[Adewuyi, T. O., & Otali, M. (2013). Evaluation of causes of construction material waste-case of Rivers State, Nigeria. Ethiopian Journal of Environmental Studies and Management, 6, 746-753.10.4314/ejesm.v6i6.5S]Search in Google Scholar
[Alarcon, L. F. (1994). Tools for the identification and reduction of waste in construction projects. Journal of Lean Construction, 365-377.]Search in Google Scholar
[Al-Hajj, A., & Hamani, K. (2011). Material waste in the UAE construction industry: main causes and minimization practices. Architectural Engineering and Design Management, 7, 221-235.10.1080/17452007.2011.594576]Search in Google Scholar
[Alwi, S., Hampson, K., & Mohamed, S. (2002, November 11-13). Waste in the Indonesian construction projects. In Proceedings of the 1st International Conferences of CIB W107 - Creating a Sustainable Construction Industry in Developing Countries, Stellenbosch, South Africa, 23, 541-549.]Search in Google Scholar
[Begum, R. A., Satari, S. K., & Pereira, J. J. (2010). Waste generation and recycling: comparison of conventional and industrialized building systems. American Journal of Environmental Sciences, 6(4), 383-388.10.3844/ajessp.2010.383.388]Search in Google Scholar
[Burns, A. (2009). Action research in second language teacher education. In Burns, A., & Richards, J. C. (Eds), The Cambridge guide to research in language teaching and learning. Cambridge: Cambridge University Press.]Search in Google Scholar
[Chen, J., & Bell, P. C. (2011). Coordinating a decentralized supply chain with customer returns and price-dependent stochastic demand using a buyback policy. European Journal of Operational Research, 212(2), 293-300.10.1016/j.ejor.2011.01.036]Search in Google Scholar
[Chukwu, D. U., Anaele, E. A., Omeje, H. O., & Ohanu, I. B. (2019). Adopting green building constructions in developingcountries through capacity building strategy: Survey of Enugu State, Nigeria. Sustainable Buildings, 4(4), 1-13.]Search in Google Scholar
[Commonwealth of Australia (2009). Living sustainability. Retrieved from https://www.iau-hesd.net/sites/default/files/documents/2009__living_sustainably_the_australian_governments_national_action_plan_for_education_for_sustainability_fr.pdf]Search in Google Scholar
[Dahiru, D., Dania, A. A., & Adejoh, A. (2014). An investigation into the prospects of green building practice in Nigeria. Journal of Sustainable Development, 7(6), 158-163.10.5539/jsd.v7n6p158]Search in Google Scholar
[Desa, A., Kadir, N. A., & Yusooff, F. (2012). Environmental awareness and education: A key approach to Solid Waste Management (SWM) - a case study of a University in Malaysia. Intech Open. doi.org/10.5772/4816910.5772/48169]Search in Google Scholar
[Ekanayake, L. L., & Ofori, G. (2004). Building waste assessment score: design-based tool. Building and Environment, 39, 851-861.10.1016/j.buildenv.2004.01.007]Search in Google Scholar
[Fadiya, O. O., Georgakis, P., & Chinyio, E. (2014). Quantitative analysis of the sources of construction waste. Journal of Construction Engineering, 1-9.10.1155/2014/651060]Search in Google Scholar
[Faniran, O. O., & Caban, G. (1998). Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(2), 182-188.10.1108/eb021073]Search in Google Scholar
[Federal Government of Nigeria (2013). National policy on education (5th ed.). Abuja: Ministry of Education.]Search in Google Scholar
[Fedosejeva, J., Boče, A., Romanova, M., Iliško, Dz., & Ivanova, O. (2009). Education for sustainable development: The choice of pedagogical approaches and methods for the implementation of pedagogical tasks in the Anthropocene age. Journal of Teacher Education for Sustainability, 20(1), 157-179.10.2478/jtes-2018-0010]Search in Google Scholar
[Ferguson, J. (1995). Managing and minimizing construction waste: A practical guide. London: Institute of Civil Engineers.]Search in Google Scholar
