An Investigation into the Use of Laney U Chart as a Visual Schedule Tracker to Graphically Monitor the Schedule Performance Index

Published Online: 16 Jan 2020
Page range: 35 - 41
Received: 25 Sep 2019
Accepted: 08 Nov 2019
Journal Details
License
Format
Journal
First Published
20 Feb 2019
Publication timeframe
2 times per year
Languages
English
Copyright
© 2020 Sciendo

The intent of this article is to explore a mathematically sound method to graphically monitor schedule performance index (SPI) such that it enables the project manager to take objective data based decisions regarding the progress of the project schedule. The article aims to leverage the theory and application of control charts, specifically the U chart and Laney U chart and test its applicability to earned value management by trending schedule performance index on a time series chart. Off the shelf software, MinitabTM was used to generate the control charts based on earned value and planned value. While this paper proves that the Laney U chart, with correct interpretation, acts as an effective trigger-based tool for schedule risk management, it also generates further avenues for research into similar use of control charts for cost performance and other quality indices.

Keywords

Anbari, F. T. (2003). Earned value project management method and extensions. Project management journal, 34(4), 12-23.Search in Google Scholar

Fleming, Q. W., & Koppelman, J. M. (2016). Earned value project management. Newtown Square, Pennsylvania: Project Management Institute.Search in Google Scholar

Hansen, J. P. (2007). Population control charts for population data. Journal for Healthcare Quality, 29(1), 29-36.Search in Google Scholar

Jacob, D., (2003). Forecasting Project Schedule Completion with Earned Value Metrics, The Measurable News, 1, 7-9.Search in Google Scholar

Jones, G., & Govindaraju, K. (2001). A Graphical Method for Checking Attribute Control Chart Assumptions. Quality Engineering, 13(1), 19-26.Search in Google Scholar

Khesal, T., Saghaei, A., Khalilzadeh, M., Rahiminezhad Galankashi, M., & Soltani, R. (2019). Integrated cost, quality, risk and schedule control through earned value management (EVM). Journal of Engineering, Design and Technology, 17(1), 183-203.Search in Google Scholar

Laney, D. (2007). P-Charts and U-Charts Work (But Only Sometimes). Quality Digest, 14(4). Retrieved from https://www.qualitydigest.com/may07/departments/what_works.shtml on October 10, 2019.Search in Google Scholar

Laney, D. B. (2002). Improved control charts for attributes. Quality Engineering, 14(4), 531-537.Search in Google Scholar

Leu, S. S., Lin, Y. C., Chen, T. A., & Ho, Y. Y. (2006). Improving traditional earned value management by incorporating statistical process charts. Proceedings of ISARC, 275-280.Search in Google Scholar

Lipke, W. (2002). Statistical Process Control of Project Performance. The Measurable News, 25-28.Search in Google Scholar

Lipke, W., & Vaughn, J. (2000). Statistical process control meets earned value. CrossTalk: The Journal of Defense Software Engineering, 13.Search in Google Scholar

Lipke, W., 2003, Schedule is different, The Measurable News, March 2003, 31-34Search in Google Scholar

Moon, J. (2018). Theory and Application of J Charts for Holistic Risk Based Statistical Adverse Event Trending. International Journal of Health and Economic Development, 4(1), 9-31.Search in Google Scholar

Oakland, J. S. (2007). Statistical process control. Routledge. Linacre House, Jordan Hill: Butterworth-HeinemannSearch in Google Scholar

Prayogi, R., Pratami, D., Puspita, I. A., & Bermano, A. R. (2019). Measuring Schedule Performance of Fiber to The Home Project Using Earned Value Management. In 2018 International Conference on Industrial Enterprise and System Engineering (IcoIESE 2018). Atlantis Press.Search in Google Scholar

Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International journal of project management, 24(4), 289-302.Search in Google Scholar