[[1] Alzubaidi H. J.: Maintenance modelling of a major hospital complex, PhD thesis, University of Salford, Salford 1993.]Search in Google Scholar
[[2] Andrawus J. A., Watson J., Kishk M.: Wind turbine maintenance optimisation: principles of quantitative maintenance optimization, International Journal of Wind Engineering, 31 (2), pp. 101-110, 2007.10.1260/030952407781494467]Search in Google Scholar
[[3] Baker R. D., Christer A. H.: Review of delay-time OR modelling of engineering aspects of maintenance, European Journal of Operational Research, 73, pp. 407-422, 1994.10.1016/0377-2217(94)90234-8]Search in Google Scholar
[[4] Baker R. D., Wang W.: Estimating the delay-time distribution of faults in repairable machinery from failure data, IMA Journal of Mathematics Applied in Business & Industry, 3, pp. 259-281, 1992.10.1093/imaman/3.4.259]Search in Google Scholar
[[5] Ben-Daya M., Duffuaa S. O., Raouf A.: Handbook of Maintenance Management and Engineering, Springer, London, 2009.10.1007/978-1-84882-472-0]Search in Google Scholar
[[6] Cho I. D., Parlar M.: A survey of maintenance models for multi-unit systems, European Journal of Operational Research, 51, pp. 1-23, 1991.10.1016/0377-2217(91)90141-H]Search in Google Scholar
[[7] Christer A. H.: A Review of Delay Time Analysis for Modelling Plant Maintenance, in: Stochastic Models in Reliability and Maintenance, Osaki S. (ed.), Springer, 2002.10.1007/978-3-540-24808-8_4]Search in Google Scholar
[[8] Christer A. H.: Developments in delay time analysis for modelling plant maintenance, Journal of the Operational Research Society, 50, pp. 1120-1137, 1999.10.1057/palgrave.jors.2600837]Search in Google Scholar
[[9] Christer A. H.: Delay-time model of reliability of equipment subject to inspection monitoring, Journal of the Operational Research Society, Vol. 38, No. 4, pp. 329-334, 1987.10.1057/jors.1987.54]Search in Google Scholar
[[10] Christer A. H.: Modelling inspection policies for building maintenance, Journal of the Operational Research Society, Vol. 33, pp. 723-732, 1982.10.1057/jors.1982.161]Search in Google Scholar
[[11] Christer A. H., Redmond D. F.: Revising models of maintenance and inspection, International Journal of Production Economics, 24, pp. 227-234, 1992.10.1016/0925-5273(92)90134-S]Search in Google Scholar
[[12] Christer A. H., Redmond D. F.: A recent mathematical development in maintenance theory, IMA Journal of Mathematics Applied in Business and Industry, 2, pp. 97-108, 1990.10.1093/imaman/2.2.97]Search in Google Scholar
[[13] Christer A. H., Waller W. M.: Delay Time Models of Industrial Inspection Maintenance Problems, Journal of the Operational Research Society, Vol. 35, No. 5, pp. 401-406, 1984.10.1057/jors.1984.80]Search in Google Scholar
[[14] Christer A. H., Waller W. M.: An operational research approach to planned maintenance: modelling P.M. for a vehicle fleet, Journal of the Operational Research Society, Vol. 35, No. 11, pp. 967-984, 1984b.10.1057/jors.1984.193]Search in Google Scholar
[[15] Christer A.H, Wang W.: A delay-time-based maintenance model of a multicomponent system, IMA Journal of Mathematics Applied in Business & Industry, 6, pp. 205-222, 1995a.10.1093/imaman/6.2.205]Search in Google Scholar
[[16] Christer A. H, Wang W., Baker R., Sharp J.: Modelling maintenance practice of production plant using delay-time concept, IMA Journal of Mathematics Applied in Business and Industry, Vol. 6, pp. 67- 84, 1995.10.1093/imaman/6.1.67]Search in Google Scholar
[[17] Christer A. H., Whitelaw J.: An operational research approach to breakdown maintenance: problem recognition, Journal of the Operational Research Society, Vol. 34, No. 11, pp. 1041-1052, 1983.]Search in Google Scholar
[[18] Cunningham A., Wang W., Zio E., Allanson D., Wall A., Wang J.: Application of Delay-Time Analysis via Monte Carlo Simulation, Journal of Marine Engineering and Technology, Vol. 10, No. 3, pp. 57-72, 2011.10.1080/20464177.2011.11020252]Search in Google Scholar
[[19] Das A. N., Sarmah S. P.: Preventive replacement models: an overview and their application in process industries, European Journal of Industrial Engineering, Vol. 4, No. 3, pp. 280-307, 2010.10.1504/EJIE.2010.033332]Search in Google Scholar
[[20] Dekker R., Scarf P. A.: On the impact of optimisation models in maintenance decision making: the state of the art, Reliability Engineering and System Safety, 60, pp. 111-119, 1998.10.1016/S0951-8320(98)83004-4]Search in Google Scholar
[[21] Guo R., Ascher H., Love E.: Towards practical and synthetical modelling of repairable systems, Economic Quality Control, Vol. 16, No. 2, pp. 147-182, 2001.10.1515/EQC.2001.147]Search in Google Scholar
