1. bookVolume 11 (2021): Issue 3 (September 2021)
Journal Details
License
Format
Journal
First Published
20 Feb 2019
Publication timeframe
3 times per year
Languages
English
access type Open Access

Factors for Time and Cost Overrun in Public Projects

Published Online: 21 May 2021
Page range: 243 - 254
Received: 22 Dec 2020
Accepted: 15 Mar 2021
Journal Details
License
Format
Journal
First Published
20 Feb 2019
Publication timeframe
3 times per year
Languages
English
Abstract

The construction industry in Pakistan is experiencing a surge in public sector projects due to major investments in infrastructure projects. Project delays and cost overrun are common features in public sector construction projects in Pakistan. Therefore, an understanding of the causes of time and cost overrun in public projects is essential. This paper investigates delay and cost overrun factors within the context of public sector projects in Pakistan. This study identifies 48 potential factors from existing literature and semi-structured interviews were used to refine the identified factors into ten categories. A questionnaire survey was used to establish a hierarchy of factors using descriptive statistics. The results showed that the major causes of time overruns in public projects were (1) legal issues, such as court stay orders, land acquisition, relocation of public facilities; (2) technical errors leading to low-quality drawings, rework, and errors at bidding stage; and (3) Poor project management. The findings of this research contribute to understanding the causes of project delays in public sector projects in Pakistan.

Keywords

Al-Kharashi, A. and Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), 3–23. Search in Google Scholar

Alinaitwe, H., Apolot, R., and Tindiwensi, D. (2013). An investigation into the causes of delay and cost overrun in Uganda’s public sector construction projects. Journal of Construction in Developing Countries, 18(2), 33–47. Search in Google Scholar

Albogamy, A., Scott, D., and Dawood, N. (2013). Dilemma of Saudi Arabian Construction Industry. KICEM Journal of Construction Engineering and Project Management, 3 (4), 34-40, 2233-9582. Search in Google Scholar

Arditi, D., Akan, G.T., and Gurdamar, S. (1985). Cost overruns in public projects. International Journal of Project Management, 3(4): 218-224. Search in Google Scholar

Assaf, S.A. and Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4):349-357. Search in Google Scholar

Azhar, N., Farooqui, R.U., and Ahmed, S.M. (2008). Cost overrun factors in construction industry of Pakistan. Proceedings of the 1st ICCIDC-I conference. Karachi, Pakistan, 499-508. Search in Google Scholar

Aziz, R.F. (2013). Ranking of delay factors in construction projects after Egyptian Revolution. Alaxendria Engineering Journal, 52(3):387-06. Search in Google Scholar

Baloyi, L. and Bekker, M. (2010). “Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa,” Acta Structilia, 51–67. Search in Google Scholar

Chan, D.W.M. and Kumaraswamy, M.M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1):55-63. Search in Google Scholar

Chaudhry, M.A., Zafar, A.M., Siddiqi, Z.A., and Aftab, M. (2019). Causes of delay in Lahore orange line metro train project, Pakistan. Pakistan Journal of Engineering and Technology, 2(2):41-48. Search in Google Scholar

Cheng, Y.M. (2014). An exploration into cost-influencing factors on construction projects. International Journal of Project Management, 32(5): 850-860. doi: 10.1016/j.ijproman.2013.10.003 Search in Google Scholar

Datta, B. (2002). Management of infrastructure projects in urban local bodies: Case study of Kanpur Development Authority. India Infrastructure Report, 207-211. Search in Google Scholar

Doloi, H., Sawhney, A., Iyer, K.C., and Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4):479-489. Search in Google Scholar

Durdyev, S., Ismail, S., and Bakar, N.A. (2010). Factors causing cost overruns in construction of residential projects; Case study of Turkey. Asian Journal of Management Research, 1(1):3-12. Search in Google Scholar

Fatima, A., Saleem, M., and Alamgir, S. (2015). Adoption and Scope of Building Information Modelling (BIM) in Construction Industry of Pakistan. Proceddings of 6th International Conference on Structural Engineering and Construction Management, Kandy, Sri Lanka. 90–99. Search in Google Scholar

Fugar, F.D.K. and Agyakwah-Baah, A.B. (2010). Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, 10(1/2):103-116. Search in Google Scholar

Gardezi, S.S.S., Manarvi, I.A., and Gardezi, S.J.S. (2014). Time extension factors in construction industry of Pakistan. Procedia Engineering, 77:196-204. Search in Google Scholar

Haseeb, M., Xinhai, L., and Bibi A. (2011). Problems of Projects and Effects of Delays in the Construction Industry of Pakistan. Australian Journal of Business and Management Research, 1(5):41-50. Search in Google Scholar