[Ferrance, E. (2000). Action Research. Retrieved from https://www.brown.edu/academics/education-alliance/sites/brown.edu.academics.education-alliance/files/publications/act_research.pdf]Search in Google Scholar
[GOVHK (2018). Construction Waste. Retrieved from https://www.gov.hk/en/residents/environment/waste/constructionwaste.htm]Search in Google Scholar
[Han, S., Lee, S., & Peńa-Mora, F. (2012). Identification and quantification of non-value-addingeffort from errors and changes in design andconstruction projects. Journal of Construction Engineering and Management, 138, 98-109. doi: 10.1061/(ASCE)CO.1943-7862.000040610.1061/(ASCE)CO.1943-7862.0000406]Search in Google Scholar
[Han, Z., Duan, Q., Fei, Y., Zeng, D., Shi, G., Li, H., & Hu, M. (2018). Factors that influence public awareness of domestic waste characteristics and management in rural areas. Integrated Environmental Assessment and Management. Environmental Management, 14(3), 395-406. doi: 10.1002/ieam.403310.1002/ieam.4033]Search in Google Scholar
[Health and Safety Executives [HSE] (2019). Materials storage and waste management. Retrieved from https://www.hse.gov.uk/construction/safetytopics/storage.htm]Search in Google Scholar
[HEC - Global Learning (2009). Sustainable development. Retrieved from http://www.hec.fr/var/fre/storage/original/application]Search in Google Scholar
[Huanga, B., Wanga, X., Kua, H., Geng, Y., Bleischwitz, R., & Ren, J. (2018). Construction and demolition waste management in China through the 3R principle. Resources, Conservation & Recycling, 129, 36-44. Retrieved from http://dx.doi.org/10.1016/j.resconrec.2017.09.02910.1016/j.resconrec.2017.09.029]Search in Google Scholar
[Katherine, T. A. (2017). Circular economy in construction: current awareness, challenges and enablers. Institutional Civil Engineering, 170, 15-24.]Search in Google Scholar
[Katz, A., & Baum, H. (2011). A novel methodology to estimate the evolution of construction waste in construction sites. Journal of Waste Management, 31, 353-358.10.1016/j.wasman.2010.01.008]Search in Google Scholar
[Kibert, C. J. (2013). Sustainable construction: Green building design and delivery. New Jersey: John Wiley & Son Inc.]Search in Google Scholar
[Llatas, C. (2011). A model for quantifying constructionwaste in projects according to the European wastelist. Journal of waste management, 3, 1261-1276.10.1016/j.wasman.2011.01.023]Search in Google Scholar
[Luangcharoenrat, C., Intrachooto, S., Peansupap, V., & Sutthinarakorn, S. (2019). Factors influencing constructionwaste generation inbuilding construction: Thailand’s perspective. Sustainability, 11, 3638. doi:10.3390/su1113363810.3390/su11133638]Search in Google Scholar
[Ma, U. (2011). No waste: Managing sustainability in construction. UK: Gower Publishing Ltd.]Search in Google Scholar
[Maddox, P., Doran, C., Williams, I. D., & Kus, M. (2011). The role of intergenerational influencein waste education programmes: The THAW project. Waste Management, 31, 2590-2600.10.1016/j.wasman.2011.07.023]Search in Google Scholar
[Mbote, R. P., Kimtai, A. K., & Makworo, M. (2016). An investigation on the influence of factors causing materialwasteon construction cost of residential building frame: A case of northern region of Nairobi. International Journal of Engineering Research & Technology (IJERT), 5, 436-447.]Search in Google Scholar
[Meneses, G. D., & Palacio, A. B. (2005). Recycling behavior: A multidimensional approach. Environmental Behaviour, 37, 837-60.10.1177/0013916505276742]Search in Google Scholar
[Merino, M. R., Gracia, P. I., & Azevedo, I. S. W. (2010). Sustainable construction: Construction and demolition waste reconsidered. Waste Management & Research, 28, 118-129. doi: 10.1177/073424X09103841]Search in Google Scholar
[Muhwezi, L., Chamuriho, L. M., & Lema, N. M. (2012). An investigation into materials wastes on building construction projects in Kampala-Uganda. Journal of Engineering Research, 1, 11-18.]Search in Google Scholar
