction: Shaping Theory and Practice 2 519 528 Search in Google Scholar

Jha, K. N., & Iyer, K. C. (2006). Critical factors affecting quality performance in construction projects. Total Quality Management and Business Excellence, 17(9), pp. 1155–1170. JhaK. N. IyerK. C. 2006 Critical factors affecting quality performance in construction projects Total Quality Management and Business Excellence 17 9 1155 1170 10.1080/14783360600750444 Search in Google Scholar

Joaquin, D. Hernandez, D. & Aspinwall, E. (2008). A framework for building quality into construction projects-Part I. Total Quality Management, 19(10), pp. 1013–1028. JoaquinD. HernandezD. AspinwallE. 2008 A framework for building quality into construction projects-Part I Total Quality Management 19 10 1013 1028 10.1080/14783360802264061 Search in Google Scholar

Juran, J. M. (1999). Juran's Quality Handbook, 5, Edited by: Godfrey, A. B. New York: McGraw-Hill. JuranJ. M. 1999 Juran's Quality Handbook 5 Edited by: GodfreyA. B. New York McGraw-Hill Search in Google Scholar

Kakitahi, J. M., Landin, A., & Alinaitwe, H. M. (2013). An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266–280. KakitahiJ. M. LandinA. AlinaitweH. M. 2013 An exploratory study of rework causality in Uganda Construction Innovation 13 3 266 280 10.1108/CI-Nov-2011-0051 Search in Google Scholar

Kakitahi, J. M., Alinaitwe, H. M., Landin, A., & Rodrigues, M. J. (2014). A comparison of construction related rework in Uganda and Mozambique. Journal of Construction Project Management and Innovation, 4(1), pp. 770–781. KakitahiJ. M. AlinaitweH. M. LandinA. RodriguesM. J. 2014 A comparison of construction related rework in Uganda and Mozambique Journal of Construction Project Management and Innovation 4 1 770 781 Search in Google Scholar

Kazaz, A., Birgonul, M. T., & Ulubeyli, S. (2005). Cost-based analysis of quality in developing countries: A case study of building projects. Building and Environment, 40(10), pp. 1356–1365. KazazA. BirgonulM. T. UlubeyliS. 2005 Cost-based analysis of quality in developing countries: A case study of building projects Building and Environment 40 10 1356 1365 10.1016/j.buildenv.2004.11.010 Search in Google Scholar

Kelly, J. (2007). Making client values explicit in value management workshops. Construction Management and Economics, 25(4), 435–442. KellyJ. 2007 Making client values explicit in value management workshops Construction Management and Economics 25 4 435 442 10.1080/01446190601071839 Search in Google Scholar

Kelly, J., Male, S., & Graham, D. (2014). Value management of construction projects. John Wiley & Sons. KellyJ. MaleS. GrahamD. 2014 Value management of construction projects John Wiley & Sons 10.1002/9781119007258 Search in Google Scholar

Latham, M. (1994). Constructing the Team, London: HMSO. LathamM. 1994 Constructing the Team London HMSO Search in Google Scholar

Lee, S., Lee, S., & Kim, J. (2018). Evaluating the impact of defect risks in residential buildings at the occupancy phase. Sustainability, 10(12), pp. 4466. LeeS. LeeS. KimJ. 2018 Evaluating the impact of defect risks in residential buildings at the occupancy phase Sustainability 10 12 4466 10.3390/su10124466 Search in Google Scholar

Loushine, T. W., & Hoonakker, P. L. T. (2002, May). Integrated Quality and Safety Management Systems in Construction. Proceedings of the 12th Annual Construction Safety Conference, Chicago, IL, USA. LoushineT. W. HoonakkerP. L. T. 2002 May Integrated Quality and Safety Management Systems in Construction Proceedings of the 12th Annual Construction Safety Conference Chicago, IL, USA Search in Google Scholar