[[22] Guo R., Ascher H., Love E.: Generalized models of repairable systems a survey via stochastic processes formalism, ORiON, Vol. 16, No. 2, pp. 87-128, 2000.10.5784/16-2-406]Search in Google Scholar
[[23] Jing C., Lei Z.: A Delay-Time model with imperfect inspection for aircraft structure subject to a finite time horizon, IEEE International Conference on Grey Systems and Intelligent Services (GSIS), pp. 716-719, 2011.]Search in Google Scholar
[[24] Jodejko-Pietruczuk A., Werbińska-Wojciechowska S.: Economical effectiveness of Delay Time approach using in Time-Based maintenance modelling, Proc. of PSAM 11 & ESREL 2012 Conference, 25-29 June 2012, Helsinki, Finland.]Search in Google Scholar
[[25] Jodejko-Pietruczuk A., Werbińska-Wojciechowska S.: Analysis of Block- Inspection Policy parameters from economical and availability point of view, Proc. of PSAM 11 & ESREL 2012 Conference, 25-29 June 2012, Helsinki, Finland.]Search in Google Scholar
[[26] Jodejko-Pietruczuk A., Werbińska-Wojciechowska S.: Influence of delay time parameter estimation on Block Inspection Policy economical and reliability results, article prepared for ACME Journal.]Search in Google Scholar
[[27] Kobbacy K. A. H., Murthy D. N. P.: Complex System Maintenance Handbook, Springer, 2008.]Search in Google Scholar
[[28] Lee Ch.: Applications of Delay Time Theory to Maintenance Practice of Complex Plant, PhD thesis, University of Salford, Salford, 1999.]Search in Google Scholar
[[29] Mazzuchi T. A., van Noortwijk J. M., Kallen M. J.: Maintenance optimization, Technical Report, TR-2007-9, 2007.10.1002/9780470061572.eqr109]Search in Google Scholar
[[30] Nowakowski T., Werbińska-Wojciechowska S.: Developments of time dependencies modeling concepts, Advances in safety, reliability and risk management. Proc. of the European Safety and Reliability Conference, ESREL 2011, Troyes, France, 18-22 September 2011/ eds. Bérenguer Ch., Gral A.l, Guedes Soares C., Leiden: CRC Press/Balkema, pp. 832-838, 2012.]Search in Google Scholar
[[31] Okumura S.: An Inspection Policy for Deteriorating Processes Using Delay- Time Concept, International Transactions in Operational Research, Vol. 4, Issue 5-6, pp. 365-375, 1997.10.1111/j.1475-3995.1997.tb00092.x]Search in Google Scholar
[[32] Ozekici S. (ed.): Reliability and Maintenance of Complex Systems, NATO ASI Series, Series F: Computer and Systems Sciences, Vol. 154, Springer, 1996.]Search in Google Scholar
[[33] Redmond D. F.: Delay Time Analysis in Maintenance, PhD thesis, University of Salford, Salford, 1997.]Search in Google Scholar
[[34] Sarkar A., Panja S. Ch., Sarkar B.: Survey of maintenance policies for the Last 50 Years, International Journal of Software Engineering and Applications, Vol. 2, no. 3, pp. 130-148, 2011.10.5121/ijsea.2011.2310]Search in Google Scholar
[[35] Thomas L. C.: A survey of maintenance and replacement models for maintainability and reliability of multi-item systems, Reliability Engineering, 16, pp. 297-309, 1986.10.1016/0143-8174(86)90099-5]Search in Google Scholar
[[36] Valdez-Flores C., Feldman R.: A survey of preventive maintenance models for stochastically deteriorating single-unit systems, Naval Research Logistics Vol. 36, pp. 419-446, 1989.10.1002/1520-6750(198908)36:4<419::AID-NAV3220360407>3.0.CO;2-5]Search in Google Scholar
[[37] Wang W.: An overview of the recent advances in delay-time-based maintenance modelling, Reliability Engineering and System Safety, 106, pp. 165-178, 2012.10.1016/j.ress.2012.04.004]Search in Google Scholar
[[38] Wang L., Hu H., Wang Y., Wu W., He P.: The availability model and parameters estimation method for the delay time model with imperfect maintenance at inspection, Applied Mathematical Modelling, Vol. 35, pp. 2855-2863, 2011.]Search in Google Scholar
[[39] Wang W.: An inspection model for a process with two types of inspections and repairs, Reliability Engineering and System Safety, Vol. 94, pp. 526-533, 2009.10.1016/j.ress.2008.06.010]Search in Google Scholar
[[40] Wen-Yuan L.V., Wang W.: Modelling preventive maintenance of production plant given estimated PM data and actual failure times, Proc. of International Conference on Management Science and Engineering ICMSE’06, Lille, 2006.10.1109/ICMSE.2006.313857]Search in Google Scholar
[[41] Werbińska-Wojciechowska S.: Problems of logistics systems modelling with the use of DTA approach, Logistics and Transport, Vol. 2, pp. 63-74, 2012.]Search in Google Scholar
[[42] Zhao J., Chan A. H. C., Roberts C., Madelin K. B.: Reliability evaluation and optimisation of imperfect inspections for a component with multidefects, Reliability Engineering and Systems Safety, Vol. 92, pp. 65-73, 2007. 10.1016/j.ress.2005.11.003]Search in Google Scholar