[Nagapan, S., Rahman, I. A., & Asmi, A. (2012). Factors contributing to physical and non-physical waste generation in construction industry. International Journal of Advances in Applied Sciences (IJAAS), 1(1), 1-10.10.11591/ijaas.v1i1.476]Search in Google Scholar
[Nixon, H., & Saphores, J. D. M. (2009). Information and the decision to recycle: Results from a survey of US households. Journal of Environmental Planning and Management, 52, 257-77.10.1080/09640560802666610]Search in Google Scholar
[Nunnally, J. C. (1978). Psychometric Theory. New York: McGraw-Hill.]Search in Google Scholar
[Osmani, M., Glass, J., & Price A. D. F. (2008). Architects’ perspectives on construction waste reduction bydesign. Journal of Waste Management, 28, 1147-1158.10.1016/j.wasman.2007.05.011]Search in Google Scholar
[Osmani, M., Price, A., & Glass, J. (2006). Architect and contractor attitudes to waste minimization. Proceedings of the Institution of Civil Engineers - Waste and Resource Management, 159(2), 65-72.10.1680/warm.2006.159.2.65]Search in Google Scholar
[Peng, C. L., Domenic, E. S., & Charles, J. K. (1997). Strategies for successful construction anddemolition waste recycling operations. Construction Management and Economics, 15(1), 49-58.10.1080/014461997373105]Search in Google Scholar
[Poon, C. S. (2007). Reducing construction waste. Journal of Waste Management, 27, 1715-1716.10.1016/j.wasman.2007.08.013]Search in Google Scholar
[Salīte, I. (2008). Educational action research for sustainability: Constructing a vision for the future in teacher education. Journal of Teacher Education for Sustainability, 10, 5-16.10.2478/v10099-009-0021-6]Search in Google Scholar
[Salīte, I. (2015). Searching for sustainability in teacher education and educational research: Experiences from the Baltic and Black Sea Circle Consortium for educational research. Discourse and Communication for Sustainable Education, 6, 21-29.10.1515/dcse-2015-0002]Search in Google Scholar
[Santos, J. R. A. (1999). Cronbach’s alpha: A tool for assessing the reliability of scales. Journal of Extension, 37(2), 1-5.]Search in Google Scholar
[Setiawan, R. P. (2020). Factors determining the public receptivityregarding waste sorting: A case study inSurabaya city, Indonesia. Sustainable Environment Research, 30(1), 1-8. doi: 10.1186/s42834-019-0042-310.1186/s42834-019-0042-3]Search in Google Scholar
[Siew, R. (2019). Are we ready for circular economy? Towards zero waste in construction. Sustainable Building, 4(2), 1-5.10.1051/sbuild/2019002]Search in Google Scholar
[Teo, M. M., & Loosemore, M. (2001). A theory of waste behaviour in the construction industry. Construction Management and Economics, 19(7), 741-751. doi: 10.1080/0144619011006703710.1080/01446190110067037]Search in Google Scholar
[United Nations (1992). Earth Summit: UN conference on environment and development. Retrieved from www.un.org/geninfo/bp/enviro.html]Search in Google Scholar
[UNESCO (2014). World conference Education for Sustainable Development: What is ESD? Retrieved from http://www.unesco.org/new/en/unesco-world-conference-onesd-2014/resources/what-is-esd/]Search in Google Scholar
[US Department of Labour (n.d.). Occupational Safety and Health Administration: Materials handling and storage. Retrieved from https://www.osha.gov/Publications/OSHA2236/osha2236.html]Search in Google Scholar
[Vining, J., & Ebreo, A. (1990). What makes a recycler? A comparison of recyclers and non-recyclers. Environment and Behaviour, 22, 55-73.10.1177/0013916590221003]Search in Google Scholar
[Wahab, A. B., & Lawal, A. F. (2011). An evaluation ofwaste control measures in construction industry in Nigeria. African Journal of Environmental Science and Technology, 5, 246-254.]Search in Google Scholar
[Wan, S. K., Kumaraswamy, M. M., & Liu, D. T. (2009). Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), 637-646.10.1061/(ASCE)0733-9364(2009)135:7(637)]Search in Google Scholar