Love, P. E., & Edwards, D. J. (2004). Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 11(4), pp. 259–274. LoveP. E. EdwardsD. J. 2004 Determinants of rework in building construction projects Engineering, Construction and Architectural Management 11 4 259 274 10.1108/09699980410547612 Search in Google Scholar

Love, P. E., Edwards, D. J., & Smith, J. (2005). A forensic examination of the causal mechanisms of rework in a structural steel supply chain. Managerial Auditing Journal, 20, pp. 187–197. LoveP. E. EdwardsD. J. SmithJ. 2005 A forensic examination of the causal mechanisms of rework in a structural steel supply chain Managerial Auditing Journal 20 187 197 10.1108/02686900510574593 Search in Google Scholar

Love, P., Irani, Z. & Edwards, D. (2004). A rework reduction model for construction projects. IEEE Transactions on Engineering Management, 51(4), pp. 426–440. LoveP. IraniZ. EdwardsD. 2004 A rework reduction model for construction projects IEEE Transactions on Engineering Management 51 4 426 440 10.1109/TEM.2004.835092 Search in Google Scholar

Love, P. E., Li, H., & Mandal, P. (1999). Rework: A symptom of a dysfunctional supply-chain. European Journal of Purchaing & Supply Management, 5(1), pp. 1–11. LoveP. E. LiH. MandalP. 1999 Rework: A symptom of a dysfunctional supply-chain European Journal of Purchaing & Supply Management 5 1 1 11 10.1016/S0969-7012(98)00017-3 Search in Google Scholar

Mallawaarachchi, H., & Senaratne, S. (2015). Importance of quality for construction project success. In 6th International Conference on Structural Engineering and Construction Management, pp. 18–19. MallawaarachchiH. SenaratneS. 2015 Importance of quality for construction project success In 6th International Conference on Structural Engineering and Construction Management 18 19 Search in Google Scholar

Mane, P. P., & Patil, J. R. (2015). Quality management system at construction project: A questionnaire survey. Int. Journal of Engineering Research and Applications, 5(3), pp. 126–130. ManeP. P. PatilJ. R. 2015 Quality management system at construction project: A questionnaire survey Int. Journal of Engineering Research and Applications 5 3 126 130 Search in Google Scholar

Mills, A., Love, P. E., & Williams, P. (2009). Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12–16. MillsA. LoveP. E. WilliamsP. 2009 Defect costs in residential construction Journal of Construction Engineering and Management 135 1 12 16 10.1061/(ASCE)0733-9364(2009)135:1(12) Search in Google Scholar

Montague, A. (Global Construction Review, 19 September 2018). “Defects cost more than profits”: CIOB launches urgent course on quality. Available at http://www.globalconstructionreview.com/news/defects-cost-more-profits-ciob-launches-urgent-cou [Accessed on 2020 February 17]. MontagueA Global Construction Review, 19 September 2018 “Defects cost more than profits”: CIOB launches urgent course on quality Available at http://www.globalconstructionreview.com/news/defects-cost-more-profits-ciob-launches-urgent-cou [Accessed on 2020 February 17]. Search in Google Scholar

Naoum, S. G., & Mustapha, F. H. (1994). Influences of the client, designer and procurement methods on project performance. Proceedings of CIB W-92 Procurement Systems Symposium, 4–7 December, East Meets West, Department of Surveying, The University of Hong Kong, Hong Kong, pp. 221–228. NaoumS. G. MustaphaF. H. 1994 Influences of the client, designer and procurement methods on project performance Proceedings of CIB W-92 Procurement Systems Symposium 4–7 December East Meets West, Department of Surveying, The University of Hong Kong, Hong Kong 221 228 Search in Google Scholar

Ogwueleka, A.C. (2013). A review of safety and quality issues in the construction industry. Journal of Construction Engineering and Project Management, 3(3), pp. 42–48. OgwuelekaA.C. 2013 A review of safety and quality issues in the construction industry Journal of Construction Engineering and Project Management 3 3 42 48 10.6106/JCEPM.2013.3.3.042 Search in Google Scholar

