An Integrated Lean Six Sigma Approach to Modeling and Simulation: A Case Study from Clothing SME

Published Online: 17 Jul 2021
Page range: -
Journal Details
License
Format
Journal
First Published
19 Oct 2012
Publication timeframe
4 times per year
Languages
English
Abstract

To improve quality, production, and service delivery, clothing industries look toward continuous improvement approaches such as lean manufacturing, Six Sigma, and Lean Six Sigma (LSS). Simulation is one of the effective methods which aim to examine different solution scenarios. This study explores how LSS and simulation can be integrated based on the Sim-Lean approach, using a process improvement effort in clothing small–medium enterprises (SMEs). A structured framework integrating these research methodologies is developed, which might benefit a variety of future clothing process improvement efforts, and could inform quality improvement efforts in other industries. The aim is to allow a successful implementation of the approach in the clothing industry to improve the lead time, the daily output, the average staying times (min) of jobs waiting in queues, and the resource utilization.

Keywords

Introduction

Taking into account the needs and problems of the textile industries, which they are facing enormous and multiple challenges and are forced to urgently adopt structural adjustment plans and raise their level of management and improve their processes [1,2,3]. Lean, Six Sigma, and Lean Six Sigma (LSS) are popular approaches in the continuous improvement of the production and the quality within manufacturing firms which can be ensured by the combination of the reduction in process variation used in Six Sigma and the elimination of non-added value by Lean approach [4]. Indeed, this method is widely used in manufacturing firms in the world and is applied in different industrial fields including manufacturing [5,6,7,8,9], services [10, 11], commercials [12], health care [3, 13], and logistics [14]. Many authors have started to identify the benefits that can be gained when combining lean, Six Sigma, LSS, and simulation as a new concept. Hahn et al. [15] use simulation with Six Sigma to evaluate and assess candidate decisions for difficult business problems and opportunities. While Ferrin et al. [16] discuss how the integration of Six Sigma and computer simulation can reduce the variation and improve a patient's experience in the hospital, Huang et al. [17], in the same context, discuss how simulation modeling and LSS together can facilitate problem identification and generation of suggestions to improve the phlebotomy process.

This paper shows the mutual benefits that can be gained when combining LSS and simulation. A study in clothing small–medium enterprises (SMEs) for this integration and a simplified sewing process are presented. This paper is organized as follows: Section 2 presents the experiments: The implementation of our approach in clothing SMEs and results, while Section 3 presents the conclusion of our research.

Experiments
Methodology

In this work, the modeling and simulation of our process are achieved by integrating the Sim-Lean Model (Figure 1) developed by [18] with an enhanced LSS process based on Feld's streamlined method (Figure 2) [19] using Business Process Modeling Notation (BPMN) language to validate a certain number of indicators and avenues of the process improvement. We propose to support our LSS process by the Sim-Lean approach for the following purposes (Figure 3):

Educational purpose: It can be a way to ensure the training of employees [20]. Also, it can have an educational function, which is to teach the lean, Six Sigma, and LSS concepts in a way that facilitates understanding of the dynamic of our process.

Facilitation purpose: A simulation model is used to present a dynamic process map. In our model, the BPMN standard is used to offer better information.

Evaluation purpose: With a discrete-event simulation model, it becomes possible to facilitate the transition of analytic and quantitative outputs to the current state. Also, to evaluate the future state, several scenarios are tested to ascertain whether this opportunity and the change are feasible to apply to finally choose the best one to implement.

Figure 1

Sim-Lean model: the role of discrete-event simulation and lean in health care [18].

Figure 2

Feld's streamlined approach to lean manufacturing [19].

Figure 3

Steps of modeling and simulation method.

Each one of the Sim-Lean purposes described above is shown in their corresponding process steps. The process shows how LSS and simulation are supporting each process step. The Define, Measure, Analyze, Innovate, and Control (DMAIC) approach was used to solve the problem in the facilitate mode during our workshop.