Iyer, KC. and Jha, KN. (2005). Factors affecting cost performance: Evidence from Indian construction projects. International Journal of Project Management, 23(4):283-295. Search in Google Scholar

Jarkas, A. M., and Bitar, C. G. (2012). Factors Affecting Construction Labor Productivity in Kuwait. Journal of Construction Engineering and Management, 148 (7). doi: 10.1061/(ASCE)CO.1943-7862.0000501 Search in Google Scholar

Johnson, R. M., and Babu, R. I. I. (2018). Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management, 0(0), 1–10. doi: 10.1080/15623599.2018.1484864 Search in Google Scholar

Kazaz, A., Manisali, E., and Ulubeyli, S. (2008). Effect of basic motivational factors on construction workforce productivity in Turkey. Journal pf Civil Engineering & Management, 14(2):95-106. Retrieved from http://www.tandfonline.com. Search in Google Scholar

Kim, J., Kang, C., and Hwang, I. (2012). A practical approach to project scheduling: Considering the potential quality loss cost in the time-cost tradeoff problem. International Journal of Project Management, 30(2):264-272. doi: 10.1016/j.ijproman.2011.05.004. Search in Google Scholar

McClave, JT. and Sincich, T. (2018). Statistics, global edition. New York, NY: Pearson Education Limited. Search in Google Scholar

Mansfield, N.R., Ugwu, OO., and Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4):254-260. Search in Google Scholar

Marzouk, M.M. and El-Rasas, T.I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of Advance Research, 5(1):49-55. doi: 10.1016/j.jare.2012.11.005. Search in Google Scholar

Memon, A.H., Rahman, I.A., Asmi A., and Azis, A. (2011). Preliminary study on causative factors leading to construction cost overrun. The International Journal of Sustainable Construction Engineering Technology, 2(1): 57-71. Search in Google Scholar

Moazzami M., Dehghan R., and Ruwanpura, J.Y. (2011). Contractual risks in fast-track projects. Procedia Eng, 14:2552-2557. doi: 10.1016/j.proeng.2011.07.321. Search in Google Scholar

Motaleb, O., and Kishk, M. (2010). An investigation into causes and effects of construction delays in UAE. Proceedings of the 26th Annual Conference- Association of Researchers in Construction Management, Edinburgh, UK, 1149–1157. Search in Google Scholar

Nawaz, D.T., Ikram, A.A., and Qureshi, A.A. (2013). Causes of schedule overruns in Pakistani construction Industry 1. IOSR Journal of Mechanical and Civil Engineering, 5(4):1-11. Search in Google Scholar

Olawale, Y. and Sun M. (2015). Construction project control in the UK: Current practice, existing problems and recommendations for future improvement. International Journal of Project Management, 33(3): 623-637. doi: 10.1016/j.ijproman.2014.10.003. Search in Google Scholar

Pakistan GDP from construction 2006-2019 data: 2020-2022 Forecast: Historical. (2020). Retrieved from https://tradingeconomics.com on February 20, 2021. Search in Google Scholar

Patil, S.K. and Desai, D.B. (2013). Causes of delay in Indian transportation infrastructure projects, International Journal of Research in Engineering and Technology. Retrieved from http://citeseerx.ist.psu.edu on February 20, 2021. Search in Google Scholar

Rahman, I.A., Memon, A.H., and Karim, A.T.A. (2013). Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Sciences, 13(2):286-293. Search in Google Scholar

Rahsid, Y., Haq, S., and Aslam, M.S. (2013). Causes of delay in construction projects of Punjab-Pakistan: An empirical study. Journal of Basic and Applied Scientific Research, 3(10)87-96 3(10):87-96. Search in Google Scholar

Rawalpindi-Islamabad Metrobus R-I (2019). SAMA, Retrieved from https://en.wikipedia.org on February 20, 2021. Search in Google Scholar

Shehu, Z., Endut, I.R., Akintoye, A., and Holt, G.D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. The International Journal of Project Management, 32(8): 1471-1480. doi: 10.1016/j.ijproman.2014.04.004. Search in Google Scholar

Sweis, G.J., Sweis, R.J., Abu Hammad, A.A., and Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6):665-674. Search in Google Scholar

Tanis, E.A, and Hogg, R.V. (2008). A brief course in mathematical statistics: Upper Saddle River, Pearson Prentice Hall. Search in Google Scholar

TransPeshawar (2020). Retrieved from https://en.wikipedia.org on February 20, 2021. Search in Google Scholar

Zakaria, Z., Ismail, S., and Yusof, A. (2012). Cause and Impact of Dispute and Delay the Closing of Final Account in Malaysia Construction Industry. Journal of Southeast Asian Research, 2012, 1–12. doi: 10.5171/2012.975385 Search in Google Scholar

Recommended articles from Trend MD

Plan your remote conference with Sciendo