Olanrewaju, A. (2012). Quantitative analysis of defects in university buildings: user' perspective. Built Environment Project and Asset Management, 2(2), pp. 167–181. OlanrewajuA. 2012 Quantitative analysis of defects in university buildings: user' perspective Built Environment Project and Asset Management 2 2 167 181 10.1108/20441241211280909 Search in Google Scholar

Olanrewaju, A. A. (2011). Practice and prospects of value management in Nigeria: VM in the Nigerian construction industry. UK: VDM Verlag. pp. 2541–2542. OlanrewajuA. A. 2011 Practice and prospects of value management in Nigeria: VM in the Nigerian construction industry UK VDM Verlag 2541 2542 Search in Google Scholar

Olanrewaju, A., Idrus, A. and Khamidi, F. M. (2011). Investigating building maintenance practices in Malaysia: a case study. Int. J. Business Excellence, 4(5), pp. 573–594. OlanrewajuA. IdrusA. KhamidiF. M. 2011 Investigating building maintenance practices in Malaysia: a case study Int. J. Business Excellence 4 5 573 594 10.1108/02630801111182420 Search in Google Scholar

Olanrewaju, A., Tan, S. Y., & Kwan, L. F. (2017). Roles of communication on performance of the construction sector. Procedia Engineering, 196, pp. 763–770. OlanrewajuA. TanS. Y. KwanL. F. 2017 Roles of communication on performance of the construction sector Procedia Engineering 196 763 770 10.1016/j.proeng.2017.08.005 Search in Google Scholar

Olanrewaju, A., Tan, Y. Y., & Soh, S. N. (2021). Defect characterisations in the Malaysian affordable housing. International Journal of Building Pathology and Adaptation. https://doi.org/10.1108/IJBPA-11-2018-0095 OlanrewajuA. TanY. Y. SohS. N. 2021 Defect characterisations in the Malaysian affordable housing International Journal of Building Pathology and Adaptation https://doi.org/10.1108/IJBPA-11-2018-0095 10.1108/IJBPA-11-2018-0095 Search in Google Scholar

Olanrewaju, A. A. (2010). Quantitative Analysis of Criteria in University Building Maintenance in Malaysia. Australasian Journal of Construction Economics and Building, 10(3), pp. 51–61. OlanrewajuA. A. 2010 Quantitative Analysis of Criteria in University Building Maintenance in Malaysia Australasian Journal of Construction Economics and Building 10 3 51 61 10.5130/AJCEB.v10i3.1681 Search in Google Scholar

Olanrewaju, A. A., Khamidi, M. F., & Idrus, A. (2011). Structures of maintenance organisations in Malaysian universities’. Int. J. Business Excellence, 4(5), pp. 573–594. OlanrewajuA. A. KhamidiM. F. IdrusA. 2011 Structures of maintenance organisations in Malaysian universities’ Int. J. Business Excellence 4 5 573 594 10.1504/IJBEX.2011.042158 Search in Google Scholar

Olanrewaju, A. L., & Abdul-Aziz, A. R. (2015). Building maintenance processes and practices: The case of a fast-developing country. Singapore: Springer. OlanrewajuA. L. Abdul-AzizA. R. 2015 Building maintenance processes and practices: The case of a fast-developing country Singapore Springer 10.1007/978-981-287-263-0 Search in Google Scholar

Olanrewaju, A. L., & Idrus, A. (2020). What is determining affordable housing shortages in the Greater Kuala Lumpur, Malaysia? Property Management, 38(1), pp. 52–81. OlanrewajuA. L. IdrusA. 2020 What is determining affordable housing shortages in the Greater Kuala Lumpur, Malaysia? Property Management 38 1 52 81 10.1108/PM-05-2019-0025 Search in Google Scholar