First of all, the system is defined. Twenty measurements were taken for each operator to calculate the real process time of every task. Then, data were analyzed, and the distribution fit and goodness are used as inputs to drive the simulation model. Once we have determined the probability distributions for the processing times, the simulation model can be run.

First of all, the system is defined. Twenty measurements were taken for each operator to calculate the real process time of every task. Then, data were analyzed, and the distribution fit and goodness are used as inputs to drive the simulation model. Once we have determined the probability distributions for the processing times, the simulation model can be run. The next stage is to test the calibration of the system. Model validation is accomplished by comparing the simulation output with the actual output.

A simulation model is supposed to be valid when the percentage of the difference between the simulation output and the actual output is <10%. The percentage of error is calculated as follows: Percentageoferror=SimulationOutput-ActualOutputActualOutput×100{\rm{Percentage}}\,{\rm{of}}\,{\rm{error}} = {{{\rm{Simulation}}\,{\rm{Output}} - {\rm{Actual}}\,{\rm{Output}}} \over {{\rm{Actual}}\,{\rm{Output}}}} \times 100

We added the future state validation before implementation using the DES simulation. Once the future state is validated and the decision is taken, the implementation step is started and LSS is applied. The step is performed using discrete-event computer simulation by the BPMN model. DES ensures that the Sim-Lean approach can support the evaluation of this implementation. According to Huang et al. [17], if the object condition has not been achieved, the simulation model is used to analyze the reasons for failure and ascertain the requirements to ensure the success of the implementation. Consequently, when lean is supported by simulation, it becomes more powerful and makes great contributions to companies. For the current research, we choose the Bizagi Process Modeler to model and simulate our process using the BPMN standard [21].

Approach implementation within clothing SMEs

The approach was implemented in a clothing SME in Tunisia, specialized in workwear. Its products cover a wide range of areas: high-visibility clothing, basic models, professional and branded clothing, military clothing, non-flammable and waterproof clothing, kitchen clothing, hospitality clothing, and medical clothing, as well as custom clothing with options. The industry suffers from a high defect rate and productivity problems. The approach application must have gone through the DMAIC sequence of steps developed in detail in the rest of this work.

Define

This stage allows understanding the process and determining performance indicators. Interviews, meetings, observations, project charters, and spreadsheets were realized as primary tools to achieve this stage. The industry consists of a cutting unit, a manufacturing unit, and a finishing unit. To collect enough data, >100 h of observation were required, divided between these units. Four months were spent for the project application. As management commitment is the most important key to LSS implementation success, a meeting was prepared by the head managers to explain to the employees the importance and the need for the LSS project and its deliverables. Meetings were held before several observations. The team is composed of the leader (quality management manager), lean facilitator (the author), quality manager, and production manager. A project charter consists of detailing the problem statement: Project justification, objectives, definition, and risks were developed.

During the Sim-Lean Educate, the lean facilitator gives lean, Six Sigma, and LSS lessons to the participants. In addition, a brainstorming session was conducted, which focused on the means to understand and improve the current process.

At the end of the Define stage, the main objective of the project was determined: to reduce the “trousers” process flow time to 14 min. A project charter—including a problem statement and project scope—was developed.

Measure

In this step, data on measurable indicators of production processes are collected. The primary outputs from the Measure step were detailed process maps. In our case, we used the BPMN standard to model our process, process activities, and the current system simulation model. To achieve this, the methods used included interviews, observations, time studies, and summarizing data in a spreadsheet.

Process mapping

Since BPMN and BPSim are integrated into the BiZagi software, the analyzed process was the production flow of a Tunisian clothing SME. Using the BiZagi software, the draft process map is represented in the form of a belt in BPMN. Figure 4 shows the BPMN model: the chronological sequence of assembly operations needed to transform raw materials into sewed products. The “trousers” production cycle includes different steps of assembly operations to transform raw materials into the finished product, namely trousers. There are mainly four sequences of steps, namely: (i) pre-preparation of pockets; (ii) production of the back of trousers; (iii) production of the front of trousers; and (iv) assembling of fabric parts.

