Predicting Cost Contingency Using Analytical Hierarchy Process and Multi Attribute Utility Theory

Published Online: 21 May 2021
Page range: 228 - 242
Received: 04 Dec 2020
Accepted: 15 Mar 2021
Journal Details
License
Format
Journal
First Published
20 Feb 2019
Publication timeframe
3 times per year
Languages
English
Abstract

An endeavor to predict the optimum contingency value that balances between maintaining business competitiveness and achieving project objectives is definitely an essential contributor to the survival of contractors. The chief objective of this research, therefore, is to develop a mathematical prediction model of the optimum cost contingency value for building projects in Saudi Arabia. The analytical hierarchy process (AHP) technique was used to define the most significant risk factors inherent in public work projects. The multi attribute utility theory (MAUT) technique was used to measure contractors’ risk attitudes and to establish the utility functions through MATLAB. The required data to build the model for the AHP and MAUT were collected from 17 contractors mostly through intensive face-to-face interviews and email-response to a developed structured questionnaire. The integrated contingency model reflects the basic dimensions of risk and considers the various risk attitudes of contractors. The model has been implemented in prototype software using object-oriented programming. Two completed local building construction projects were used to validate and demonstrate the use of the developed model in recommending the optimum cost contingency value for building projects in Saudi Arabia. The developed model was proven reliable in estimating the contingency with an accuracy skewed 9% to the high side.

Keywords

AACE International. (2019). Cost Engineering Terminology. Recommended Practice 10S-90, Morgantown, W.Va. Search in Google Scholar

Afetornu, C. and Edum-Fotwe, F. T. (2005). Characterising project contingency budget in construction. In: Khosrowshahi, F (Ed.), 21st Annual ARCOM Conference. SOAS, University of London. Association of Researchers in Construction Management, 1, 259-68. Search in Google Scholar

Akinradewo, O. F. and Awodele, O. A. (2016). Evaluation of the adequacy and utilization of contingency fund in building projects in Nigeria. Open Access Library Journal, 3(09), 1–12. Search in Google Scholar

Akinradewo, O., Ngwenya, L., Aigbavboa, C., Thwala, W., and Mphela, L. (2019). Improving the efficacy of cost contingency plans for construction projects in South Africa. 1st International Conference on Sustainable Infrastructural Development. IOP Conf. Series: Materials Science and Engineering, 640, 012030. Search in Google Scholar

Akintoye, A. S. and MacLeod, M. J. (1997). Risk analysis and management in construction. International Journal of Project Management, 15(1), 31–38. Search in Google Scholar

Alshamrani, O., Alshibani, A., and Alogaili, M. (2018). Analytic hierarchy process & multi attribute utility theory based approach for the selection of lighting systems in residential buildings: A case study. Buildings, 8(6), 73. Search in Google Scholar

Antoniou, F., Konstantinidis, D., and Aretoulis, G. N. (2016). Application of the multi attribute utility theory for the selection of project procurement system for Greek highway projects. International Journal of Management and Decision Making, 15(2), 83-112. Search in Google Scholar

Asamoah, R., Danku, J., and Amissah, P. (2013). Estimating contingency sum for building works in Ghana. Science, Technology, and Development, 32 (3), 266-275. Search in Google Scholar

Baccarini, D. (2005). Understanding project cost contingency: A survey. Proc., COBRA International Construction Conference. Queensland University of Technology, Australia. Search in Google Scholar

Bakhshi, P. and Touran, A. (2014). An overview of budget contingency calculation methods in construction industry. Procedia Engineering, 85, 52–60. Search in Google Scholar

Chen, D. and Hartman, F. T. (2000). A neural network approach to risk assessment and contingency allocation. AACE International Transactions, RI7A. Search in Google Scholar

Chen, Y., Okudan, G. E., and Riley, D. R. (2010). Decision support for construction method selection in concrete buildings: prefabrication adoption and optimization. Automation in Construction, 19, 665–675. Search in Google Scholar

Chiang, Y. H. (2009). Subcontracting and its ramifications: a survey of the building industry in Hong Kong. International Journal of Project Management, 27(1), 80–88. Search in Google Scholar

Contractor Classification Agency. (2019). Saudi Arabia: Ministry of Municipal and Rural Affairs. Search in Google Scholar

Dalal, J., Mohapatra, P., and Mitra, G. (2010). Prioritization of rural roads: AHP in group decision. Engineering, Construction and Architectural Management, 17, 135–158. Search in Google Scholar

Darko, A., Chan, A., Ameyaw, E., Owusu, E., Pärn, E., and Edwards, D. (2018). Review of Application of analytic hierarchy process (AHP) in construction. International Journal of Construction Management, 19(5), 436–452. Search in Google Scholar

Doloi, H. (2008). Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), 841-854. Search in Google Scholar

Dozzi, S., AbouRizk, S., and Schroeder, S. (1996). Utilitytheory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), 119–124. Search in Google Scholar

Eldosouky, I., Ibrahim, A., and Mohammed, H. (2014). Management of construction cost contingency covering upside and downside risks. Alexandria Engineering Journal, 53(4), 863–881. Search in Google Scholar

El-Touny, A. S., Ibrahim, A. H., and Amer, M. I. (2014). Estimating cost contingency for highway construction projects using analytic hierarchy processes. International Journal of Computer Science Issues, 11(6), 73. Search in Google Scholar