Onishi, M., Omoto, T., & Kobayashi, K. (2008). Defect liability in construction contracts. In Abdul Rashid, K (2008). Research in the Malaysian Construction Industry and Built Environment: Past, present and future. Kuala Lumpur: International Islamic University Malaysia. pp. 259–274. OnishiM. OmotoT. KobayashiK. 2008 Defect liability in construction contracts In Abdul RashidK (2008) Research in the Malaysian Construction Industry and Built Environment: Past, present and future Kuala Lumpur International Islamic University Malaysia 259 274 10.2208/journalip.20.137 Search in Google Scholar

Oyewobi, L. O., & Ogunsemi, D. R. (2010). Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1), pp. 1–20. OyewobiL. O. OgunsemiD. R. 2010 Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria Journal of Building Performance 1 1 1 20 Search in Google Scholar

Palaneeswaran, E. (2006). Reducing rework to enhance project performance levels. In Proceedings of the one-day Seminar on Recent Developments in Project Management in Hong Kong, pp. 5.1–5.10. PalaneeswaranE. 2006 Reducing rework to enhance project performance levels In Proceedings of the one-day Seminar on Recent Developments in Project Management in Hong Kong 5.1 5.10 Search in Google Scholar

Rahimi, Y., Tavakkoli-Moghaddam, R., Shojaie, S., & Cheraghi, I. (2017). Design of an innovative construction model for supply chain management by measuring agility and cost of quality: An empirical study. Scientia Iranica, 24(5), pp. 2515–2526. RahimiY. Tavakkoli-MoghaddamR. ShojaieS. CheraghiI. 2017 Design of an innovative construction model for supply chain management by measuring agility and cost of quality: An empirical study Scientia Iranica 24 5 2515 2526 10.24200/sci.2017.4388 Search in Google Scholar

Rhodes, B., & Smallwood, J. J. (2003). Defects and rework in South African construction projects. Proceedings of the First CIBD Post Graduate Conference, Port Elizabeth, South Africa, pp. 5–6. RhodesB. SmallwoodJ. J. 2003 Defects and rework in South African construction projects Proceedings of the First CIBD Post Graduate Conference Port Elizabeth, South Africa 5 6 Search in Google Scholar

RIBA. (2020). RIBA Plan of Work 2020. Available at www.ribaplanofwork.com. RIBA 2020 RIBA Plan of Work 2020 Available at www.ribaplanofwork.com Search in Google Scholar

RICS (Royal Institution of Chartered Surveyors, 2018 September) Modern Methods of Construction A forward-thinking solution to the housing crisis? Available at www.rics.org. [Accessed on 2019 December 05]. RICS (Royal Institution of Chartered Surveyors) 2018 September Modern Methods of Construction A forward-thinking solution to the housing crisis? Available at www.rics.org. [Accessed on 2019 December 05]. Search in Google Scholar

Rosenfeld, Y. (2009). Cost of quality versus cost of non-quality in construction: The crucial balance. Construction Management and Economics, 27(2), pp. 107–117. RosenfeldY. 2009 Cost of quality versus cost of non-quality in construction: The crucial balance Construction Management and Economics 27 2 107 117 10.1080/01446190802651744 Search in Google Scholar

Sekaran, U., & Bougie, R. (2019). Research Methods for Business: A Skill Building Approach. 8th edition. New York: John Wiley & Sons Inc. SekaranU. BougieR. 2019 Research Methods for Business: A Skill Building Approach 8th edition New York John Wiley & Sons Inc. Search in Google Scholar

Shohet, I. M., & Ciabocco, L. (2016). On-site Mobile Application for Command, Control and Communication of Safety and Quality. Creative Construction Conference. ShohetI. M. CiaboccoL. 2016 On-site Mobile Application for Command, Control and Communication of Safety and Quality Creative Construction Conference 10.24928/JC3-2017/0037 Search in Google Scholar