Figure 4

BPMN diagram model of trousers’ sewing processes. BPMN, Business Process Modeling Notation.

This model retains interviews, and observations were used initially to gain more insights into the process and determine which data were relevant for the time study. Informal interviews with the stakeholders were also carried out during the observation and even during the time study to gather information about the process, as well as staff activities between steps. The standard time can be calculated using the following formula: Standardtime=normaltime*(1+allowance){\rm{Standard}}\,{\rm{time}} = {\rm{normal}}\,{\rm{time}}\,*\,\left( {1 + {\rm{allowance}}} \right)

The results of the reference layout model are shown in Table 1 according to the performance measures. From Table 1, it can be observed that the average time for the “trousers” process (lead time) is 14.77 min, the average number of finished trousers in a day is 419.5, and the average staying time of jobs in queues is 657.8 min.

Results based on the current layout model.

Performance measuresAverageStd. DeviationMin.Max.
Lead time14.770.214.214.95
Daily output419.51.9418.3423.3
Waiting time657.81.3643.5672.2
Analyze

In this stage, the causes of the non-value-added activities were determined, the time study was analyzed, and data were analyzed and tested for distribution fit and goodness. This latter is used as input to drive, verify, and validate the simulation model.

Current state verification by simulation

Our simulation model was developed to be as near as possible to the real process to ensure the calibration of our system. The Stat fit Student Version program is used to determine the statistical distributions. Figure 5 shows the histogram of this process distribution. Table 2 summarizes the distributions estimated for all tasks.

Figure 5

Examples of estimated distributions.

Estimated distributions for tasks.

No.TaskFit distributionNo.TaskFit distribution
1Prepare the launchingLognormal (1.25; 0.12)11Close the sides and crotchLognormal (1.45; 0.3)
2Sew back pocket hemLognormal (0.17; 0.014)12Put together waist and liningUniform (0.47; 0.21)
3Sew pocket meterUniform (0.17; 0.020)13Attach waistWeibull (0.80; 0.54)
4Close sub-bridgeNormal (0.15; 0.01)14Execute waistGamma (1.22; 0.54)
5Overcast left front/right front/crotchUniform (0.14; 0.2)15Sew down hemLognormal (0.17; 0.03
6Sew back pocketUniform (0.7; 1)16Make boutonnieresUniform (1.16; 0.2)
7Close pocket bagPoisson (0.3)17Place buttonLognormal (0.25; 0.12)
8Sew zipperBeta (1.20)18ControlUniform (2.29; 0.1)
9Attach back pocket and pocket meterLognormal (1; 0.13)19Measure controlLognormal (0.51; 0.43)
10Attach trousers backGamma (0.45; 0.21)20Pack and shipExponential (1.50; 0.54)

Table 3 shows that the difference between the simulation model and the real process is almost 6%, which is lower than the maximum allowable error (±10%), confirming the validity and calibration of the model to be used to test scenarios.

Validation of the discrete-event simulation model.

Lead time (waiting and service)Waiting time
Real (min)Simulated (min)Gap (%)Real (min)Simulated (min)Gap (%)
Total process time14.7715.865.73657.8698.346.1

It was observed that post 2 “Sew back pocket hem” and post 12 “Put together waistband and lining” blocked the system. Machines are busy with 98.9% and 98.3%, respectively.

Therefore, in the current model, post 2 and post 12 were identified as a bottleneck. The usage of the resources indicates some sub-utilization and over-utilization. Therefore, we confirm the hypothesis about a possible problem of resource capacity.

Improve

To improve the process efficiency, LSS techniques were applied. A Kaizen activity event was planned and directed to ensure that each team member could participate in finding solutions and propose suggestions for the implementation.

