Cite

Adedokun, O., & Egbelakin, T. (2022). Structural equation modelling of risk factors influencing the success of building projects. Journal of Facilities Management, 1472–5967. https://doi.org/10.1108/JFM-01-2022-0002 Search in Google Scholar

Ajayi, B. O., & Chinda, T. (2022). Impact of construction delay-controlling parameters on project schedule: DEMATEL-system dynamics modeling approach. Frontiers in Built Environment, 8, Article 799314. https://doi.org/10.3389/fbuil.2022.799314 Search in Google Scholar

Akomah, B. B., Mustapha, Z., & Mensah, J. W. (2018). Cost impacts of variations on building construction projects. MOJ Civil Engineering, 4(5), 386–392. https://doi.org/10.15406/mojce.2018.04.00133 Search in Google Scholar

Akomah, B. B., Zakari, M., & Enoch Ayeh, E. (2020a). Impact of cost of construction projects in Cape Coast metropolis. Buletinul Institutului Politehnic Din Iaşi, 66(1), 95–112. Search in Google Scholar

Akomah, B. B., Mustapha, Z., & Ofosu, E. K. (2020b). Contractors’ commitment to early completion of projects. Australian Journal of Science & Technology, 4(2), 283–288. https://www.researchgate.net/publication/343008004_Contractors’_commitment_to_early_completion_of_projects Search in Google Scholar

Alkhalifah, S. J., Tuffaha, F. M., Al Hadidi, L. A., & Ghaithan, A. (2023). Factors influencing change orders in oil and gas construction projects in Saudi Arabia. Built Environment Project and Asset Management, 13(3), 430–452. https://doi.org/10.1108/BEPAM-06-2022-0081 Search in Google Scholar

Al-Kofahi, Z. G., Mahdavian, A., & Oloufa, A. (2022). System dynamics modeling approach to quantify change orders impact on labour productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), 1355–1366. https://doi.org/10.1080/15623599.2020.1711494 Search in Google Scholar

Alshboul, O., Alzubaidi, M. A., Mamlook, R. E. A., Almasabha, G., Almuflih, A. S., & Shehadeh, A. (2022). Forecasting liquidated damages via machine learning-based modified regression models for highway construction projects. Sustainability, 14(10), Article 5835. https://doi.org/10.3390/su14105835 Search in Google Scholar

Altaf, M., Musarat, M. A., Khan, A., Shoukat, Z., & Salahuddin, U. (2020). Change order impact on construction industry of Pakistan. In F.M. Nazri (Ed.), Proceedings of AICCE’19. AICCE 2019. Lecture Notes in Civil Engineering, 53 (pp. 391–402). Springer International Publishing. https://doi.org/10.1007/978-3-030-32816-0_25 Search in Google Scholar

Amoatey, C. T., & Anson, B. A. (2017). Investigating the major causes of scope creep in real estate construction projects in Ghana. Journal of Facilities Management, 15(4), 393–408. https://doi.org/10.1108/JFM-11-2016-0052 Search in Google Scholar

Anderson, J. E., Moyer, J., & Chichirau, G. (2022). Public policymaking. Cengage Learning. Asadi, R., Wilkinson, S., & Rotimi, J. O. B. (2023). The common causes of rework in construction contracts: a diagnostic approach. Journal of Engineering, Design and Technology, 21(4), 1107–1133. https://doi.org/10.1108/JEDT-04-2021-0215 Search in Google Scholar

Asamoah, R. O., & Offei-Nyako, K. (2013). Variation determinants in building construction: Ghanaian professionals’ perspective. KICEM Journal of Construction Engineering and Project Management, 3(4), 20–25. https://doi.org/10.6106/JCEPM.2013.3.4.020 Search in Google Scholar

Assaad, R. H., Ahmed, M. O., El-Adaway, I. H., & Shrestha, P. P. (2021). Management of change orders in infrastructure transportation projects. Practice Periodical on Structural Design and Construction, 27(1), Article 05021006. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000640 Search in Google Scholar

Desyardi, H., Latief, Y., & Soepandji, B. S. (2019). Guidelines for effective variation order determination strategy. IOP Conference Series: Earth and Environmental Science, 258(2019), Article 012030. https://doi.org/10.1088/1755-1315/258/1/012030 Search in Google Scholar

Diyagama, D., Victar, H. C., Waidyasekara, A. S., & Rameezdeen, R. (2023). Managing external stakeholders influences in mega construction projects. International Journal of Construction Management, 1–11. https://doi.org/10.1080/15623599.2023.2215109 Search in Google Scholar

Dosumu, O. S., & Aigbavboa, C. O. (2017). Impact of design errors on variation cost of selected building project in Nigeria. Procedia Engineering, 196, 847–856. https://doi.org/10.1016/j.proeng.2017.08.016 Search in Google Scholar