Filip, F. G. (2002). Decizie Asistată de Calculator. Editura Tehnică. Bucureşti. Search in Google Scholar

Ganiyu, A. (2010). Subcontracting strategy in industrial projects. Doctoral dissertation, King Fahd University of Petroleum and Minerals. Search in Google Scholar

Goepel, K. D. (2018). Implementation of an online software tool for the analytic hierarchy process (AHPOS). International Journal of the Analytic Hierarchy Process, 10 (3), 469–487. Search in Google Scholar

Hammad, M., Abbasi, A., and Ryan, M. (2016). Allocation and management of cost contingency in projects. Journal of Management in Engineering, 32(6), 04016014. Search in Google Scholar

Iqbal, S., Choudhry, R., Holschemacher, K., Ali, A., and Tamošaitienė, J. (2015). Risk management in construction projects. Technological and Economic Development of Economy, 21(1), 65–78. Search in Google Scholar

Islam, M., Nepal, M., Alam, A., and Arifuzzaman, M. (2019). Cost contingency modelling for construction projects: insight from the literature. International Conference on Innovation and Intelligence for Informatics, Computing, and Technologies. IEEE, 1-5. Search in Google Scholar

Jayasudha, K. and Vidivelli, B. (2016). Analysis of major risks in construction projects. Journal of Engineering and Applied Sciences, 11(11), 6943–6950. Search in Google Scholar

Keeney, R. L. and Raiffa, H. (1975). Decision Analysis with Multiple Conflicting Objectives Preference and Value Tradeoffs. Search in Google Scholar

Kish, L. (1995). Survey Sampling. John Wiley and Sons. New York. Search in Google Scholar

Lavanya, N. and Malarvizhi, T. (2008). Risk analysis and management: a vital key to effective project management. PMI® Global Congress 2008—Asia Pacific, Sydney, New South Wales, Australia. Newtown Square, PA: Project Management Institute. Search in Google Scholar

Lifson, M. W. and Shaifer, E. F. (1982). Decision and Risk Analysis for Construction Management. Wiley. New York. Search in Google Scholar

Mak, S. and Picken, D. (2000). Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), 130–136. Search in Google Scholar

Marzouk, M. and Moselhi, O. (2003). A decision support tool for construction bidding. Construction Innovation, 3(2), 111–124. Search in Google Scholar

Mills, A., Love, P. E., and Williams, P. (2009). Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), 12–16. Search in Google Scholar

Mohamed, D., Srour, F., Tabra, W., and Zayed, T. (2009). A Prediction Model for Construction Project Time Contingency. Construction Research Congress 2009: Building a Sustainable Future pp. 736-745. Search in Google Scholar

Patrascu, A. (1988). Construction cost engineering handbook. CRC Press. Search in Google Scholar

Nelson, D. (2013). What is Constructive about Acceleration? Hill International, Inc. Search in Google Scholar

Nepal, M. P., Park, M., and Son, B. (2006). Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), 182–188. Search in Google Scholar

Neufville, R. D. and King, D. (1991). Risk and need-forwork premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), 659–673. Search in Google Scholar

Political, Economic and Social Development. (2016). Saudi Arabia: Ministry of Foreign Affairs. Search in Google Scholar

Project Management Institute (PMI). (2017). A Guide to the Project Management Body of Knowledge. 6th Edition. PMI. Newtown Square: Search in Google Scholar

Rehacek, P. (2017). Risk management in construction projects. Journal of Engineering and Applied Sciences, 12(20), 5347–5352. Search in Google Scholar

Rey, S. (2001). Mathematical Models in Geography. International Encyclopedia of the Social and Behavioral Sciences, 9393–9399. Elsevier Inc. Search in Google Scholar

Saaty, T. L. (1980). The Analytic Hierarchy Process. McGraw Hill. New York. Search in Google Scholar

Shash, A. A. (1998). Bidding practices of subcontractors in colorado. Journal of Construction Engineering and Management, 124(3), 219–225. Search in Google Scholar

Slovic, P., Fischhoff, B., and Lichtenstein, S. (1984). Behavioral decision theory perspectives on risk and safety. Acta Psychologica, 56(1-3), 183–203. Search in Google Scholar

Smith, G. R. and Bohn, C. M. (1999). Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), 101–108. Search in Google Scholar

Sonmez, R., Ergin, A., and Birgonul, M. T. (2007). Quantitative methodology for determination of cost contingency in international projects. Journal of Management in Engineering, 23(1), 35–39. Search in Google Scholar

Survey of Construction Activity. (2018). Saudi Arabia: General Authority for Statistics. Search in Google Scholar

Tang, O. and Musa, S. (2011). Identifying risk issues and research advancements in supply chain risk management. International Journal of Production Economics, 133(1), 25–34 Search in Google Scholar

Thompson, P. A., and Perry, J. G. (Eds.). (1992). Engineering construction risks: A guide to project risk analysis and assessment implications for project clients and project managers. Thomas Telford. Search in Google Scholar

Wang, J. and Yuan, H. (2011). Factors affecting contractors’ risk attitudes in construction projects: Case study from China. International Journal of Project Management, 29(2), 209–219. Search in Google Scholar

Zou, P. X., Zhang, G., and Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601–614 Search in Google Scholar