Simpeh, E. K., Ndihokubwayo, R., Love, P. E., & Thwala, W. D. (2015). A rework probability model: A quantitative assessment of rework occurrence in construction projects. International Journal of Construction Management, 15(2), pp. 109–116. SimpehE. K. NdihokubwayoR. LoveP. E. ThwalaW. D. 2015 A rework probability model: A quantitative assessment of rework occurrence in construction projects International Journal of Construction Management 15 2 109 116 10.1080/15623599.2015.1033814 Search in Google Scholar

Tang, S. L., Aoieong, R. T., & Ahmed, S. M. (2004). The use of Process Cost Model (PCM) for measuring quality costs of construction projects: Model testing. Construction Management and Economics, 22(3), pp. 263–275. TangS. L. AoieongR. T. AhmedS. M. 2004 The use of Process Cost Model (PCM) for measuring quality costs of construction projects: Model testing Construction Management and Economics 22 3 263 275 10.1080/0144619032000064091 Search in Google Scholar

Tawfek, H. S., Mohammed, H. E., & Abdel Razek, M. E. (2012). Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model. HBRC Journal, 8(2), pp. 132–143. TawfekH. S. MohammedH. E. Abdel RazekM. E. 2012 Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model HBRC Journal 8 2 132 143 10.1016/j.hbrcj.2012.09.009 Search in Google Scholar

United Nations Economic Commission for Europe (2021). Share of construction in GDP. Available at https://w3.unece.org/PXWeb/en/CountryRanking?IndicatorCode=8 [Accessed on 2021 February 12]. United Nations Economic Commission for Europe 2021 Share of construction in GDP Available at https://w3.unece.org/PXWeb/en/CountryRanking?IndicatorCode=8 [Accessed on 2021 February 12]. Search in Google Scholar

Walker, D.H.T. (1994). An investigation into the factors that determine building construction time performance, unpublished PhD thesis, Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia. WalkerD.H.T. 1994 An investigation into the factors that determine building construction time performance unpublished PhD thesis, Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology Melbourne, Australia Search in Google Scholar

Watt, S. D. (1994). Building Pathology: Principles and practice. Osney Mead, Oxford: Blackwell Science. WattS. D. 1994 Building Pathology: Principles and practice Osney Mead, Oxford Blackwell Science Search in Google Scholar

Wolstenholme, A., Austin, S. A., Bairstow, M., Blumenthal, A., Lorimer, J., McGuckin, S., & Guthrie, W. (2009). Never waste a good crisis: a review of progress since Rethinking Construction and thoughts for our future. Constructing Excellence. Available at: www.constructingexcellence.org.uk [Accessed 11 December 2019] WolstenholmeA. AustinS. A. BairstowM. BlumenthalA. LorimerJ. McGuckinS. GuthrieW. 2009 Never waste a good crisis: a review of progress since Rethinking Construction and thoughts for our future Constructing Excellence Available at: www.constructingexcellence.org.uk [Accessed 11 December 2019] Search in Google Scholar

Yap, J. B. H., Low, P. L., & Wang, C. (2017). Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591–618. YapJ. B. H. LowP. L. WangC. 2017 Rework in Malaysian building construction: Impacts, causes and potential solutions Journal of Engineering, Design and Technology 15 5 591 618 10.1108/JEDT-01-2017-0002 Search in Google Scholar

Yatim, M. H., & Zakaria, S. A. (2008). The application of quality control in construction industry-a case study on customer satisfaction in housing projects. In Abdul Rashid, K (2008). Research in the Malaysian Construction Industry and Built Environment: Past, present and future, Kuala Lumpur: International Islamic University Malaysia, pp. 165–179. YatimM. H. ZakariaS. A. 2008 The application of quality control in construction industry-a case study on customer satisfaction in housing projects In Abdul RashidK (2008) Research in the Malaysian Construction Industry and Built Environment: Past, present and future Kuala Lumpur International Islamic University Malaysia 165 179 Search in Google Scholar

eISSN:
1847-6228
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Engineering, Introductions and Overviews, other