The improvement activities begin with the presentation of the objectives by the team members. LSS approach and the results obtained after the measure phase were presented to ensure that all the Kaizen members received the same information; then, models were run, the results were analyzed, and the developed system was validated. The modification of the process mapping can be possibly made when necessary. Several scenarios of the sewing process were tested and are tried by what-if analysis to check if the model still performs adequately. Among the considered decision factors in suggestions, we list the resource utilization, the average waiting time for each sewing process, and the total production. In addition, bottlenecks and weaknesses were determined to construct alternative models to improve the system's performance. Several suggestions from Kaizen members are identified for improving the system. For brevity, only three are listed and tested for the sewing process as given in the following. The results of the three scenarios are provided in Table 4.

Different proposed scenarios.

Scenario 1Change the layout of the sewing process (the sew pocket meter hem post is transferred in parallel with post 2)
Scenario 2Add one extra sewing machine operator for post 12.Train the workers to improve their efficiency.
Scenario 3Add two extra sewing machine operators to the reference layout for post 11 and post 13.

Scenario 2 has the largest positive impact on the fabrication process. As seen in Table 5, the daily production of trousers has increased to 450.3 with Scenario 2 (up by according to the reference system). Also, with the same scenario, the lead time was lower than that of the reference layout, and the average staying times (min) of work waiting in queues were observed to be lower than those of the reference layout.

The results based on different scenarios.

ScenarioPerformance measuresAverageStd. DeviationMin.Max.
Scenario 1Lead time14.50.214.114.6
Daily output422.51.9420424.1
Staying times (min) of jobs waiting in queues6531.3652654
Scenario 2Lead time14.20.11414.5
Daily output450.31.8419458.3
Staying times (min) of jobs waiting in queues650.61.2648655
Scenario 3Lead time14.60.314.214.95
Daily output435.71.7430.6438.3
Staying times (min) of jobs waiting in queues653.71.1655.7659

The daily output of the system has increased to 422.5 with Scenario 1 and 435.7 with Scenario 3. Furthermore, the average staying time with Scenario 3 has decreased to 635.7 min from 657.8 min. To sum up, with these scenarios, the efficiency of the line has increased. Results were presented to the group members, who are interested in the projected flow time. The last step in the improvement stage is implementation.

Scenario 2 is implemented because of its features such as high daily output, low waiting time, and low lead time. The group members conducted an action plan to quickly implement those changes with other lean tools in 30 working days. Lean tools like 5S and FMEA were implemented. Based on the analysis of the spaghetti plot diagram, physical flow is proposed to create a new handling tool by the realization of a finished product evacuation sheath that eliminates the movement of workers and accelerates the flow in all security aspects. Twenty weeks after implementing the modifications, new data were collected. The results before and after improvement are presented in Table 6.

Results before and after improvement.

Before improvementAfter improvement
Lead times (min)14.7714
Daily production (piece)419.5450
Waiting time (min)657.8560

Trousers’ production lead times were reduced from 14.77 min to 14 min (a 5% reduction). The daily production of trousers is increased to 450. (Up by according to the reference system), the average staying time (min) of jobs waiting in queues was found to be 560 min. The gap between what was estimated and the real value after implementation can be explained by limits of the discrete-event simulation model, which did not take into account machine breakdowns, changing apparatus, and the fabric loss.

Control

The applied improvements have been fully integrated into the training regime and the process documentation, and the information related to company performance was shared among the employees. Visual management, total productive maintenance, and process FMEA are to be implemented after completion of the project to provide a visual aid for controlling the relevant key input and output variables and to ensure that the team could not revert to old habits. The control charts are a powerful tool for achieving process control and stability.

CONCLUSION

The sewing process affects several improvement outcomes, but it has rarely been studied in the literature. In addition, LSS and simulation have rarely been combined and used in a single sewing process improvement study. This study aimed to understand and improve the trousers’ sewing process, as well as provide an integrated framework by using three approaches. The simulation models and statistical results showed that all scenarios can result in a significant improvement in the sewing processes. The “trousers” process flow time achieves an improvement from 14.77 min to 14 min—a 5% reduction—which is considered important in clothing SMEs. Therefore, the framework was created to guide future sewing process improvement efforts in textile industries. There are a few limitations to this study. Other major stochastic variables (machine breakdown, repair, absence rate, absenteeism, the work of the supervisor, maintenance, etc.) are not used to detail the model in this study. Future work could investigate a wider range of performance measures and developments to be implemented in other SME clothing industries.