Duguay, R., Rauter, T., & Samuels, D. (2023). The impact of open data on public procurement. Journal of Accounting Research, 61(4), 1159–1224. https://doi.org/10.1111/1475-679X.12479 Search in Google Scholar

Eldeep, A. M., Farag, M. A., & Abd El-Hafez, L. M. (2022). Using BIM as a lean management tool in construction processes – A case study. Ain Shams Engineering Journal, 13(2), Article 101556. https://doi.org/10.1016/j.asej.2021.07.009 Search in Google Scholar

Genc, O. (2023). Identifying principal risk factors in Turkish construction sector according to their probability of occurrences: A relative importance index (RII) and exploratory factor analysis (EFA) approach. International Journal of Construction Management, 23(6), 979–987. https://doi.org/10.1080/15623599.2021.1946901 Search in Google Scholar

Ghaleb, H., Alhajlah, H. H., Bin Abdullah, A. A., Kassem, M. A., & Al-Sharafi, M. A. (2022). A scientometric analysis and systematic literature review for construction project complexity. Buildings, 12(4), Article 482. https://doi.org/10.3390/buildings12040482 Search in Google Scholar

Haile, G. (2022). Causes of change orders and their impact on construction cost: The case of Addis Ababa Design and Construction Works Bureau [Doctoral dissertation, St. Mary’s University]. Search in Google Scholar

Hansen, S., Fassa, F., & Wijaya, S. (2023). Factors influencing scheduling activities of construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(1), Article 06522004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000594 Search in Google Scholar

Kermanshachi, S., & Pamidimukkala, A. (2023). Uncertainty analysis of key schedule performance indicators in design, procurement, and construction phases of heavy industrial projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(1), Article 04522042. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000588 Search in Google Scholar

Koushki, P. A., Al-Rashid, K., & Kartam, N. (2005). Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), 285–294. https://doi.org/10.1080/0144619042000326710 Search in Google Scholar

Love, P. E., Irani, Z., Smith, J., Regan, M., & Liu, J. (2017). Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Production Planning & Control, 28(13), 1081–1092. https://doi.org/10.1080/09537287.2017.1333647 Search in Google Scholar

Mahmoud, H., Ahmed, V., & Beheiry, S. (2021). Construction cash flow risk index. Journal of Risk and Financial Management, 14(6), Article 269. https://doi.org/10.3390/jrfm14060269 Search in Google Scholar

Mishmish, M., & El-Sayegh, S. M. (2018). Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), 26–33. https://doi.org/10.1080/15623599.2016.1230959 Search in Google Scholar

Mishra, K., & Aithal, P. S. (2022). Causes and effects of design change of construction projects. International Journal of Applied Engineering and Management Letters (IJAEML), 6(1), 87–99. https://doi.org/10.5281/zenodo.6085346 Search in Google Scholar

Myburgh, K. S. (2018). The minimum site investigation requirements needed to define site conditions considering the results of ground investigations and its true reflection of actual site conditions found during construction [Doctoral dissertation, Stellenbosch: Stellenbosch University]. https://core.ac.uk/download/pdf/188224806.pdf Search in Google Scholar

Naji, K. K., Gunduz, M., & Naser, A. F. (2022). The effect of change-order management factors on construction project success: A structural equation modelling approach. Journal of Construction Engineering and Management, 148(9), Article 04022085. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002350 Search in Google Scholar

Oluwatuyi, O. E., Ng, K. W., Wulff, S. S., & Rajapakshage, R. (2023). Optimal site investigation through combined geological and property uncertainties analysis. Geotechnical and Geological Engineering, 41(4), 2377–2393. https://doi.org/10.1007/s10706-023-02403-x Search in Google Scholar

Padala, S. S., & Maheswari, J. U. (2023). Modelling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), 2369–2390. https://doi.org/10.6084/m9.figshare.19584091.v1 Search in Google Scholar

Partner ESI. (2019). Geotechnical investigations. https://www.partneresi.com/services/geotechnical-investigations Search in Google Scholar

Paul, A., & Uma Maheswari, J. (2023). Modelling changes in MDM: Case study of irrigation pipeline project. In A. Chakrabarti, & V. Singh (Eds.), Design in the Era of Industry 4.0, Volume 3. ICORD 2023. Smart Innovation, Systems and Technologies, 346 (pp. 1203–1217). Springer Nature Singapore. https://doi.org/10.1007/978-981-99-0428-0_98 Search in Google Scholar

Pham, T. (2023). Risk identification and mitigation in data analytics outsourcing: the vendor’s perspective [Master’s thesis, LUT University]. https://lutpub.lut.fi/bitstream/10024/166021/1/mastersthesis_pham_tran.pdf Search in Google Scholar

