Open Access

Engineering project management based on multiple regression equation and building information modelling technology


Cite

To realise the optimisation of Building Information Modelling (BIM) technical engineering project management, the paper conducts data investigation and analysis of the technical problem which deals with a specific power grid tunnel construction. This article uses BIM to sample considerable data information for the construction and management of power grid tunnels. According to the geological factors of rock strength in construction, the fuzzy information fusion method is used to carry out the feature fusion and adaptive scheduling of management information. We will extract the characteristics of each surrounding rock category's geological BIM information association rules and use the multiple regression analysis methods to carry out the BIM information fusion and adaptive scheduling of the tunnel construction project management. The study results confirm the conclusion that the predicted scores are in good agreement with the geological scores on site.

eISSN:
2444-8656
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Life Sciences, other, Mathematics, Applied Mathematics, General Mathematics, Physics