Figure 1

Sim-Lean model: the role of discrete-event simulation and lean in health care [18].
Sim-Lean model: the role of discrete-event simulation and lean in health care [18].

Figure 2

Feld's streamlined approach to lean manufacturing [19].
Feld's streamlined approach to lean manufacturing [19].

Figure 3

Steps of modeling and simulation method.
Steps of modeling and simulation method.

Figure 4

BPMN diagram model of trousers’ sewing processes. BPMN, Business Process Modeling Notation.
BPMN diagram model of trousers’ sewing processes. BPMN, Business Process Modeling Notation.

Figure 5

Examples of estimated distributions.
Examples of estimated distributions.

Validation of the discrete-event simulation model.

Lead time (waiting and service)Waiting time
Real (min)Simulated (min)Gap (%)Real (min)Simulated (min)Gap (%)
Total process time14.7715.865.73657.8698.346.1

Estimated distributions for tasks.

No.TaskFit distributionNo.TaskFit distribution
1Prepare the launchingLognormal (1.25; 0.12)11Close the sides and crotchLognormal (1.45; 0.3)
2Sew back pocket hemLognormal (0.17; 0.014)12Put together waist and liningUniform (0.47; 0.21)
3Sew pocket meterUniform (0.17; 0.020)13Attach waistWeibull (0.80; 0.54)
4Close sub-bridgeNormal (0.15; 0.01)14Execute waistGamma (1.22; 0.54)
5Overcast left front/right front/crotchUniform (0.14; 0.2)15Sew down hemLognormal (0.17; 0.03
6Sew back pocketUniform (0.7; 1)16Make boutonnieresUniform (1.16; 0.2)
7Close pocket bagPoisson (0.3)17Place buttonLognormal (0.25; 0.12)
8Sew zipperBeta (1.20)18ControlUniform (2.29; 0.1)
9Attach back pocket and pocket meterLognormal (1; 0.13)19Measure controlLognormal (0.51; 0.43)
10Attach trousers backGamma (0.45; 0.21)20Pack and shipExponential (1.50; 0.54)

Different proposed scenarios.

Scenario 1Change the layout of the sewing process (the sew pocket meter hem post is transferred in parallel with post 2)
Scenario 2Add one extra sewing machine operator for post 12.Train the workers to improve their efficiency.
Scenario 3Add two extra sewing machine operators to the reference layout for post 11 and post 13.

Results before and after improvement.

Before improvementAfter improvement
Lead times (min)14.7714
Daily production (piece)419.5450
Waiting time (min)657.8560

Results based on the current layout model.

Performance measuresAverageStd. DeviationMin.Max.
Lead time14.770.214.214.95
Daily output419.51.9418.3423.3
Waiting time657.81.3643.5672.2

The results based on different scenarios.

ScenarioPerformance measuresAverageStd. DeviationMin.Max.
Scenario 1Lead time14.50.214.114.6
Daily output422.51.9420424.1
Staying times (min) of jobs waiting in queues6531.3652654
Scenario 2Lead time14.20.11414.5
Daily output450.31.8419458.3
Staying times (min) of jobs waiting in queues650.61.2648655
Scenario 3Lead time14.60.314.214.95
Daily output435.71.7430.6438.3
Staying times (min) of jobs waiting in queues653.71.1655.7659

Caputo, A. C., Palumbo, M. (2005). Manufacturing re-insourcing in the textile industry: A case study. Industrial Management and Data systems, 105(2), 193–207.CaputoA. C.PalumboM.2005Manufacturing re-insourcing in the textile industry: A case studyIndustrial Management and Data systems1052193207Search in Google Scholar