Rakasiwi, G. (2023). Analysis of factors causing contract change orders (CCO) in the construction project of the city furniture center building in Surakarta. International Research Journal of Innovations in Engineering and Technology, 7(4), Article 78. https://irjiet.com/common_src/article_file/1682345424_74cf2960a8_7_irjiet.pdf Search in Google Scholar

Robles, J. (2023). Fast-track projects with cost and schedule overruns a supply chain management perspective [Doctoral dissertation, Capella University]. Search in Google Scholar

Rosenberg, L., Mosthaf, K., Broholm, M. M., Fjordbøge, A. S., Tuxen, N., Kerrn-Jespersen, I. H., Rønde, V., & Bjerg, P. L. (2023). A novel concept for estimating the contaminant mass discharge of chlorinated ethenes emanating from clay till sites. Journal of Contaminant Hydrology, 252, Article 104121. https://doi.org/10.1016/j.jconhyd.2022.104121 Search in Google Scholar

Rossi, J. (2023). Improving customer change order management–creating more value through customer centricity and professional change order management. Case: ABB Oy induction machines [Master’s thesis, University of Vaasa]. Search in Google Scholar

Sanchez-Garrido, A. J., Navarro, I. J., & Yepes, V. (2022). Multi-criteria decision-making applied to the sustainability of building structures based on Modern Methods of Construction. Journal of Cleaner Production, 330, Article 129724. https://doi.org/10.1016/j.jclepro.2021.129724 Search in Google Scholar

Shabani Ardakani, S., & Nik-Bakht, M. (2021). Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1), Article 04020155. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001974 Search in Google Scholar

Shoar, S., Yiu, T. W., Payan, S., & Parchamijalal, M. (2023). Modelling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective. Engineering, Construction and Architectural Management, 30(2), 365–392. https://doi.org/10.1108/ECAM-08-2021-0732 Search in Google Scholar

Shrestha, K., Shrestha, P. P., & Lohoud, M. (2023). Critical factors affecting the bid cost of building construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(3), Article 04523018. https://doi.org/10.3390/buildings12060849 Search in Google Scholar

Sing, M. C., Edwards, D. J., Leung, A. W., Liu, H., & Roberts, C. J. (2022). A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques. Engineering, Construction and Architectural Management, 29(9), 3754–3774. https://doi.org/10.1108/ECAM-09-2020-0726 Search in Google Scholar

Smith, J., Edwards, D. J., Martek, I., Chileshe, N., Hayhow, S., & Roberts, C. J. (2023). The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), 655–689. https://doi.org/10.1108/JEDT-12-2020-0507 Search in Google Scholar

Tariq, J., & Gardezi, S. S. S. (2023). Study the delays and conflicts for construction projects and their mutual relationship: A review. Ain Shams Engineering Journal, 14(1), Article 101815. https://doi.org/10.1016/j.asej.2022.101815 Search in Google Scholar

Tiew, S. Y., Hashim, H. A., & Zolkafli, U. K. B. (2022). Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), 29–43. https://doi.org/10.15641/jcbm.5.2.1253 Search in Google Scholar

Tomh, M. A. (2022). Investigating the factors affecting the design change in construction industry in UAE. International Journal for Global Academic & Scientific Research, 1(4), 60–73. https://doi.org/10.55938/ijgasr.v1i4.32 Search in Google Scholar

Umuhoza, E., Bitamba, B. F., & An, S. H. (2023). Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, 23(7), 1264–1275. https://doi.org/10.1080/15623599.2021.1967576 Search in Google Scholar

Wang, J., Zhang, S., Fenn, P., Luo, X., Liu, Y., & Zhao, L. (2023a). Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development. Journal of Construction Engineering and Management, 149(1), Article 03122010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002419 Search in Google Scholar

Wang, J., Zhang, S., Jin, R., Fenn, P., Yu, D., & Zhao, L. (2023b). Identifying critical dispute causes in the construction industry: A cross-regional comparative study between China and the UK. Journal of Management in Engineering, 39(2), Article 04022072. https://doi.org/10.1061/JMENEA.MEENG-4943 Search in Google Scholar

Yap, J. B. H., Lim, B. L., Skitmore, M., & Gray, J. (2022). Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), 800–822. https://doi.org/10.1108/JEDT-10-2020-0413 Search in Google Scholar

Zhao, Y., Chen, W., Arashpour, M., Yang, Z., Shao, C., & Li, C. (2022). Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), 1753–1776. https://doi.org/10.1108/ECAM-12-2020-1050 Search in Google Scholar

Zhong, S., Elhegazy, H., & Elzarka, H. (2022). Key factors affecting the decision-making process for buildings projects in Egypt. Ain Shams Engineering Journal, 13(3), Article 101597. https://doi.org/10.1016/j.asej.2021.09.024 Search in Google Scholar