Chan, K. C., Hui, P. C., Yeung, K. W., Ng, F. S. (1998). Handing the assembly line balancing problem in the clothing industry using a genetic algorithm. International Journal of Clothing Science and Technology, 10, 21–37.ChanK. C.HuiP. C.YeungK. W.NgF. S.1998Handing the assembly line balancing problem in the clothing industry using a genetic algorithmInternational Journal of Clothing Science and Technology102137Search in Google Scholar

RajaKumar, S., Arunachalan, V. P., Selladurai, V. (2005). Simulation of work flow balancing in assembly shop-floor operations. Journal of Manufacturing Technology Management, 16, 265–281.RajaKumarS.ArunachalanV. P.SelladuraiV.2005Simulation of work flow balancing in assembly shop-floor operationsJournal of Manufacturing Technology Management16265281Search in Google Scholar

Smith, B. (2003). Lean and Six Sigma-a One-two Punch. Quality Progress, 36(4), 37–41.SmithB.2003Lean and Six Sigma-a One-two PunchQuality Progress3643741Search in Google Scholar

Ben Ruben, R., Vinodh, S., Asokan, P. (2017). Implementation of Lean Six Sigma framework with environmental considerations in an Indian automotive component manufacturing firm: A case study. Production Planning & Control, 28(15), 1193–1211.Ben RubenR.VinodhS.AsokanP.2017Implementation of Lean Six Sigma framework with environmental considerations in an Indian automotive component manufacturing firm: A case studyProduction Planning & Control281511931211Search in Google Scholar

Krueger, D. C., Mellat Parast, M., Adam, S. (2014). Six sigma implementation: A Qualitative Case Study Using Grounded Theory. Production, Planning & Control, 25(10), 873–889.KruegerD. C.Mellat ParastM.AdamS.2014Six sigma implementation: A Qualitative Case Study Using Grounded TheoryProduction, Planning & Control2510873889Search in Google Scholar

Timans, W., Antony, J., Ahaus, K., van Solingen, R. (2012). Implementation of Lean Six Sigma in small- and medium-sized manufacturing enterprises in the Netherlands. Journal of the Operational Research Society, 63(3), 339–353.TimansW.AntonyJ.AhausK.van SolingenR.2012Implementation of Lean Six Sigma in small- and medium-sized manufacturing enterprises in the NetherlandsJournal of the Operational Research Society633339353Search in Google Scholar

Anderson, N. C., Kovach, J. V. (2014). Reducing welding defects in turnaround projects: A Lean Six Sigma Case Study. Quality Engineering, 26(2), 168–181.AndersonN. C.KovachJ. V.2014Reducing welding defects in turnaround projects: A Lean Six Sigma Case StudyQuality Engineering262168181Search in Google Scholar

Kumar, M., Antony, J., Singh, R. K., Tiwari, M. K., Perry, D. (2006). Implementing the Lean Sigma framework in an Indian SME: A Case Study. Production Planning and Control, 17(4), 407–423.KumarM.AntonyJ.SinghR. K.TiwariM. K.PerryD.2006Implementing the Lean Sigma framework in an Indian SME: A Case StudyProduction Planning and Control174407423Search in Google Scholar

Sunder, V., Antony, J. (2015). Six-sigma for improving topbox customer satisfaction score for a banking call centre. Production, Planning and Control, 26(16), 1291–1305.SunderV.AntonyJ.2015Six-sigma for improving topbox customer satisfaction score for a banking call centreProduction, Planning and Control261612911305Search in Google Scholar

Sunder, M. V. (2016). Rejects reduction in a retail bank using Lean Six Sigma. Production Planning & Control, 27(14), 1131–1142.SunderM. V.2016Rejects reduction in a retail bank using Lean Six SigmaProduction Planning & Control271411311142Search in Google Scholar

Garza-Reyes, J. A., Flint, A., Kumar, V., Antony, J., Soriano-Meier, H. A. (2014). A DMAIRC approach to lead time reduction in an aerospace engine assembly process. Journal of Manufacturing Technology Management, 25(1), 27–48.Garza-ReyesJ. A.FlintA.KumarV.AntonyJ.Soriano-MeierH. A.2014A DMAIRC approach to lead time reduction in an aerospace engine assembly processJournal of Manufacturing Technology Management2512748Search in Google Scholar

Zhang, M., Wang, W., Goh, T. N., He, Z. (2015). Comprehensive six sigma application: A Case Study Production, Planning & Control, 26(3), 219–234.ZhangM.WangW.GohT. N.HeZ.2015Comprehensive six sigma application: A Case StudyProduction, Planning & Control263219234Search in Google Scholar

Garza-Reyes, J. A., Al-Balushi, M., Antony, J., Kumar, V. (2016). A Lean Six Sigma framework for the reduction of ship loading commercial time in the iron ore pelletising industry. Production Planning & Control, 27(13), 1092–1111.Garza-ReyesJ. A.Al-BalushiM.AntonyJ.KumarV.2016A Lean Six Sigma framework for the reduction of ship loading commercial time in the iron ore pelletising industryProduction Planning & Control271310921111Search in Google Scholar

Hahn, G. J., Doganaksoy, N., Hoerl, R. (2000). The evolution of six sigma. Quality Engineering, 12(3), 317–326.HahnG. J.DoganaksoyN.HoerlR.2000The evolution of six sigmaQuality Engineering123317326Search in Google Scholar

Ferrin, D. M., Miller, M. J., Muthler, D. (2005). Lean sigma and simulation, so what's the correlation? V2. In Proceedings of the 2005 Winter Simulation Conference, 2005, 5.FerrinD. M.MillerM. J.MuthlerD.2005Lean sigma and simulation, so what's the correlation? V2InProceedings of the 2005 Winter Simulation Conference20055Search in Google Scholar

Huang, Y., Klassen, K. J. (2016). Using six sigma, lean, and simulation to improve the phlebotomy process. Quality Management Journal, 23(2), 6–21.HuangY.KlassenK. J.2016Using six sigma, lean, and simulation to improve the phlebotomy processQuality Management Journal232621Search in Google Scholar

Robinson, S., Radnor, Z. J., Burgess, N., Worthington, C. (2012). SimLean: Utilising simulation in the implementation of lean in healthcare. European Journal of Operational Research, 219(1), 188–197.RobinsonS.RadnorZ. J.BurgessN.WorthingtonC.2012SimLean: Utilising simulation in the implementation of lean in healthcareEuropean Journal of Operational Research2191188197Search in Google Scholar

Feld, W. M. (2001). Lean manufacturing: Tools, techniques, and how to use them. Boca Raton: St. Lucie Press: APICS.FeldW. M.2001Lean manufacturing: Tools, techniques, and how to use themBoca RatonSt. Lucie Press: APICSSearch in Google Scholar

Adams, M., Componation, P., Czarnecki, H., Schroer, B. J. (1999). Simulation as a tool for continuous process improvement. In Proceedings of the 1999 Winter Simulation Conference, edited by P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, 766–773.AdamsM.ComponationP.CzarneckiH.SchroerB. J.1999Simulation as a tool for continuous process improvementInProceedings of the 1999 Winter Simulation Conferenceedited byFarringtonP. A.NembhardH. B.SturrockD. T.EvansG. W.766773Search in Google Scholar

OMG. (2011). Business Process Model and Notation (BPMN): OMG available specification, version 2.0 Retrieved 14 June 2016, from www.omg.org/spec/BPMN/2.0OMG2011Business Process Model and Notation (BPMN): OMG available specification, version 2.0Retrieved 14 June 2016, from www.omg.org/spec/BPMN/2.0Search in Google Scholar

Recommended articles from Trend MD

Plan your remote conference with Sciendo